GB/T 26255-2022Steel-plastic-transition fittings for polyethylene(PE) piping systems for the supply of gaseous fuels (English PDF)
Also coversGBT26255-2022
Open the GB/T 26255-2022 preview as PDF
This is a limited preview
Buy now to download the full PDF
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
April 15, 2022
Implementation date
November 1, 2022
Scope
GB/T 26255-2022 (Steel-plastic-transition fittings for polyethylene(PE) piping systems for the supply of gaseous fuels) is available as an English-translated PDF.
GB/T 26255-2022 — This document specifies the steel-plastic conversion fittings for transitional connection between PE pipes and metal pipes in polyethylene (PE) piping systems for gas (the following (referred to as steel-plastic conversion) materials, product classification, requirements, test methods, inspection rules, marking, packaging, transportation and storage. This document is applicable to the PE pipeline system and its components for gas transmission and distribution with a working temperature of -20 degrees C~40 degrees C. The end of the part can be connected with other metal pipes by thread, welding or flange, and the end of the PE part can be connected with PE by means of hot-melt butt, electro-fusion connection, etc. Pipe connection. Note. This document specifies the steel-plastic conversion parts and their overall performance and requirements. Its purpose is to ensure the pressure resistance, sealing and The ability of the connection end to resist the load, the steel-plastic joint part in the steel-plastic transformation will not be pulled out before the pipe section at the end of the PE part yields (breaks) under tension or compression. It is the responsibility of the purchaser to properly select the products specified in this document according to their specific application requirements and in combination with relevant regulations, standards or specifications. Manufacturing According to the product use or field, conveying medium, maximum working pressure (MOP), component material, rigid element used, the ability of the connection end to resist load, resistance Corrosion, operating temperature range for installation and use, etc., are declared in the technical file.
Document preview — GB/T 26255-2022
National Standard of the People's Republic of China
- Classification
- G 33
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- foreword
- 5.3 of.2010);
- 6.1 of.2010);
- 6.9 of GB/T 26255.2-2010);
- 1 Scope
- 2 Normative references
foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
drafted.
This document replaces GB/T 26255.1-2010 "Mechanical fittings for polyethylene piping systems for gas - Part 1.The nominal outer diameter is not large
Steel-plastic conversion pipe fittings for pipes up to 63mm" and GB/T 26255.2-2010 "Mechanical pipe fittings for polyethylene piping systems for gas, No. 2
Part. Steel-plastic conversion pipe fittings for pipes with a nominal outer diameter greater than 63mm", and GB/T 26255.1-2010 and GB/T 26255.2-2010
In contrast, except for structural adjustments and editorial changes, the main technical changes are as follows.
a) Added the content that the purchaser is concerned about (see Chapter 1, GB/T 26255.1-2010 and GB/T 26255.2-2010, Section 1
chapter);
b) Added and deleted related terms, definitions, symbols and abbreviations (see Chapter 3, GB/T 26255.1-2010 and
Chapter 3 of GB/T 26255.2-2010);
c) Changed the requirements for the classification and naming of polyethylene compounds (see 4.1.2, GB/T 26255.1-2010 and GB/T 26255.2-
5.3 of.2010);
d) Changed the material requirements for metal parts (see 4.2.2, GB/T 26255.1-2010 and 5.2 of GB/T 26255.2-2010);
e) Added the material requirements for anti-corrosion layer (see 4.2.3);
f) Changed the material requirements of elastic sealing ring (see 4.2.4, GB/T 26255.1-2010 and GB/T 26255.2-2010 5.4);
g) Added the requirements for recycled materials of polyethylene parts (see 4.3);
h) Added the chapter "Product Classification" (see Chapter 5);
i) Changed the design requirements for steel-plastic conversion (see 6.1.1, 6.1.2 and 6.1.3, GB/T 26255.1-2010 and GB/T 26255.2-
6.1 of.2010);
j) The design requirements for surface pretreatment and polyethylene heat-shrinkable jacket before coating of fusion-bonded epoxy powder coating are added (see 6.1.4);
k) Changed the appearance requirements (see 6.2, GB/T 26255.1-2010 and 6.2 of GB/T 26255.2-2010);
l) Changed the size requirements of PE parts (see 6.4.2, 6.7 of GB/T 26255.1-2010 and GB/T 26255.2-2010);
m) Added the specification and size of the steel-plastic conversion (see 6.4.3);
n) Change the minimum inner diameter requirements (see 6.4.4, GB/T 26255.1-2010 and GB/T 26255.2-2010 6.8);
o) Deleted the requirement for gas flow rate under constant pressure drop, changed to Note (see 6.4.4, Clause 8 of GB/T 26255.1-2010
chapter);
p) The thickness requirements for the anti-corrosion coating of steel pipe components are added (see 6.4.5);
q) Changed the performance requirements for anti-corrosion coating of steel pipe components (see 6.6, GB/T 26255.1-2010 and GB/T 26255.2-2010 Section 1).
Chapter 8 Table 1);
r) The requirement for the number of sealing rings has been increased (see 6.9);
s) Delete the sample preparation requirements (GB/T 26255.1-2010 and Chapter 7 of GB/T 26255.2-2010);
t) Deleted the tightness test in the production process, and changed it to the description of the inspection rules (see 8.3.3, 6.8, 6.8 of GB/T 26255.1-2010).
6.9 of GB/T 26255.2-2010);
u) Change the requirements for the preparation of hydrostatic samples (see 7.4.1, GB/T 26255.1-2010 and 9.4 of GB/T 26255.2-2010);
v) Changed the inspection requirements for internal pressure sealing performance after tensile load at 23°C (see 7.6, GB/T 26255.1-2010 and
9.3.1 of GB/T 26255.2-2010);
w) Changed the axial tension in the sealing test after tensile load at 80°C (see 7.7, GB/T 26255.1-2010 and
9.3.2 of GB/T 26255.2-2010);
x) Added the test method for the performance of FBE steel-plastic conversion and 3PE steel-plastic conversion anti-corrosion coating (see 7.11);
y) Changed the size grouping (see 8.2.2, 10.3.1.1 of GB/T 26255.2-2010);
z) The way of expressing the items of factory inspection and type inspection has been added (see 8.3.1);
aa) The tightness test and leak detection test in the production process are added (see 8.3.3);
bb) Changed the content of the logo (see Chapter 9, Chapter 11 of GB/T 26255.1-2010 and GB/T 26255.2-2010);
cc) Changed the internal pressure tightness test method (see Appendix A, GB/T 26255.1-2010 and GB/T 26255.2-2010 appendix
Record A);
dd) Changed the test method of resistance to bending internal pressure sealing (see Appendix B, Appendix B of GB/T 26255.1-2010);
ee) Added the adhesion test method (see Appendix C);
ff) Added the cathodic disbondment test method (see Appendix D);
gg) Added peel strength test method (see Appendix E).
This document is drafted with reference to ISO 17885.2015 "Specification for Mechanical Fittings for Pressure Piping Systems in Plastic Piping Systems", the degree of consistency
is not equivalent.
Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents.
1 Scope
This document specifies the steel-plastic conversion fittings for transitional connection between PE pipes and metal pipes in polyethylene (PE) piping systems for gas (the following
(referred to as steel-plastic conversion) materials, product classification, requirements, test methods, inspection rules, marking, packaging, transportation and storage.
This document is applicable to the PE pipeline system and its components for gas transmission and distribution with a working temperature of -20 degrees C~40 degrees C.
The end of the part can be connected with other metal pipes by thread, welding or flange, and the end of the PE part can be connected with PE by means of hot-melt butt, electro-fusion connection, etc.
Pipe connection.
Note. This document specifies the steel-plastic conversion parts and their overall performance and requirements. Its purpose is to ensure the pressure resistance, sealing and
The ability of the connection end to resist the load, the steel-plastic joint part in the steel-plastic transformation will not be pulled out before the pipe section at the end of the PE part yields (breaks) under tension or compression.
It is the responsibility of the purchaser to properly select the products specified in this document according to their specific application requirements and in combination with relevant regulations, standards or specifications. Manufacturing
According to the product use or field, conveying medium, maximum working pressure (MOP), component material, rigid element used, the ability of the connection end to resist load, resistance
Corrosion, operating temperature range for installation and use, etc., are declared in the technical file.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations
documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to
this document.
GB/T 2828.1 Counting Sampling Inspection Procedure Part 1.Lot-by-Lot Inspection Sampling Plan Retrieved by Acceptance Quality Limit (AQL)
GB/T 2918 Standard Environment for Conditioning and Testing of Plastic Specimens
GB/T 6111 Determination of internal pressure resistance of thermoplastic piping systems for fluid transportation
GB/T 7306.2 55° sealing pipe thread part 2.conical internal thread and conical external thread
GB/T 8163 Seamless steel pipes for conveying fluids
GB/T 8806 Determination of dimensions of plastic parts of plastic piping systems
GB/T 8923.1 Visual assessment of surface cleanliness of steel surface preparations before coating - Part 1.Uncoated steel
The rust grade and treatment grade of the surface and the steel surface after the full removal of the original coating
GB/T 15558.1 Buried Polyethylene (PE) Pipeline System for Gas - Part 1.Pipe
GB/T 15558.2 Buried Polyethylene (PE) Pipeline System for Gas - Part 2.Pipe Fittings
GB/T 18252 Plastic piping systems Determination of long-term hydrostatic strength of thermoplastic materials in tubular form by extrapolation
GB/T 18475 Material Grading and Nomenclature for Thermoplastic Pressure Pipes and Fittings General Use (Design) Factor
GB/T 18570.3 Evaluation test for surface cleanliness of steel surface treatment before coating - Part 3.Steel before coating
Surface Dust Assessment (Pressure Sensitive Adhesive Tape Method)
GB/T 18570.9 Test for the evaluation of surface cleanliness of steel surface treatment before coating - Part 9.Field of water-soluble salts
Conductivity determination
GB/T 19278-2018 General terms and definitions for thermoplastic pipes, fittings and valves
GB/T 23257 Buried steel pipeline polyethylene anti-corrosion coating
GB/T 23258 Specification for Internal Corrosion Control of Steel Pipes
GB/T 23658 Elastomer sealing ring Material requirements for sealing rings for pipelines and fittings for conveying gaseous fuels and hydrocarbon liquids
GB 50236 Construction Specifications for Field Equipment and Industrial Pipeline Welding Engineering
SY/T 0315 Technical Specification for Fusion Bonded Epoxy Powder Coating for Steel Pipes
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 2828.1Sampling procedures for inspection by attributes - Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection
- GB/T 8163Seamless steel pipes for liquid service
- GB/T 15558.1Buried polyethylene(PE) piping systems for the supply of gaseous fuels - Part 1: General
- GB/T 15558.2Buried polyethylene(PE) piping systems for the supply of gaseous fuels - Part 2: Pipes
- GB/T 19278-2018General terms and their definitions of thermoplastic pipes, fittings and valves
- GB/T 23257Polyethylene coating for buried steel pipelines
GB/T 2918 · GB/T 6111 · GB/T 7306.2 · GB/T 8806 · GB/T 8923.1 · GB/T 18252 · GB/T 18475 · GB/T 18570.3 · GB/T 18570.9 · GB/T 23658 · GB 50236
How to Buy GB/T 26255-2022
- 1Add to cart. Click the "Buy GB/T 26255-2022" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 15558.1-2023 — Buried polyethylene(PE) piping systems for the supply of gaseous fuels - Part 1: General
GB/T 15558.2-2023 — Buried polyethylene(PE) piping systems for the supply of gaseous fuels - Part 2: Pipes
GB/T 19278-2018 — General terms and their definitions of thermoplastic pipes, fittings and valves
Secure payment via Stripe
Payments accepted
GB/T 26255-2022