GB/T 29723.3-2013Grade and limit of major process energy consumption for coal mine - Part 3: Air compressor system (English PDF)
煤矿主要工序能耗等级和限值 第3部分:空气压缩系统
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 29723.3-2013 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
September 18, 2013
Implementation date
January 1, 2014
Scope
GB/T 29723.3-2013 is the English-translated version of 煤矿主要工序能耗等级和限值 第3部分:空气压缩系统.
GB/T 29723.3-2013 is the Chinese standard "Grade and limit of major process energy consumption for coal mine - Part 3: Air compressor system".
Its scope clause reads: This section GB/T 29723 specifies the basic requirements for coal mine air compression system processes, calculation of energy consumption indicators, energy consumption Index classification and limits.
This section applies to coal mine with rated discharge pressure does not exceed 1.25MPa (gauge pressure), the nominal volume flow rate of not less than 6m3/min of Air compressor unit and air distribution systems.
Its clauses include terms and definitions; basic requirements; process energy consumption index calculation method.
Found what you need?
Document preview — GB/T 29723.3-2013
National Standard of the People's Republic of China
- ICS
- 27.010
- Classification
- D 98
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Basic requirements
- 5 process energy consumption index calculation method
1 Scope
This section GB/T 29723 specifies the basic requirements for coal mine air compression system processes, calculation of energy consumption indicators, energy consumption
Index classification and limits.
This section applies to coal mine with rated discharge pressure does not exceed 1.25MPa (gauge pressure), the nominal volume flow rate of not less than 6m3/min of
Air compressor unit and air distribution systems.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB 17167 energy use per unit of energy measuring instruments and General Manager
GB 3853 positive displacement compressor acceptance tests
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Compressed air system, process energy
Refers to the air compression system statistics during each compression 1m3 nominal displacement, pressure increases power consumption 1.0MPa.
NOTE. The compressed air system to process energy statistics based on the statistical period should be one year.
4 Basic requirements
4.1
equipped with air compressors and motors should not be out of product.
4.2
air compressor motor, exhaust pipe should be a reasonable match, operating normally; air compressor and the exhaust pipe should be no leakage.
4.3
compressed air system with energy measuring instruments installed shall request the Executive GB 17167, and according to relevant regulations for examination or calibration.
4.4
compressed air system controls and instrumentation should be intact, and the relevant provisions of the instrument should be verification or calibration.
4.5
compressed air system operation shall be complete and accurate; technology files complete.
5 process energy consumption index calculation method
5.1 boundary energy
To control the air compressor motor starting, stopping and running switchgear as the starting point of energy metering systems, compressor discharge air
Air intakes to the end.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download GB/T 29723.3-2013
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 29723.1-2013 — Grade and limit of major process energy consumption for coal mine - Part 1: Primary fan system
GB/T 29723.2-2013 — Grade and limit of major process energy consumption for coal mine - Part 2: Main drainage system
GB/T 29723.4-2013 — Grade and limit of major process energy consumption for coal mine - Part 4: Main elevating belt conveyor system
Secure payment via Stripe
Payments accepted
GB/T 29723.3-2013
$85.00