Scope
GB/T 36270-2018 is the English-translated version of 微电网监控系统技术规范.
GB/T 36270-2018 sets the technical requirements for the monitoring and control systems that run microgrids at voltage levels of 35 kV and below.
It covers the working environment and conditions, from dual or single power supply, UPS back-up and computer room fire, water and lightning protection to humidity and temperature limits, together with the system structure and configuration.
The system functions range from data acquisition, alarms and storage to database management, the human-computer interface, control operations, user authority management and switching between grid-connected and island operation.
Performance indexes fix measurement errors, response times, CPU and network load rates and point capacity. It is used when microgrids are built, rebuilt or expanded, was issued on 7 June 2018 and has applied since 1 January 2019.
Found what you need?
Document preview — GB/T 36270-2018
National Standard of the People's Republic of China
- ICS
- 27.180
- Classification
- F 19
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword3
- 1 Scope4
- 2 Normative References4
- 3 Terms and Definitions5
- 4 General Principles5
- 5 Working Environment and Conditions6
- 6 System Structure and Configuration7
- 7 System Functions8
- 8 Performance Indexes13
- Appendix A (informative appendix)16
1 Scope
This Standard specifies the technical requirements of monitoring and control system of microgrids, such as working environment, structure, configuration, system functions and performance indexes, etc.
This Standard is applicable to the construction, reconstruction and expansion of microgrids (voltage level. 35 kV and below).
2 Normative References
The following documents are indispensable to the application of this Standard. In terms of references with a specified date, only versions with a specified date are applicable to this Standard. The latest version (including all the modifications) of references without a specified date is also applicable to this Standard.
GB/T 2887 General Specification for Computer Field
GB/T 20270 Information Security Technology - Basis Security Techniques Requirements for Network
GB 50174 Code for Design of Data Centers
DL/T 634.5101 Tele-control Equipment and Systems - Part 5-101. Transmission Protocols - Section 101. Companion Standard for Basic Tele-control Tasks
DL/T 634.5103 Tele-control Equipment and Systems - Part 5-103. Transmission Protocols - Section 103. Relay Protection Equipment Information Interface Supporting Standard
DL/T 634.5104 Tele-control Equipment and Systems - Part 5-104. Transmission Protocols - Network Access for IEC 60870-5-101 Using Standard Transport Profiles
DL/T 860 (all the content) Communication Networks and Systems in Substations
DL/T 5136 Technical Code for Designing of Electrical Secondary Wiring in Fossil Fuel Power Plants and Substations
4 General Principles
4.3 Microgrid monitoring and control system shall comply with stipulations of safety protection of power monitoring and control system.
4.4 Microgrid monitoring and control system shall adopt an open system and structure and be equipped with standard interfaces and satisfying expandability.
5 Working Environment and Conditions
5.1 Power Supply
5.1.1 Energy management system for microgrids (voltage level. 10 kV and above) shall adopt dual power-supply; energy management system for microgrids (voltage level. 380 V) shall adopt single power-supply.
5.1.2 Microgrid monitoring and control system shall be equipped with uninterrupted power supply (UPS) that can maintain normal system operation for >= 2 h.
5.2 Computer Room
5.2.1 Microgrid monitoring and control system shall be installed through group screens and deployed in the control room and computer room in accordance with its functional division.
5.2.2 The structure of various screens and the layout of screens under microgrid monitoring and control system shall comply with stipulations in DL/T 5136.
5.2.3 The computer room shall be equipped with waterproofing, fireproofing and accident lighting facilities; its setting shall comply with stipulations in GB/T 2887.
5.2.4 Isolation and lightning protection measures adopted in the computer room shall comply with stipulations in GB/T 2887.
5.2.5 Grounding design of the computer room shall comply with stipulations in GB 50174.
5.3 Field and Environment
5.3.1 Maximum relative humidity
a) Daily average value. 95%.
b) Monthly average value. 90%.
5.3.2 Working environment and temperature
a) Outdoor. -25 °C ~ 55 °C.
b) Indoor. -5 °C ~ 45 °C.
7 System Functions
7.1.3 Microgrid monitoring and control system shall be equipped with the function of reasonably examining the acquired data and information, and initiating over-limit alarm, which includes, but is not limited to.
a) Examination of data integrity. automatically filter bad data and set up data quality labels;
b) Set up limits. support the adoption of different limits in different time slots;
c) Alarm. the definition, action, diversion and information storage of alarm, and frame invoking, etc.
7.1.4 Microgrid monitoring and control system shall be equipped with the function of storing the acquired data and information, which includes, but is not limited to.
a) Storage and management of raw data and application data by classification;
b) Storage of the sequence and operation record.
7.7.2 There shall be two modes of control. automatic control and manual control. The level of control operation shall be on-the-spot monitoring and control, internal monitoring and control, and remote control from top to the bottom.
7.7.3 In terms of manual control of equipment breaking, microgrid monitoring and control system shall be equipped with the function of operation, monitoring and guarding. Guardians can implement monitoring and guarding in the local computer or other operators' stations.
7.7.4 In microgrid monitoring and control system, three steps shall be adopted in the breaking equipment. selection, proofreading and execution. The implementation shall be operated step by step.
7.2 Database Management
7.2.1 Microgrid monitoring and control system shall be equipped with the function of database maintenance, synchronization, back-up and recovery, etc.
7.2.2 Microgrid monitoring and control system shall provide unified real-time or quasi-real-time data interfaces to external sources; implement access control in accordance with the limit of authority and classification.
7.3 Human-computer Interface
7.3.1 Microgrid monitoring and control system can include, but shall not be limited to.
a) Real-time monitoring frame shall support system main wiring diagram, network diagram, geographical diagram, operating-condition diagram and communication network diagram, etc. The mode of diagram demonstration includes tendency chart, histogram and pie chart, etc.
b) It shall support multi-screen display, graphical multi-window, step-less zoom, roaming, hauling and hierarchical display, etc.
7.3.2 Microgrid monitoring and control system shall be equipped with graphical modeling tool that can facilitate graphic library integration; network topology management tool. It shall also support customized equipment primitive and interval
7.8 Authority Management
7.8.1 In users' authority management under microgrid monitoring and control system, personnel shall be provided with different authorities and validity periods in accordance with different job duties and natures, including hierarchical authority management, authority binding and configuration.
7.8.2 In microgrid monitoring and control system, hierarchical management shall be implemented in users' authority. Password setting and authority allocation can be executed; password limitation can be executed in accordance with the content of business.
7.8.3 All the operators logging in microgrid monitoring and control system shall be authorized; identity and authority authentication shall be executed. Stipulated system functions and scope of operation shall be adopted in accordance with the limit of authority.
7.9 Microgrid Operating Mode Control
7.9.1 Microgrid monitoring and control system shall be equipped with the function of microgrid-connect/grid-disconnected switching; the function of issuing mode switching instructions to certain devices, such as distributed power and grid-connected interface device, etc.
7.9.2 In normal grid-connect/grid-disconnected switching, microgrid monitoring and control system shall provide two optional modes. power-off switching and smooth switching.
7.9.3 In case of malfunction of the microgrid, microgrid monitoring and control system shall automatically switch from grid-connected operating control mode to grid-disconnected mode.
7.9.4 When microgrid switches from grid-disconnected operation to grid-connected operation after the malfunction recovers, microgrid monitoring and control system shall
8 Performance Indexes
a) Relative error of current and voltage measurement. <= 0.2%.
b) Relative error of active and reactive measurement. <= 0.5%.
c) Error of grid frequency measurement. <= 0.01 Hz.
8.3 System Timeliness
The requirements of system timeliness include.
a) The delay time from telemetry dead zone to the display in operating workstation is. <= 2 s.
b) The delay time from remote signal displacement to the display in operating station is. <= 2 s.
c) The duration of controlling and adjusting command transmission (from pushing the execution button to output). <= 1 s.
d) Response time of whole-frame dispatching.
1) Real-time frame. <= 2 s.
2) Other frames. <= 3 s.
e) Real-time data refresh cycle. <= 3 s.
f) Sequence of event (SOE). <= 2 ms.
8.4 System Resources
8.4.1 The requirements of CPU average load rate of various workstations include.
a) Under normal condition (within any 30 min). <= 30%.
b) During microgrid failures (within 10 s). <= 70%.
8.4.2 The requirements of network load rate include.
a) Under normal condition (within any 30 min). <= 20%.
b) During microgrid failures (within 10 s). <= 40%.
8.4.3 The requirements of capacity include.
a) Analog quantity. >= 8,000 points.
b) Status quantity. >= 10,000 points.
c) Remote control. >= 500 points. […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 16 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 2887General specification for computer field
- GB/T 20270Information security technology Basis security techniques requirement for network
- GB 50174Code for design of data centers
- DL/T 634.5101Telecontrol equipment and systems - Part 5-101: Supporting standards for transmission protocol basic telecontrol tasks
- DL/T 634.5104Telecontrol equipment and systems. part 5-104: Transmission protocols-Network access for IEC 60870-5-101 using standard transport profiles
DL/T 634.5103 · DL/T 860 · DL/T 5136
Cited by
- GB/Z 120.305-2026Microgrids - Part 3-5: Testing for microgrid monitoring, control, and energy management systems
- GB/T 42731-2023Technical requirements for the microgrid
- GB/T 43333-2023Specification for commissioning and acceptance of stand-alone microgrid
- GB/T 43463-2023Requirements for operation and control of microgrid cluster
- GB/T 41235-2022Specification for interaction between internet of energy and energy storage system
Similar standards
How to Download GB/T 36270-2018
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 634.5101-2022 — Telecontrol equipment and systems - Part 5-101: Supporting standards for transmission protocol basic telecontrol tasks
DL/T 634.5104-2009 — Telecontrol equipment and systems. part 5-104: Transmission protocols-Network access for IEC 60870-5-101 using standard transport profiles
DL/T 860.10-2018 — Communication networks and systems for power utility automation -Part 10: Conformance testing
Secure payment via Stripe