Valid

GB/T 29549.1-2023Specification for offshore modular drilling rigs on fixed platforms—Part 1: Design (English PDF)

海上石油固定平台模块钻机 第1部分:设计

Preview PDF

This is a limited preview

Buy now to download the full PDF (25 pages)

Need quotation for your management?

Get a formal quotation for GB/T 29549.1-2023 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

November 27, 2023

Implementation date

June 1, 2024

Scope

GB/T 29549.1-2023 is the English-translated version of 海上石油固定平台模块钻机 第1部分:设计.

GB/T 29549.1-2023 is Part 1 of the Chinese specification for the modular drilling rigs installed on offshore oil fixed platforms, and it deals with their design.

It sets the basic requirements and parameters, the division of the rig into modules and their arrangement, and the design of each module: the drilling equipment system module, the drilling support system module, the bulk tank module and the cementing, logging and directional well modules, plus the structural design and the auxiliary systems.

A further clause fixes the interfaces with the platform, from the general and structural layout to the safety, public system, electrical, instrument communication and well control interfaces.

It replaces GB/T 29549.1-2013, was issued on 27 November 2023 and has applied since 1 June 2024.

Found what you need?

Document preview — GB/T 29549.1-2023

National Standard of the People's Republic of China

ICS
75.180.10
Classification
E 92
Replacing
GB/T 29549.1-2013

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Abbreviations
  • 5 Basic requirements and parameters
  • 5.1 Basic requirements
  • 5.2 Basic parameters
  • 6 Module division and arrangement
  • 6.1 Module division
  • 6.2 Module layout
  • 7 Module Design
  • 7.1 General
  • 7.2 Drilling Equipment System Module (DES)
  • 7.3 Drilling Support System Module (DSM)
  • 7.4 Bulk tank module (P-Tank)
  • 7.5 Cementing module, logging module, logging module, directional well module
  • 7.6 Structural design
  • 7.7 Auxiliary systems
  • 8 Platform interface
  • 8.1 General layout
  • 8.2 Security interface
  • 8.3 Public system interface
  • 8.4 Electrical interface
  • 8.5 Instrument communication interface
  • 8.6 Well Control System
  • 8.7 Structural interface
  • Appendix A (informative) Typical layout diagram of modular drilling rig
  • Reference

Foreword

This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.

This document is Part 1 of GB/T 29549 "Modular Drilling Rig for Fixed Offshore Oil Platforms". GB/T 29549 has released the following part.

---Part 1. Design;

---Part 2. Construction;

---Part 3. Offshore installation, commissioning and acceptance.

This document replaces GB/T 29549.1-2013 "Offshore oil fixed platform module drilling rig Part 1: Design" and is consistent with GB/T 29549.1- Compared with 2013, in addition to structural adjustments and editorial changes, the main technical changes are as follows:

a) The winch rated power in Table 1 has been changed (see 5.2, 4.2 of the 2013 edition);

b) Changed the description of module layout (see 6.2, 5.2 of the 2013 version);

c) Changed the list of typical materials submitted by each major (see 7.1.14, 6.1.11 of the 2013 version);

d) Changed the letter code description of formula (4) and changed Figure 1 (see 7.2.2, 6.2.2 of the 2013 version);

e) Changed some errors in formula (6) (see 7.3.2.1.1, 6.3.2.1.1 of the 2013 version);

f) Changed the calculation method of drilling fluid tank volume (see 7.3.2.2, 6.3.2.2 of the 2013 edition);

g) Changed the load rate of drilling rig equipment under various working conditions in Table 4 (see 7.3.2.3, 6.3.2.3 of the 2013 edition);

h) The specific layout requirements of P-Tank have been changed (see 7.4.1, 6.4.1.1 of the 2013 version);

i) Added technical requirements for flatbed truck shipping (see 7.6.5.3.2);

j) The maximum stress ratio of important components has been changed (see 7.6.7.1, 6.6.8.1 of the 2013 version).

Introduction

GB/T 29549 aims to determine the generally applicable basis for the design, construction, offshore installation, commissioning and acceptance of offshore fixed platform module drilling rigs. this requirement. It is planned to consist of three parts.

---Part 1. Design. The purpose is to establish the basic requirements and parameters of modular drilling rig design, module division and layout, and module design.

As well as the requirements for the interface between the module drilling rig and the platform where it is located.

---Part 2. Construction. The purpose is to establish the requirements for modular drilling rig structure, pipelines, outfitting manufacturing and equipment installation and commissioning.

---Part 3. Offshore installation, commissioning and acceptance. The purpose is to establish the system for offshore hoisting of modular drilling rigs and installation of offshore equipment. Requirements for connection, system commissioning and acceptance.

GB/T 29549.1 was first released in 2013. This revision mainly combines the actual application of this document in recent years and changes some clauses.

Modifications and improvements have been made, and the following principles have been adhered to during the revision process.

a) In accordance with the existing laws and regulations of the country, combined with the current status of relevant international and domestic national standards and enterprise standards, ensure the safety and safety of drilling rig operations. Efficient and environmentally friendly.

b) The preparation focuses on the current status of domestic modular drilling rigs to ensure that the modular drilling rigs designed in accordance with this document operate safely, efficiently and reliably.

It is reliable and can also be adapted to the overall processing and construction level of the domestic offshore oil industry.

c) This document combines my country's years of experience in offshore oil fixed platform module drilling rig design, and is based on a methodological standard to strictly Specification requirements, and highlights the characteristics of modular drilling rigs on offshore oil fixed platforms that are easy to transport, install and use. This time repair The order mainly combines the specific construction experience in recent years such as flatbed truck loading and drilling fluid tank volume requirements, and supplements the original practice and perfection.

1 Scope

This document specifies the basic requirements and parameters, module divisions and Layout, module design and platform interface requirements.

This document applies to the design of modular drilling rigs.

2 Normative reference documents

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document.

GB/T 3836.1 Explosive atmosphere Part 1: General requirements for equipment

GB 4914 Pollutant emission concentration limits for offshore oil exploration and development

GB/T 8423.5 Oil and gas industry terminology Part 5: Equipment and materials

GB 18420.1 Biological toxicity of pollutants in offshore oil exploration and development Part 1: Classification

GB/T 25428 Oil and gas industrial drilling and production equipment drilling and workover derricks and bases

GB/T 31049 Top drive drilling device for oil and gas drilling equipment

GB 50370 Design specifications for gas fire extinguishing systems

SY/T 6671 Recommended practices for classification of Class I electrical equipment sites in petroleum facilities, Zone 0, Zone 1 and Zone 2

SY/T 6962 Configuration and installation requirements for well control system of offshore drilling equipment

SY/T 10030 Recommended practices for planning, design and construction of fixed offshore platforms - Working stress design method

3 Terms and definitions

The terms and definitions defined in GB/T 8423.5 and the following apply to this document.

3.1 Modular drilling rig

It is an assembled offshore drilling rig with a modular structure placed on the deck of an offshore oil fixed platform.

Note: It consists of drilling equipment system module, drilling support system module, bulk tank module, cementing module, logging module and logging module.

3.2 Drilling equipment system module

Equipment and structures placed on the deck of an offshore oil fixed platform to realize lifting and rotating functions during drilling operations.

Note: It consists of derrick, base, winch, crane, traveling block, top drive (hook, faucet), turntable, blowout preventer, driller's room and drilling floor equipment.

3.3 Drilling support system module

Equipment and structures placed on the deck of an offshore oil fixed platform to provide operational support for drilling rigs.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 25 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB/T 29549.1

EditionTitleRevisionStatus
GB/T 29549.1-2023Specification for offshore modular drilling rigs on fixed platforms—Part 1: Designcurrent editionCurrent
GB/T 29549.1-2013Specification for offshore modular drilling rigs on fixed platforms—Part 1: Designprevious editionSuperseded

This page sells the current edition, GB/T 29549.1-2023. Earlier editions are listed for reference only.

How to Download GB/T 29549.1-2023

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
25 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 29549.1-2023

$420.00