Scope

GB/T 37404-2019 is the English-translated version of 高压电动机软起动装置应用导则.

GB/T 37404-2019 is the Chinese standard "Application guide of soft-start device for high-voltage motor".

Its scope clause reads: This Standard specifies terms and definitions, classification, parameters required for type selection calculation, starting scheme, bypass of soft-start device for high-voltage motor (hereinafter referred to as the "soft-start device").

This Standard is applicable to the soft-start device of which the rated working voltage is 3kV~10kV, the input frequency is 50Hz or 60Hz. Its clauses include terms and definitions; classification; type selection calculation; starting schemes; bypass.

It was issued by the State Administration for Market Regulation on MAY 10, 2019 and took effect on DECEMBER 01, 2019.

Found what you need?

Document preview — GB/T 37404-2019

National Standard of the People's Republic of China

ICS
29.200
Classification
K 46

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword3
  • 1 Scope4
  • 2 Normative references4
  • 3 Terms and definitions4
  • 4 Classification5
  • 5 Type selection calculation5
  • 6 Starting schemes8
  • 7 Bypass12

1 Scope

This Standard specifies terms and definitions, classification, parameters required for type selection calculation, starting scheme, bypass of soft-start device for high-voltage motor (hereinafter referred to as the "soft-start device").

This Standard is applicable to the soft-start device of which the rated working voltage is 3kV~10kV, the input frequency is 50Hz or 60Hz.

2 Normative references

The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.

GB/T 33595-2017, Motor soft-start device - Method of type designation

GB/T 33984-2017, Motor soft-start device - Terminology

GB 50217-2018, Standard for design of cables of electric power engineering

3 Terms and definitions

For the purposes of this document, the terms and definitions defined in GB/T 33984-2017 as well as the followings apply.

3.1 Bypass

A process that closes the short-circuit switch connected in parallel with the soft-start device so that no current flows through the soft-start device.

3.2 Bypass switch

A switch that conducts the bypass, which short-circuits the soft-start device and the soft-start circuit during the bypass process.

- rated current;

- rated voltage;

- rated power;

- rated speed;

- moment of inertia;

- torque-speed curve or stall torque multiple at rated voltage;

- current-speed curve or stall current multiple at rated voltage.

- Load parameters:

- moment of inertia / flywheel moment;

- static resistance torque;

- resistance torque-speed curve that is converted to the motor end.

- Power grid parameters:

- grid short-circuit capacity or short-circuit impedance;

- length and specification of incoming cable or overhead line.

- Environmental conditions:

- altitude;

- relative humidity;

- ambient temperature;

- pollution level.

- Process requirements:

- start frequency.

When the relevant parameters change, it shall recalculate the calculation results of the type selection.

5 Type selection calculation

5.2 Performance indicators

The parameter indicators that are specified by users and in accordance with national grid regulations, include:

- pilot differential protection (optional);

- open triangle voltage protection (optional).

NOTE: The setting values of current quick-break protection and over-current protection shall consider the characteristics of the soft-start device.

5.5 Matching type selection

5.5.1 Cable

The type selection of cable shall meet the requirements of GB 50217-2018.

Under the premise that the cable temperature rise is met in the starting circuit, the capacity can be reduced.

When it uses a high-voltage variable-frequency soft-start device and when the output side is connected to the motor at a long distance, it is advisable to calculate the damage to the motor caused by the voltage spikes generated by the output harmonics.

5.5.2 Switch

It shall select the breaking capacity of corresponding switch according to the short-circuit capacity of the power grid. The starting circuit shall choose a switch of the appropriate current level according to the starting current ratio. The bypass circuit shall select a switch of the appropriate current level according to the motor rated current.

5.6 Loss

Due to the short-term operation of the soft-start device, it is unnecessary for the soft-start device manufacturer to calculate the loss.

6 Starting schemes

6.1 Typical scheme of motor stator to side-connect soft-start device

6.1.1 One-for-one system scheme

The one-for-one system scheme is shown as Figure 1.

3 - Bypass switch (contactor or circuit breaker);

4 - Starting circuit switch (contactor or circuit breaker);

5 - Soft-start device.

Figure 3 -- Typical scheme of motor rotor to side-connect soft-start device Connect the soft-start device to the rotor side of the motor. After the soft-start device and the process are ready, the signal shall be sent to the central control system. The central control system shall send the well-preparation signal. The power incoming switch shall be closed. After the site or the central system sends a command, the starting and operation switches 2 and 4 shall be closed and the soft-start device shall be put into operation. After the soft-start device detects that the motor meets the bypass conditions, the bypass switch shall close, starting and operation switch 4 shall be disconnected, the soft-start device shall stop operating and the starting shall be completed.

When the back-end circuit of the starting and operating switch is short-circuited, it shall have the ability to interrupt the short-circuit current.

7 Bypass

7.1 Overview

After the motor is driven by the soft-start device to near the rated speed, it shall be connected to the grid for direct power operation.

7.2 Bypass requirements for buck soft-start

Before bypassing, the soft-start device shall, through a direct or indirect manner, detect the amplitudes of motor speed and motor terminal voltage. When it is determined that the amplitudes of motor speed and motor terminal voltage meet the design requirements, the soft-start device shall give bypass instruction. The specific requirements are determined by the manufacturer and user according to the site conditions.

7.3 Bypass requirements for variable-frequency soft start

Before bypassing, the soft-start device shall, through a direct or indirect manner, detect the amplitudes, phases and frequencies of motor speed and motor terminal voltage. When it is determined that the amplitudes, phases and frequencies of motor speed and motor terminal voltage meet the design requirements, the soft-start device shall give bypass instruction. The specific requirements are determined by the manufacturer and user according to the […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 37404-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 37404-2019

$105.00