GB/T 29320-2024Technical requirements for solar tracking system of photovoltaic power station (English PDF)
光伏电站太阳跟踪系统技术要求
Open the GB/T 29320-2024 preview as PDF
This is a limited preview
Buy now to download the full PDF (34 pages)
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
August 23, 2024
Implementation date
August 23, 2024
Scope
GB/T 29320-2024 is the English-translated version of 光伏电站太阳跟踪系统技术要求.
GB/T 29320-2024 sets the technical requirements for solar trackers in photovoltaic power stations. Trackers now carry the majority of new utility-scale capacity because the extra yield outweighs their cost, but they turn a static structure into a machine with drives, bearings and a control system standing in the open for twenty-five years, and their characteristic failures are structural: the wind loads on a large tracker depend on its stow strategy and on the aeroelastic behaviour of a long torque tube, and rows have been destroyed in wind events that the modules alone would have survived. The standard sets the classification and composition, then the requirements: the tracking accuracy and the control algorithm, the mechanical structure and its strength, stiffness and deflection, the drive and transmission, the wind protection and the stow strategy and its actuation, the electrical and control system and its communications, the protection, reliability and durability, and the corrosion protection, followed by the test methods and inspection rules. It took effect on 23 August 2024.
Document preview — GB/T 29320-2024
National Standard of the People's Republic of China
- ICS
- 27.160
- Classification
- F12
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope1
- 2 Normative references1
- 3 Terms and Definitions2
- 4 General Requirements4
- 5 Normal working conditions4
- 6 Appearance4
- 7 Structure5
- 8 Features5
- 9 Performance6
- 10 Test requirements10
- 11 Appearance inspection12
- 12 Structural test12
- 13 Functional test14
- 14 Performance Test15
- 15 Energy consumption test20
- 16 Environmental adaptability test20
- 17 Inspection Rules22
- 29 References30
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part
1.Structure and drafting rules for standardization documents" Drafting. This document replaces GB/T 29320-2012 "Technical requirements for solar tracking systems in photovoltaic power plants" and is consistent with GB/T 29320-2012. In addition to structural adjustments and editorial changes, the main technical changes are as follows:
--- Changed the scope of application of the document (see Chapter 1, Chapter 1 of the.2012 edition);
--- Deleted the provisions on the method of compiling tracking system models (see Appendix B of the.2012 edition);
---Changed the wind speed condition for the tracking system to automatically enter the shelter state, and added the wind speed condition for the tracking system to automatically release the shelter state (see 8.1.2, 8.1.3,
4.2.1 of the.2012 edition);
--- Deleted "In wind resistance state, the tracking system should be able to withstand a wind speed of 33m/s; in areas with wind speeds above level 12, it should be able to withstand 42m/s wind speed" requirement (see
4.2.1 of the.2012 edition);
--- Deleted the requirement that "in snowy areas, the tracker system should have manual or automatic snow avoidance function" (see
4.2.2 of the.2012 edition);
--- Changed the normal working conditions of the tracking system (see Chapter 5, 4.2.3, 4.2.4,
4.2.5 of the.2012 edition);
--- The anti-corrosion requirements for steel supports have been changed (see 4.3, 4.2.7.1, 4.2.7.2,
4.2.7.3 of the.2012 edition);
1 Scope
GB/T 29320-2024 sets the technical requirements for solar trackers in photovoltaic power stations. Trackers now carry the majority of new utility-scale capacity because the extra yield outweighs their cost, but they turn a static structure into a machine with drives, bearings and a control system standing in the open for twenty-five years, and their characteristic failures are structural: the wind loads on a large tracker depend on its stow strategy and on the aeroelastic behaviour of a long torque tube, and rows have been destroyed in wind events that the modules alone would have survived. The standard sets the classification and composition, then the requirements: the tracking accuracy and the control algorithm, the mechanical structure and its strength, stiffness and deflection, the drive and transmission, the wind protection and the stow strategy and its actuation, the electrical and control system and its communications, the protection, reliability and durability, and the corrosion protection, followed by the test methods and inspection rules. It took effect on 23 August 2024.
This document specifies the normal working conditions, appearance, structure, function, The technical requirements for performance, as well as inspection rules, marking, packaging, transportation and storage, describe the corresponding test methods. This document applies to the design, manufacture, installation, commissioning, acceptance, testing, operation and maintenance of solar tracking systems for photovoltaic power stations.
2 Normative references
The contents of the following documents constitute essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document.
GB/T 191 Pictorial markings for packaging, storage and transportation
GB/T 2423.3 Environmental testing Part
3 Radio frequency electromagnetic field radiation immunity test
GB/T 17626.4 Electromagnetic compatibility test and measurement technology Electrical fast transient pulse group immunity test
GB/T 17626.5 Electromagnetic compatibility test and measurement technology Surge (impact) immunity test
GB/T 17626.6 Electromagnetic compatibility test and measurement technology - Immunity to conducted disturbances induced by radio frequency fields
GB/T 17626.8 Electromagnetic compatibility test and measurement technology Power frequency magnetic field immunity test
GB/T 17626.11 Electromagnetic compatibility test and measurement technology Part
11.Equipment with input current less than or equal to 16A per phase Voltage dips, short interruptions and voltage variations immunity test
GB/T 17627 High voltage test technical definitions, test and procedure requirements, and test equipment for low voltage electrical equipment
GB/T 18802.11 Low voltage surge protective device (SPD) Part
11.Performance requirements and specifications of surge protective devices for low voltage power supply systems
6 Inspection
GB/T 17626.2 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test
GB/T 17626.3 Electromagnetic compatibility test and measurement technology Part
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 34 pages — is available in the English PDF.
Referenced standards
Normative references
GB/T 2423.3 · GB/T 2423.4 · GB/T 2423.18 · GB/T 2424.6
Similar standards
GB 38031-2025|GB/T 29320|GB/T 29320-2012|GB/T29320-2024|GB/T 1.1-2020|GB/T 191|GB/T 2423.3|GB/T 2423.4
How to Buy GB/T 29320-2024
- 1Add to cart. Click the "Buy GB/T 29320-2024" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 191-2025 — Graphical symbols marking for handling and storage of packages
GB/T 1910-2015 — Newsprint
GB/T 19100-2003 — Terminology work--Establishment of concept system
Secure payment via Stripe
Payments accepted
GB/T 29320-2024
$545.00