GB/T 43462-2023Technical guide for black-start of electrochemical energy storage (English PDF)

电化学储能黑启动技术导则

Open the GB/T 43462-2023 preview as PDF

Preview — first pages of GB/T 43462-2023 (full document: 17 pages)

This is a limited preview

Buy now to download the full PDF (17 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 28, 2023

Implementation date

July 1, 2024

Scope

GB/T 43462-2023 is the English-translated version of 电化学储能黑启动技术导则.

GB/T 43462-2023 covers the use of an electrochemical storage station as the seed of a system restoration after a blackout. The overall requirements separate the two duties such a station can take on, distinguished by its grid connection point, the object it starts and the path it follows: starting generating plant, or restoring the supply to a transformer substation. Technical conditions come next, setting out what the station, its converters and its stored energy have to satisfy before it can be counted on for the duty at all, and then the sequence itself: black-start preparation, the self-starting of the storage station, the starting of the generation equipment it is to energise, including a set fed through the station service transformer, and the restoration of a substation's black-start supply. Informative annexes give typical black-start modes and the contents a black-start scheme should carry. A grid with no voltage cannot be restarted by plant that needs a supply to start, and the conventional answer, a diesel or hydro unit, is not available everywhere; a storage station already on site can do the work, but only if its readiness has been defined in advance instead of discovered on the night. For dispatch centres, storage station operators and the engineers who write restoration plans.

Document preview — GB/T 43462-2023

National Standard of the People's Republic of China

ICS
27.180
Classification
F 19

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword3
  • 1 Scope4
  • 2 Normative References4
  • 3 Terms and Definitions4
  • 4 Overall Requirements5
  • 5 Technical Conditions for Black-start6
  • 6 Black-start Preparation9
  • 7 Self-starting10
  • 8 Starting of Power Generation Equipment10
  • 9 Restoration of Transformer Substation Black-start Power Supply12
  • Appendix A (informative) Typical Black-start Mode14
  • Appendix B (informative) Content of Black-start Scheme17

Foreword

This document was issued on 28 December 2023 by the State Administration for Market Regulation; Standardization Administration of the PRC and takes effect on 1 July 2024.

It is a GB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.

1 Scope

GB/T 43462-2023 covers the use of an electrochemical storage station as the seed of a system restoration after a blackout. The overall requirements separate the two duties such a station can take on, distinguished by its grid connection point, the object it starts and the path it follows: starting generating plant, or restoring the supply to a transformer substation. Technical conditions come next, setting out what the station, its converters and its stored energy have to satisfy before it can be counted on for the duty at all, and then the sequence itself: black-start preparation, the self-starting of the storage station, the starting of the generation equipment it is to energise, including a set fed through the station service transformer, and the restoration of a substation's black-start supply. Informative annexes give typical black-start modes and the contents a black-start scheme should carry. A grid with no voltage cannot be restarted by plant that needs a supply to start, and the conventional answer, a diesel or hydro unit, is not available everywhere; a storage station already on site can do the work, but only if its readiness has been defined in advance instead of discovered on the night. For dispatch centres, storage station operators and the engineers who write restoration plans.

This document specifies the overall requirements and technical conditions for the black-start of

electrochemical energy storage, as well as the technical requirements for the black-start, such

as: black-start preparation, self-starting, starting power generation equipment and restoring

transformer substation black-start power supply, etc.

This document applies to the planning, design, test and operation of electrochemical energy

storage systems or power stations with black-start capability and that can serve as black-start

power sources.

2 Normative References

The contents of the following documents constitute indispensable clauses of this document

through the normative references in the text. In terms of references with a specified date, only

versions with a specified date are applicable to this document. In terms of references without a

specified date, the latest version (including all the modifications) is applicable to this document.

GB/T 36558 General Technical Requirements for Electrochemical Energy Storage System of

Power System

GB/T 38334 Technical Specification for Black-start of Hydropower Station

GB/T 50064 Code for Design of Overvoltage Protection and Insulation Coordination for AC

Electrical Installations

GB 51048 Design Code for Electrochemical Energy Storage Station

DL/T 2528 Basic Terminology of Electrical Energy Storage

3 Terms and Definitions

The terms and definitions defined in DL/T 2528 and the following are applicable to this

document.

3.1 black-start of electrochemical energy storage

After a large-scale power outage in the power system, in the absence of external power support,

the process, in which, the electrochemical energy storage system or power station with black-

start capability in the system is used to start the connected power generation equipment or

restore power supply to the transformer substation equipment.

3.2 black-start time

The time from when the power generation equipment or transformer substation loses the

working power supply for station service and backup power supply to when the power

generation equipment or transformer substation is capable of restoring power supply to the grid

connection point.

4 Overall Requirements

4.1 In accordance with the grid connection point, start object and path of the electrochemical

energy storage system or power station, the electrochemical energy storage black-start can be

divided into two types: starting the power generation equipment and restoring the transformer

substation black-start power supply. The typical black-start mode is shown in Appendix A.

4.2 The planning and layout of the black-start electrochemical energy storage system or power

station shall be coordinated with the black-start power supply layout and path planning for its

access to the power grid.

4.3 The design of electrochemical energy storage stations shall meet the requirements of GB

51048 and GB/T 36558. During the black-start process, the power configuration required for

the black-start of the electrochemical energy storage station shall satisfy the sum of demands

for normal load and impact load, and the energy configuration shall meet the sum of electricity

demands in each stage.

4.4 The black-start time of an electrochemical energy storage station should not be greater than

2 hours.

4.5 When an electrochemical energy storage station is used as a black-start power source, the

discharge energy required for the black-start shall be reserved during normal operation.

4.6 Electrochemical energy storage stations that have passed the black-start test and are capable

of providing black-start services shall sign a black-start agreement with the grid dispatching

institution.

4.7 The grid dispatching institution shall calculate the black-start range and recovery path of

the electrochemical energy storage station and formulate a power grid black-start plan.

4.8 A black-start scheme shall be formulated for a black-start energy storage station. The

content of the scheme is shown in Appendix B. In addition, black-start capability tests shall be

regularly conducted. Equipment related to black-start shall be re-tested after overhaul or

technical transformation.

4.9 Black-start energy storage stations shall organize black-start emergency plan drills every

year to familiarize themselves with various operations, shorten the black-start time, and revise

less than the continuous electricity consumption of 15 minutes for station service.

5.1.5 The energy storage converter control system of the energy storage unit used for self-

starting and the battery management system should have the capability of self-drawing power

on the DC side.

5.1.6 The uninterruptible power supply capacity of the electrochemical energy storage stations

shall meet the demands of important loads, such as: the self-starting energy storage converter

control system and battery management system, energy storage station computer monitoring

system, emergency lighting, fire protection system, etc., and the continuous power supply time

should not be less than 2 h.

5.1.7 The electrochemical energy storage stations should be equipped with an independent

busbar for station service. The incoming switch for station service should be equipped with the

series switching function for power failure and parallel switching function for power restoration.

At least two independent power supply routes should be configured from the power supply for

station service to the self-starting energy storage unit.

5.1.8 The capacity of the energy storage unit used for zero-start voltage boosting shall not be

less than the sum of the no-load loss and cable loss of the boosting transformer, station

transformer, and transformer in the zero-start voltage boosting starting electrical path of the

energy storage station.

5.2 Starting of Synchronous Generator Set

5.2.1 The power configuration for the starting of the generator set of the electrochemical energy

storage station shall meet the following requirements:

a) The rated power of the energy storage station is not less than the maximum load power

for station service required at each stage of the black-start of the generator set;

b) The overload capacity of the energy storage station meets the total power when the

maximum impact load for station service starts up;

c) When starting a single motor with the maximum power in the station, the isolated grid

bus voltage is not lower than 80% of the rated voltage, and the transient process is not

lower than 70% of the rated voltage. For motors with special starting voltage

requirements, the requirements of the equipment manufacturer are satisfied;

d) When starting a single motor with the maximum power in the station, the frequency

fluctuation of the isolated grid bus does not exceed 1 Hz.

5.2.2 The capacity configuration of the electrochemical energy storage station shall satisfy the

electricity demand for completing the entire black-start process of the generator set.

5.2.3 The control and protection systems of the generator set for the starting of the

electrochemical energy storage station, as well as the station lighting, shall satisfy the

requirements of GB/T 38334.

5.2.4 The synchronization point between the electrochemical energy storage station and the

generator set should be the original synchronization grid connection point of the generator set.

5.3 Starting of Wind Turbine or Photovoltaic Power Generation Unit

5.3.1 The power configuration for the black-start of the wind turbine or photovoltaic power

generation unit of the electrochemical energy storage station shall meet the following

requirements:

a) The rated discharge power of the energy storage station is not less than the electrical

load for station service of the wind power station or photovoltaic power station;

b) The rated reactive power of the energy storage station is not less than the sum of the

charge reactive power of all lines on the electrical path from the started wind turbine

or photovoltaic power generation unit to the energy storage system;

c) The overload capacity of the energy storage station meets the impact current of the

started wind turbine or photovoltaic power generation unit;

d) When starting a single wind turbine or photovoltaic power generation unit, the

frequency and voltage of the isolated grid do not exceed the frequency and voltage

operating ranges of the wind turbine or photovoltaic power generation unit.

5.3.2 The capacity configuration of electrochemical energy storage stations shall meet the

power supply range and time requirements for the stable operation of isolated grid loads, and

should take into account the volatility and uncertainty of wind and solar resources.

5.3.3 Electrochemical energy storage stations, wind power stations and photovoltaic power

stations should be equipped with a wind and solar storage joint monitoring system. In

accordance with the wind power and photovoltaic forecasts, and actual power and the available

energy for storage, the control targets of the wind and solar storage sub-systems shall be

reasonably allocated to maintain the frequency and voltage of the isolated grid within a

reasonable range.

5.3.4 During the zero-start voltage boosting process, the control strategies of the dynamic

reactive power compensation device of the electrochemical energy storage station and the wind

power station or photovoltaic power station shall be coordinated to avoid abnormal voltage

fluctuations or oscillations.

5.3.5 The short-circuit impedance from the electrochemical energy storage station to the started

wind turbine or photovoltaic power generation unit shall satisfy the short-circuit impedance

requirements for the operation of the wind turbine or photovoltaic power generation unit.

5.3.6 The wind power station or photovoltaic power station should analyze and evaluate the

oscillation risk of the electrochemical energy storage station and the wind power station or

Remaining clauses in the full document

  • 5 Technical Conditions for Black-start
  • 6 Black-start Preparation
  • 7 Self-starting
  • 8 Starting of Power Generation Equipment
  • 9 Restoration of Transformer Substation Black-start Power Supply

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.

Referenced standards

Similar standards

GB 38031-2025|GB/T 36558|GB/T 38334|GB/T 50064|GB 51048|GB 51048|GB/T 36558.|GB/T 38334.

How to Buy GB/T 43462-2023

  1. 1Add to cart. Click the "Buy GB/T 43462-2023" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
17 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 43462-2023

$260.00

$220.00for partners