Valid

GB/T 36558-2023General technical requirements for electrochemical energy storage system of power system (English PDF)

电力系统电化学储能系统通用技术条件

Open the GB/T 36558-2023 preview as PDF

Preview — first pages of GB/T 36558-2023 (full document: 15 pages)

This is a limited preview

Buy now to download the full PDF (15 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 28, 2023

Implementation date

July 1, 2024

Scope

GB/T 36558-2023 is the English-translated version of 电力系统电化学储能系统通用技术条件.

GB/T 36558-2023 is the Chinese national standard covering general technical requirements for electrochemical energy storage system of power system. Issued on 28 December 2023, it has been in force since 1 July 2024, replacing GB/T 36558-2018.

Document preview — GB/T 36558-2023

National Standard of the People's Republic of China

ICS
27.180
Classification
F 19
Replacing
GB/T 36558-2018

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword3
  • 1 Scope5
  • 2 Normative references5
  • 3 Terms and definitions7
  • 4 Environmental conditions7
  • 5 System technical requirements8
  • 6 Equipment technical requirements13

1 Scope

This document specifies the technical requirements for the working and storage environment conditions, power control, operational adaptability, energy conversion efficiency, fault ride-through, primary frequency modulation, inertia response, black start, power quality, etc. of the electrochemical energy storage system of electric power system, as well as the technical requirements for energy storage equipment such as lithium-ion battery, flow battery, lead-acid/lead-carbon battery, water electrolysis hydrogen generation/fuel cell, battery management system, power conversion system, monitoring and control system, protection, metering, and auxiliary system.

This document applies to the design, manufacture, testing, inspection, operation, maintenance and overhaul of electrochemical energy storage system of power system that uses lithium-ion batteries, flow batteries, lead-acid/lead-carbon batteries, sodium- ion batteries, and water electrolysis hydrogen generation/fuel cells as energy storage carriers.

2 Normative references

GB 2894

GB/T 12325

GB/T 12326

GB 14050

GB/T 14285

GB/T 14549

GB/T 15543

5 System technical requirements

5.1 General requirements

5.1.1 The electrochemical energy storage system mainly includes energy storage battery,

battery management system, power conversion system, monitoring and control system, relay protection and safety automatic devices, metering system and related auxiliary system and other equipment.

5.1.2 Under normal working conditions, the charge and discharge energy and power of

the electrochemical energy storage system shall not be lower than the rated charge and discharge energy and rated power; the system shall have one or more application functions of system peak regulation, frequency regulation, emergency power support, voltage control, tracking plan curve, smooth power output, voltage sag support, and backup power supply.

5.1.3 The voltage level of the electrochemical energy storage system connected to the

power grid shall be determined after economic comparison based on the system's rated installed capacity, application functions, and the grid structure of the access point.

5.1.4 The electrochemical energy storage system connected to the grid shall meet the

relevant requirements of GB 38755 and GB/T 31464.

5.1.5 The electrochemical energy storage system shall be able to receive and execute

remote or local power control instructions and shall have four-quadrant power control function.

5.1.6 The grid-related protection configuration and setting of the electrochemical

energy storage system shall be coordinated with the protection of the connected power grid.

5.1.7 The information security protection of the electrochemical energy storage system

connected to the dispatching automation system shall comply with the provisions of GB/T 36572.

5.1.8 The grounding method of the electrochemical energy storage system shall be

compatible with the grounding method of the connected power grid; lightning protection and grounding shall comply with the relevant provisions of GB 14050, GB 50057 and GB/T 50065.

5.1.9 The electrochemical energy storage system connected to the grid at a voltage level of 10 kV and above shall establish electromagnetic transient, electromechanical transient and medium- and long-term dynamic simulation models in accordance with the requirements of GB/T 42716.

5.2 Power control

5.2.1 Active power

5.2.1.1 When the electrochemical energy storage system responds to the local active

power control command, the charge/discharge response time shall not exceed 500 ms, the charge/discharge adjustment time shall not exceed 2 s, the charge-to-discharge conversion time and the discharge-to-charge conversion time shall not exceed 500 ms, and the active power control deviation shall not exceed ±1% of the rated power.

5.2.1.2 Electrochemical energy storage systems connected to the grid at a voltage level

of 10 kV and above shall have the ability to respond to automatic generation control (AGC) instructions, and the power regulation rate and regulation accuracy shall meet the relevant regulations of the power grid dispatching agency.

5.2.1.3 Electrochemical energy storage systems connected to the grid at a voltage level

of 10 kV or above shall have the capability of emergency power support and shall reach the maximum dischargeable or rechargeable power within 200 ms.

5.2.1.4 For electrochemical energy storage systems participating in the electricity

market, the control method, response capability and response performance shall meet the requirements of electricity market rules.

5.2.2 Reactive power

5.2.2.1 The electrochemical energy storage system shall have control modes for power

factor, reactive power and voltage control, and be capable of online switching of control modes.

5.2.2.2 The power factor of the electrochemical energy storage system shall be

continuously adjustable within the range of 0.9 (leading) ~ 0.9 (lagging).

5.2.2.3 Electrochemical energy storage systems connected to the grid at voltage levels

of 10 kV and above shall have the ability to respond to automatic voltage control (AVC) instructions and automatically adjust the reactive power of the electrochemical energy storage system. The adjustment rate and control accuracy shall meet the relevant regulations of the grid dispatching agency.

6.1.4 The operating environment conditions such as temperature and relative humidity

of each compartment of the electrochemical energy storage system shall meet the technical requirements of the equipment and facilities.

6.1.5 The selection and laying of AC and DC cables for connecting electrochemical

energy storage systems shall meet the requirements of GB 50217.

6.1.6 Prohibition, warning, instruction, reminder and other markings shall be placed in

obvious locations on electrochemical energy storage equipment and facilities. The marking style shall comply with the relevant provisions of GB 2894.

6.2 Lithium-ion battery

The technical requirements for lithium-ion batteries under the specified test methods, such as appearance, size and quality, electrical properties, environmental adaptability, durability, safety performance, as well as coding, normal working environment, inspection rules, marking, packaging, transportation and storage, shall meet the relevant requirements of GB/T 36276.

6.3 Flow battery

The appearance, rated watt-hour capacity, rated power, rated energy efficiency, capacity retention capability, low-temperature storage performance, high-temperature storage performance, over-charge protection, over-discharge protection, charge characteristic curve, discharge characteristic curve, flame retardant performance, hydrogen concentration, insulation resistance, etc. of the all-vanadium liquid flow battery system under the specified test methods shall meet the relevant requirements of GB/T 32509.

6.4 Lead-carbon battery

The technical requirements for lead-carbon batteries under the specified test methods, such as appearance, size and quality, electrical properties, environmental adaptability, cycle performance, safety performance, as well as coding, normal working environment, inspection rules, marking, packaging, transportation and storage, shall meet the relevant requirements of GB/T 36280.

6.5 Water electrolysis hydrogen production/fuel cell

The hydrogen production system shall comply with the provisions of GB 50177; the safety, performance test methods and installation of the fuel cell system shall meet the relevant requirements of GB/T 29729, GB/T 27748.1, GB/T 27748.2, GB/T 27748.3 and GB/T 27748.4.

6.6 Battery management system

The technical requirements of the battery management system under the specified test methods, such as data acquisition, communication, alarm and protection, control, energy state estimation, balance, insulation resistance detection, insulation withstand voltage, electrical adaptability, electromagnetic compatibility, as well as classification and coding, normal working environment, inspection rules, marking, packaging, transportation and storage, shall meet the relevant requirements of GB/T 34131.

6.7 Power conversion system

The power conversion system shall comply with the test methods specified in GB/T 34133. Functional requirements such as start-stop, power control, grid-connection and off-grid switching, alarm and protection, insulation resistance detection, communication, operation information monitoring, statistics, data display and storage, performance requirements such as electrical performance and safety performance, as well as classification and coding, normal working conditions, appearance and protection grade, electromagnetic compatibility, auxiliary systems, inspection rules, marking, packaging, transportation and storage shall meet the relevant requirements of GB/T 34120.

6.8 Monitoring and control system

The technical requirements of the monitoring and control system under the prescribed test methods, such as data acquisition, data processing, control and regulation, alarm, event sequence recording and accident recall, communication, data storage, human- machine interface, system timing, system load rate, as well as normal working conditions, system architecture, marking, packaging, transportation and storage, shall meet the relevant requirements of GB/T 42726.

6.9 Protection

6.9.1 The functions of relay protection and safety automatic devices shall meet the

requirements of reliability, selectivity, sensitivity and speed.

6.9.2 The functions of relay protection and safety automatic devices shall comply with

the relevant provisions of GB/T 14285.

6.9.3 The battery management system shall have protections such as voltage over-limit,

current over-limit, and temperature over-limit.

6.9.4 The power conversion system shall have protections such as reverse polarity,

incorrect AC line phase sequence, abnormal DC voltage, overcurrent, overtemperature, communication failure and cooling system failure.

6.9.5 Electrochemical energy storage systems connected to a voltage level of 35 kV and above shall be equipped with a fault recording device. The analog and switch quantities connected to the fault recording device shall meet the requirements of the power grid dispatching agency and have sufficient recording channels to record the situation from 10 s before the fault to 60 s after the fault. The recording information shall be transmitted remotely to the power grid dispatching agency. ......

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Editions of GB/T 36558

EditionTitleRevisionStatus
GB/T 36558-2023General technical requirements for electrochemical energy storage system of power systemcurrent editionCurrent
GB/T 36558-2018General technical requirements for electrochemical energy storage system in power systemprevious editionObsolete

This page sells the current edition, GB/T 36558-2023. Earlier editions are listed for reference only.

How to Buy GB/T 36558-2023

  1. 1Add to cart. Click the "Buy GB/T 36558-2023" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 36558-2023

$260.00

$220.00for partners