Valid

GB/T 36668.6-2019Condition monitoring and fault diagnostics of amusement device—Part 6:Operating parameters monitoring method (English PDF)

游乐设施状态监测与故障诊断 第6部分:运行参数监测方法

Preview PDF

This is a limited preview

Buy now to download the full PDF (21 pages)

Need quotation for your management?

Get a formal quotation for GB/T 36668.6-2019 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 31, 2019

Implementation date

December 31, 2019

Scope

GB/T 36668.6-2019 is the English-translated version of 游乐设施状态监测与故障诊断 第6部分:运行参数监测方法.

GB/T 36668.6-2019 is the sixth part of the Chinese series on condition monitoring and fault diagnosis of amusement rides, and it deals with monitoring the operating parameters of a ride in service.

It describes the method, the safety requirements to respect while monitoring, the competence required of the staff, which rides can be monitored and with what instruments, the monitoring procedure and the monitoring methods themselves, how the results are assessed and graded and how a fault is then traced.

Operators of amusement parks, inspection bodies and maintenance teams use it to judge a ride without dismantling it. It was issued on 31 December 2019.

Found what you need?

Document preview — GB/T 36668.6-2019

National Standard of the People's Republic of China

ICS
97.200.40
Classification
Y 57

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Method Overview
  • 5 Safety requirements
  • 6 Staff requirements
  • 7 Requirements for monitored rides
  • 8 Equipment and equipment requirements
  • 9 Monitoring process specifications
  • 10 Monitoring methods
  • 11 Evaluation and grading of monitoring results
  • 12 Troubleshooting
  • 13 Maintenance Strategy
  • 14 Records and reports
  • Appendix A (informative) Monitoring of operating parameters
  • Appendix B (Normative Appendix) Performance Requirements of Operating Parameter Monitoring System

Foreword

GB/T 36668 `` Recreation facility condition monitoring and fault diagnosis '' is divided into the following 6 parts.

--- Part 1. General;

--- Part 2. Acoustic emission monitoring method;

--- Part 3. Infrared thermal imaging monitoring method;

--- Part 4. vibration monitoring methods;

--- Part 5. Stress detection and monitoring methods;

--- Part 6. Monitoring method of operating parameters.

This part is Part 6 of GB/T 36668.

This section is drafted in accordance with the rules given in GB/T 1.1-2009.

3 Terms and definitions

JB/T 6862-2014, GB/T 19582, GB/T 35226, GB/T 35227, GB/T 50063, GA/T 1127, The terms and definitions defined in GB/T 36668.1 and the following apply to this document.

3.1 Operatingparametersmonitoring

Monitoring and collection of environmental parameters, audio and video, operating data and information on the work of amusement facilities.

3.2 Dataacquisitionequipment

Equipment for the collection of environmental parameters, audio and video, operating data and information of the amusement facilities.

3.3 Distribution monitoring sensor

Sensors that monitor the voltage, current, and frequency of amusement facilities.

Note: Contains voltmeters and ammeters for power measurement.

3.4 Audio and video capture equipment

Sensors for sound and image acquisition monitoring.

Note: Contains pickups and network cameras.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 21 pages — is available in the English PDF.

Similar standards

How to Download GB/T 36668.6-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
21 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 36668.6-2019

$295.00