Scope
GB/T 47273-2026 is the English-translated version of 海上组块浮托安装的设计与施工规范.
GB/T 47273-2026 is the Chinese national standard covering the floatover installation - a barge carrying a complete platform topside is floated between the legs of the jacket and ballasted down until the structure lands on it, which puts thousands of tonnes in place in a few hours without a heavy lift crane. The mating happens in a window of minutes and cannot be reversed. First edition, in force since 1 July 2026. It was issued on 31 March 2026 and has been in force since 1 July 2026, as a first edition. The document is under the responsibility of the Standardization Administration of China. This page is published from the official record of the 2026 edition; the clause text of a standard this recent is not yet in circulation, and the figures, limits and tables it contains are those of the document itself, delivered in full with the English translation.
Document preview — GB/T 47273-2026
National Standard of the People's Republic of China
- ICS
- 75.180.10
- Classification
- E 94
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1.Scope1
- 2 Normative References1
- 3.Terms and Definitions1
- 4.Abbreviations2
- 5.General Requirements for Floating Installation Design2
- 5.1 General Rules2
- 5.2 Loading3
- 5.3 Towing5
- 5.4 Standby5
- 5.5 Advancing and Retreating the Ship6
- 5.6 Docking7
- 6.1 Ship loading design7
- 6.2 Towing Design8
- 6.3 Standby Design8
- 6.4 Forward and Reverse Ship Design9
- 6.5 Dock Design9
- 7.Design of Floating Installation for Dynamically Positioned Vessels10
- 7.1 General Requirements10
- 7.2 Shipboard Design10
- 7.3 Flight Design10
- 7.4 Standby Design11
- 7.5 Advance and Retreat Design11
- 7.6 Dock Design11
- 8 Model Experiment11
- 8.1 Scale ratio11
- 8.2 Environmental Condition Simulation11
- 8.3 Model Making12
- 8.4 Test Condition12
- 9 Virtual Simulation13
- 9.1 General Requirements13
- 9.2 Standby Operation14
- 9.3 Ship Entry Operation14
- 9.4 Docking Operation14
- 9.5 Ship withdrawal operation14
- 9.6 Emergency Response14
- 10 Float installation monitoring and offshore construction14
- 10.1 Monitoring of Float Installation14
- 15 Reference17
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part
1.Structure and Drafting Rules of Standardization Documents". Drafting. Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents. This document was proposed and is under the jurisdiction of the National Technical Committee on Standardization of Petroleum and Natural Gas (SAC/TC355). This document was drafted by: CNOOC Research Institute Co., Ltd., Offshore Oil Engineering Co., Ltd., and COSCO Shipping Specialized Carriers Co., Ltd. Joint-stock company, Shanghai Jiao Tong University, and Dagang Oilfield Branch of China National Petroleum Corporation. The main drafters of this document are. Li Da, Bai Xueping, Li Huailiang, Cai Liancai, Yi Cong, Li Xin, Qin Licheng, Wei Xian, Yuan Meng, Su Yunlong, and Lin Weinan. Tian Xinliang, Gao Wei, Li Gang, He Ning, Zhang Jingwen, Fang Xukai, Deng Xiaokang, Fan Chenxue, Xie Weiwei, Ma Rongtai, Fu Shenglei, Sun Mingyuan, Zhang Guanglei Zhang Ding, Li Xinchao, Fu Shaohong, Wang Jiqiang, Li Peng, Mao Chengliang, Lei Yu, Liang Xuexian, Liao Wendong, Li Qinpeng, Li Weifeng, Yuan Haiping. Design and construction specifications for offshore modular floating installation
1 Scope
GB/T 47273-2026 is the Chinese national standard covering the floatover installation - a barge carrying a complete platform topside is floated between the legs of the jacket and ballasted down until the structure lands on it, which puts thousands of tonnes in place in a few hours without a heavy lift crane. The mating happens in a window of minutes and cannot be reversed. First edition, in force since 1 July 2026. It was issued on 31 March 2026 and has been in force since 1 July 2026, as a first edition. The document is under the responsibility of the Standardization Administration of China. This page is published from the official record of the 2026 edition; the clause text of a standard this recent is not yet in circulation, and the figures, limits and tables it contains are those of the document itself, delivered in full with the English translation.
This document specifies the general design requirements for offshore modular floating installation, the design for floating installation on non-powered barges, and the design for floating installation on dynamically positioned vessels. Requirements related to equipment design, model testing, virtual simulation, floating installation monitoring, and offshore construction. This document applies to the design and construction of offshore modular floating installations; it can be used as a reference for floating removal.
2 Normative references
This document has no normative references.
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Floatover By adjusting the ballast water volume of the tidal vessel and utilizing tidal changes, the height of the superstructure is adjusted, placing the superstructure on top of the lower support structure. One type of installation method for the part.
3.2 Substructure Fixed to the seabed or floating on the sea surface, it is used to support the upper module of the platform.
3.3 Substructure slot of the lower support structure The space between the legs of the lower support structure is used for the entry and exit of floating vessels.
3.4 Deck support frame (DSF) A structure located between the superstructure and the hull, used to support the superstructure and distribute the load of the superstructure to the hull.
3.5 Deck separation unit (DSU) Installed on the upper part of the upper module support structure, it is used to buffer the separation of the upper module from the floating vessel. A device for inter-collision force.
3.6 Leg mating unit (LMU) Installed on the upper end of the legs of the lower support structure or the lower end of the legs of the upper module, it is used to buffer the upper module when it docks with the lower support structure. A device for controlling the collision force between the block and the lower supporting structure.
3.7 swayfender Located between the two sides of the trolley and the substructure, it consists of a fixed structure and rubber fenders, and is used to buffer the impact between the trolley and the substructure. Fenders that support the lateral collision force between supporting structures.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 21 pages — is available in the English PDF.
How to Buy GB/T 47273-2026
- 1Add to cart. Click the "Buy GB/T 47273-2026" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 47310-2026 — Determination of total silicon, aluminium, iron, potassium, sodium, calcium, magnesium, manganese, phosphorus, titanium and sulfur in soil - Monochromatic excitation energy dispersive X-ray fluorescence spectrometry
GB/T 47321-2026 — Specification for the warning data exchange of the national emergency early warning dissemination system
GB/T 47293-2026 — Determination of available mercury in soil
Secure payment via Stripe
Payments accepted
GB/T 47273-2026
$305.00