Scope
GB/T 29723.2-2013 is the English-translated version of 煤矿主要工序能耗等级和限值 第2部分:主排水系统.
GB/T 29723.2-2013 is the Chinese standard "Grade and limit of major process energy consumption for coal mine - Part 2: Main drainage system".
Its scope clause reads: This section GB/T 29723 specifies the basic requirements for coal mine main drainage system processes, calculation of energy consumption indicators, energy consumption means Target classification and limits.
This section applies to coal in step with the main drainage system. Its clauses include terms and definitions; basic requirements; process energy consumption index calculation method.
Found what you need?
Document preview — GB/T 29723.2-2013
National Standard of the People's Republic of China
- ICS
- 27.010
- Classification
- D 98
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Basic requirements
- 5 process energy consumption index calculation method
1 Scope
This section GB/T 29723 specifies the basic requirements for coal mine main drainage system processes, calculation of energy consumption indicators, energy consumption means
Target classification and limits.
This section applies to coal in step with the main drainage system.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB 17167 energy use per unit of energy measuring instruments and General Manager
MT/T 1002 coal mine in the energy monitoring methods and decision rules with the main drainage system
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 The main drainage system process energy
Refers to the main drainage system during the reference period will be needed to enhance 1t mine water consumed 100m power.
NOTE. The main drainage system to process energy statistics based on the statistical period should be one year.
4 Basic requirements
4.1
Main Drainage Pump equipped with an electric motor and should not be out of product.
4.2
the main drainage pumps and motors, drain line should be a reasonable match, operating normally; the main drainage pumps and drainage pipe should be no leakage.
4.3
Main drainage system shall be equipped with energy measuring instruments installed to perform the requirements of GB 17167, and according to relevant provisions of the verification or calibration.
4.4
Main Drainage System controls and instrumentation should be intact, and the relevant provisions of the instrument should be verification or calibration.
4.5
main drainage system operation shall be complete and accurate; technology files complete. Years of running the drain line should clean up line records.
5 process energy consumption index calculation method
5.1 boundary energy
To control the main drainage pump motor starting, stopping and running switchgear as energy metering systems starting point to the exit of the drain line
Main drainage system terminals. The main drainage system includes an electric motor, transmission, main drain pump, inlet, drains and piping accessories.
5.2 Parameters and scope
5.2.1 Power Consumption
It refers to the main drainage system power consumption statistics during the period, including the main drain pump motor and the motor to the line loss between the switchgear power. use […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download GB/T 29723.2-2013
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 29723.1-2013 — Grade and limit of major process energy consumption for coal mine - Part 1: Primary fan system
GB/T 29723.3-2013 — Grade and limit of major process energy consumption for coal mine - Part 3: Air compressor system
GB/T 29723.4-2013 — Grade and limit of major process energy consumption for coal mine - Part 4: Main elevating belt conveyor system
Secure payment via Stripe
Payments accepted
GB/T 29723.2-2013
$105.00