Valid

GB/T 28686-2012Gas turbines thermodynamic performance tests (English PDF)

燃气轮机热力性能试验

Preview PDF

This is a limited preview

Buy now to download the full PDF (41 pages)

Need quotation for your management?

Get a formal quotation for GB/T 28686-2012 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

September 3, 2012

Implementation date

January 1, 2013

Scope

GB/T 28686-2012 is the English-translated version of 燃气轮机热力性能试验.

GB/T 28686-2012 is the Chinese standard "Gas turbines thermodynamic performance tests". Its scope clause reads: This standard specifies the test methods for power, Heat Rate (thermal efficiency) and other major performance parameters of the gas turbine power generation unit.

The aim is to Determine thermal performance test results and revise the gas turbine under test conditions.

This standard applies to the fuel gas or liquid fuels (solid or before entering the gas turbine fuel into a gas or liquid fuel) burning Test gas turbine including with emission control and/or power increasing device (such as fluid injection and intake process) gas turbine test.

It can be adapted For a gas turbine combined cycle plant in the band or other heat recovery systems. This standard does not apply to gas turbines are being developed. Its clauses include definitions and symbols.

Found what you need?

Document preview — GB/T 28686-2012

National Standard of the People's Republic of China

ICS
27.040
Classification
K 56

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Definitions and symbols
  • 3.1 Terms and definitions
  • 3.2 Symbols
  • 3.3 subscript
  • 4 Guiding Principles
  • 4.1 test program
  • 4.2 Test preparation
  • 4.3 Test Example
  • 4.4 Test record
  • 4.5 Effectiveness Test
  • 4.6 Uncertainty
  • 5 instruments and methods of measurement
  • 5.1 General Requirements
  • 5.2 pressure measurement
  • 5.3 Temperature measurement
  • 5.4 Flow Measurement
  • 5.5 Measurement of gaseous fuels
  • 5.6 Measurement of liquid fuel
  • 5.7 Electric Power Measurement
  • 5.8 Speed Measurement
  • 5.9 determine the thermodynamic calculation power
  • 6 The results of calculation
  • 6.1 Electric power calculation
  • 6.2 electrical power is converted to mechanical power
  • 6.3 heat consumption, thermal efficiency and heat consumption rate
  • 6.4 Fixed basic performance test results --- Formula
  • 7 Test Uncertainty
  • 7.1 Overview
  • 7.2 Calculation of Uncertainty
  • Appendix A (informative) Calculation Example
  • References

1 Scope

This standard specifies the test methods for power, Heat Rate (thermal efficiency) and other major performance parameters of the gas turbine power generation unit. The aim is to

Determine thermal performance test results and revise the gas turbine under test conditions.

This standard applies to the fuel gas or liquid fuels (solid or before entering the gas turbine fuel into a gas or liquid fuel) burning

Test gas turbine including with emission control and/or power increasing device (such as fluid injection and intake process) gas turbine test. It can be adapted

For a gas turbine combined cycle plant in the band or other heat recovery systems.

This standard does not apply to gas turbines are being developed.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated edition applies to this article

Member. For undated references, the latest edition (including any amendments) applies to this document.

GB/T 384-1981 Determination of calorific value of petroleum products

GB/T 2624.1-2006 with differential pressure measuring device mounted to round pipe full pipe fluid flow - Part 1. General

Principles and requirements

GB/T 2624.2-2006 with differential pressure measuring device mounted to round pipe full pipe fluid flow Part 2. Orifice

GB/T 2624.3-2006 with differential pressure measuring device mounted to round pipe full pipe fluid flow - Part 3. Nozzle

Venturi nozzle

GB/T 2624.4-2006 with differential pressure measuring device mounted to round pipe full pipe fluid flow - Part 4. Venturi

Tube

GB/T 14100-2009 gas turbine acceptance test

GB/T 15135-2002 turbine Glossary

GB/T 18345.1-2001 gas turbine flue gas emission - Part 1. Measurement and Evaluation

GB/T 18345.2-2001 gas turbine flue gas emission - Part 2. Automated emission monitoring

3 Definitions and symbols

3.1 Terms and Definitions

GB/T 14100, GB/T 15135 and define the following terms and definitions apply to this document.

3.1.1 Absolute performance

Gas turbine power generating plant performance (power, heat consumption rate, exhaust gas temperature, exhaust gas flow rate/energy) under certain conditions.

3.1.2 Auxiliary power

Gas turbine power generating apparatus required by other places or test the boundaries defined by the required power consumption.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 41 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 28686-2012

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
41 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 28686-2012

$650.00