GB/T 27977-2022Test and calculation methods of electricity efficiency in cement production (English PDF)
水泥生产电能能效测试及计算方法
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 27977-2022 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
December 30, 2022
Implementation date
July 1, 2023
Scope
GB/T 27977-2022 is the English-translated version of 水泥生产电能能效测试及计算方法.
GB/T 27977-2022 gives the method for testing and calculating electric energy efficiency in the production of cement and clinker, and the content of the report that follows.
The test counts the electricity consumed and the output produced, checks how the main power supply and distribution equipment and the main electrical equipment run, and measures power quality, so that the effect of electricity use can be judged.
The document covers the power quality test, the efficiency test of the main electrical equipment including the main ventilator, the division of production systems, the measuring and testing instruments, the calculation formulae, among them the comprehensive power consumption per unit of product, and the basic requirements for the test report.
It applies to cement and clinker producers. It replaces GB/T 27977-2011, was issued on 30 December 2022 and has applied since 1 July 2023.
Found what you need?
Document preview — GB/T 27977-2022
National Standard of the People's Republic of China
- ICS
- 91.100.10
- Classification
- Q 11
- Replacing
- GB/T 27977-2011
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents" drafting.
This document replaces GB/T 27977-2011 "Test and Calculation Method of Electric Energy Efficiency in Cement Production", and is consistent with GB/T 27977-2011 In addition to structural adjustments and editorial changes, the main technical changes are as follows.
a) Changed the name and definition of electric energy efficiency test for cement production, changed the comprehensive power consumption per unit product, comprehensive power consumption of raw materials, raw meal Terms and definitions of comprehensive power consumption, fuel comprehensive power consumption, auxiliary production power consumption (see 3.1~3.5 and 3.11, 3.1~ 3.6);
b) The power consumption of raw material pretreatment main engine, raw meal preparation main engine power consumption, fuel preparation main engine power consumption, clinker burning main engine power consumption, cement Terms and definitions of power consumption of main grinding machine and auxiliary production (see 3.6~3.10 and 3.12);
c) Added power quality test method (see 4.3);
d) Increase the efficiency test requirements of main electrical equipment, and define the main ventilator (see 4.4);
e) Added division of production systems (see 4.5.2);
f) Changed the requirements for measuring instruments and testing instruments (see 4.5.4, 4.3.2.5 of the 2011 edition);
g) Added requirements for on-site test conditions (see 4.5.6.1);
h) Changed the test content and requirements of the field test method (see 4.5.6.1~4.5.6.6, 4.3.2.1 of the 2011 edition);
i) Deleted the test records and related formats (see Chapter 5 and Appendix A of the 2011 edition);
j) Added the calculation formula for the power consumption of the process host (see 5.2);
k) Added basic requirements for electrical energy efficiency test reports (see Chapter 6).
1 Scope
This document specifies the electrical energy efficiency test, calculation method and electrical energy efficiency test report for the cement and clinker production process.
This document is applicable to the electric energy efficiency test of cement and clinker production enterprises.
2 Normative references
The contents of the following documents constitute the essential provisions of this document through normative references in the text. Among them, dated references Only the version corresponding to that date applies to this document. For undated references, the latest edition (including any amendments) applies to this document.
GB 175 General Portland cement
GB/T 2589 General rules for comprehensive energy consumption calculation
GB/T 10178 Field Performance Test of Industrial Ventilators
GB/T 12325 power quality power supply voltage deviation
GB/T 12497 Economical operation of three-phase asynchronous motors
GB/T 14549 Power Quality Harmonics of Public Grid
GB/T 15543 Power Quality Three-phase Voltage Unbalance
GB/T 15945 Power Quality Power System Frequency Deviation
GB/T 16664 Energy-saving monitoring methods for power supply and distribution systems of enterprises
GB 16780 Cement energy consumption limit per unit product
GB 17167 General rules for equipment and management of energy measuring instruments for energy-consuming units
GB 19761 Ventilation fan energy efficiency allowable value and energy efficiency grade
GB/T 21372 Portland cement clinker
GB/T 23331 Energy Management System Requirements and Guidelines for Use
GB/T 26282 Determination method of heat balance of cement rotary kiln
GB/T 33652 Technical Regulations for Energy Consumption Testing of Cement Manufacturing
GB/T 35461 Requirements for equipment and management of energy measuring instruments in cement production enterprises
3 Terms and Definitions
GB/T 2589, GB 16780 and the following terms and definitions apply to this document.
3.1 Electric energy efficiency test for cement production
Statistics and measurement of the electric energy consumption in the cement production process and the output of the products produced, and the main power supply and distribution equipment The process of testing the operating conditions and power quality of main electrical equipment to determine the effect of power utilization.
3.2 Comprehensive power consumption per unit product
During the statistical period or test period, the electricity consumed by cement production enterprises or production systems to produce products is converted into the electricity consumed by 1 ton of products
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- GB 175Common portland cement
- GB/T 2589General rules for calculation of the comprehensive energy consumption
- GB/T 10178Industrial fans -- Performance testing in situ
- GB/T 12325Power quality - Deviation of supply voltage
- GB/T 12497Three-phase induction motor's economic operation
- GB/T 14549Quality of electric energy supply--Harmonics inpublic supply network
Cited by
- GB/T 33650-2025Technical requirement of energy consumption evaluation for cement manufacturing
- GB/T 33652-2025Technical regulation of energy consumption test for cement manufacturing
- GB 16780-2021The norm of energy consumption per unit product of cement
- GB/T 26281-2021Methods for the calculation of heat balance, heat efficiency and comprehensive energy consumption of cement rotary kiln
- GB/T 33650-2017Technical Requirement of Energy Consumption Evaluation for Cement Manufacturing
Similar standards
Editions of GB/T 27977
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 27977-2022 | Test and calculation methods of electricity efficiency in cement production | current edition | Current |
| GB/T 27977-2011 | Test and calculation methods of electricity efficiency in cement production | previous edition | Superseded |
This page sells the current edition, GB/T 27977-2022. Earlier editions are listed for reference only.
How to Download GB/T 27977-2022
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 16780-2021 — The norm of energy consumption per unit product of cement
GB 17167-2025 — General rules for energy measuring instrument equipping and managing of energy user
GB 175-2023 — Common portland cement
Secure payment via Stripe
Payments accepted
GB/T 27977-2022
$255.00