GB/T 25337-2018Railway heavy-duty maintenance machinery - General technical specifications (English PDF)
铁路大型养路机械 通用技术条件
Open the GB/T 25337-2018 preview as PDF
This is a limited preview
Buy now to download the full PDF (13 pages)
Issued by
State Administration for Market Regulation; Standardization Administration of China
Level / Type
National · Recommended
Issue date
May 14, 2018
Implementation date
December 1, 2018
Scope
GB/T 25337-2018 is the English-translated version of 铁路大型养路机械 通用技术条件.
China's national general technical specification for railway heavy-duty track maintenance machinery. It specifies the general requirements for the design, manufacture and acceptance of the large self-propelled machines used to maintain railway track. Track maintenance is the largest recurring cost of a railway, and the machines that do it are what made modern track possible: continuously welded rail on concrete sleepers cannot be maintained by hand, and the geometry a high-speed line requires is beyond what manual methods can hold. So a railway operates a fleet of specialised vehicles - tampers that lift, line and pack the ballast under the sleepers, regulators that redistribute it, stabilisers that consolidate the track after tamping so it does not settle unevenly under the first trains, grinders that reprofile the railhead, and ballast cleaners that excavate, screen and return the ballast. This standard states what all of them have to be, leaving the type-specific requirements to the individual standards. The distinctive constraints are those of a machine that is also a train. It must be able to run in a train path at line speed, which brings it under the rolling stock requirements for brakes, running behaviour, gauge and coupling. It works in a possession with a limited window, so setting up, working and clearing the line have to happen within it - and reliability is a safety matter rather than an availability one, since a machine that fails in the possession blocks the railway. And it works among people on foot in a live railway environment. The requirements accordingly cover the vehicle aspects, the working systems and their control, the measuring and guidance systems, the operator environment, the reliability and maintainability, and the safety. Issued on 14 May 2018 and in force since 1 December 2018, it replaces GB/T 25337-2010.
Document preview — GB/T 25337-2018
National Standard of the People's Republic of China
- ICS
- 45.120
- Classification
- S 22
Issued by: State Administration for Market Regulation; Standardization Administration of China
Contents
- 1 Scope1
- 2 Normative references1
- 3 Terms and Definitions2
- 4 Conditions of use 2 5 vehicle requirements2
- 6 Technical requirements for each system (component)3
- 7 High-altitude large-scale road maintenance machinery special requirements7
- 8 Inspection and test9
- 9 Marking, packaging and transportation of the whole vehicle9
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard replaces GB/T 25337-2010 "General technical conditions for railway large-scale line machinery", compared with GB/T 25337-2010, The main technical changes except editorial changes are as follows:
--- Removed vendor and user terms and definitions (see.2010, 3.1, 3.2);
--- Revised relative humidity (see 4.1.2,.2010 version 4.1.2);
---Modified ambient temperature (see 4.1.3,.2010 version 4.1.3);
--- Removed the sleeper type (see
4.2.4 of the.2010 edition);
--- Removed the requirement that the interior equipment bears the longitudinal acceleration shock of the whole vehicle (see
4.3.8 of the.2010 edition);
--- Removed continuous operation time and normal continuous working time requirements in the tunnel (see
4.3.17 of.2010 edition);
--- Deleted the job status lower bound requirement (see
4.3.2 of the.2010 edition);
---Modified the requirements for braking distance of large road maintenance machinery (see 5.23,
4.3.14 of.2010 edition);
1 Scope
China's national general technical specification for railway heavy-duty track maintenance machinery. It specifies the general requirements for the design, manufacture and acceptance of the large self-propelled machines used to maintain railway track. Track maintenance is the largest recurring cost of a railway, and the machines that do it are what made modern track possible: continuously welded rail on concrete sleepers cannot be maintained by hand, and the geometry a high-speed line requires is beyond what manual methods can hold. So a railway operates a fleet of specialised vehicles - tampers that lift, line and pack the ballast under the sleepers, regulators that redistribute it, stabilisers that consolidate the track after tamping so it does not settle unevenly under the first trains, grinders that reprofile the railhead, and ballast cleaners that excavate, screen and return the ballast. This standard states what all of them have to be, leaving the type-specific requirements to the individual standards. The distinctive constraints are those of a machine that is also a train. It must be able to run in a train path at line speed, which brings it under the rolling stock requirements for brakes, running behaviour, gauge and coupling. It works in a possession with a limited window, so setting up, working and clearing the line have to happen within it - and reliability is a safety matter rather than an availability one, since a machine that fails in the possession blocks the railway. And it works among people on foot in a live railway environment. The requirements accordingly cover the vehicle aspects, the working systems and their control, the measuring and guidance systems, the operator environment, the reliability and maintainability, and the safety. Issued on 14 May 2018 and in force since 1 December 2018, it replaces GB/T 25337-2010.
This standard specifies the terms and definitions of railway large-scale road maintenance machinery, the conditions of use, the requirements of the whole vehicle and each system (component), and the high altitude. Special requirements for road maintenance machinery, inspection and testing, marking, packaging and transportation of vehicles. This standard applies to railway large-scale road maintenance machinery used on 1435mm gauge. Non-standard gauge railway large-scale road maintenance machinery Refer to the implementation.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB 146.1 standard gauge railway locomotive vehicle limit
GB/T 2820.5 Reciprocating internal combustion engine driven alternator Part 5. Generator set ( GB/T 2820.5-2009,
ISO 8528-5.2005, IDT) General rules and safety requirements for
GB/T 3766 hydraulic drive systems and their components ( GB/T 3766-2015, ISO 4413. 2010, MOD)
GB 5226.1 Mechanical electrical safety machinery and electrical equipment - Part 1. General technical conditions ( GB 5226.1-2008, IEC 60204-1.2005, IDT)
GB/T 5599 Railway Vehicle Dynamics Performance Evaluation and Test Identification Specification
GB/T 5914.1 Locomotive driver's cab Part 1. Expectation conditions (
GB/T 5914.1-2015, UIC617-7. 1964, UIC625-6.19643, NEQ)
GB/T 6770-2000 Special safety rules for locomotive cabs (
GB/T 6770-2000, UIC617-5OR. 1977, IDT)
GB/T 7932 General rules and safety requirements for pneumatic systems and their components ( GB/T 7932-2017, ISO 4414.2010, IDT)
GB/T 17426 Railway special vehicles and railroad machinery dynamics performance evaluation and test methods
GB 20891 Diesel engine exhaust pollutant emission limit and measurement method for non-road mobile machinery (China's third and fourth stages)
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 13 pages — is available in the English PDF.
Referenced standards
Normative references
- GB 146.1Gauge for standard gauge railways - Part 1: Rolling stock gauge
- GB/T 5599Specification for dynamic performance assessment and testing verification of rolling stock
- GB/T 17426Dynamic performance evaluation and test method for particular class vehicles and tracked machine
- GB/T 25336-2018Railway heavy-duty maintenance machinery - Test and inspection methods
GB/T 2820.5-2009 · ISO 8528 · GB/T 3766-2015 · ISO 4413 · GB 5226.1-2008 · IEC 60204 · GB/T 5914.1-2015 · GB/T 6770-2000 · GB/T 7932-2017 · ISO 4414.2010 · GB 20891 · GB/T 21413.1-2008 · IEC 60077 · GB/T 21563-2008 · IEC 61373 · GB/T 24338.4-2009 · IEC 62236 · GB/T 25119-2010 · IEC 60571.2006
Similar standards
GB/T 25336-2018|GB/T 25337-2010|GB/T 5599-2019|GB/T 25333-2010|GB 5226.1-2019|GB/T 15706-2012
Editions of GB/T 25337
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 25337-2018 | Railway heavy-duty maintenance machinery - General technical specifications | first revision | Current |
| GB/T 25337-2010 | Railway heavy-duty maintenance machinery - General technical specifications | first issue | Superseded |
This page sells the current edition, GB/T 25337-2018. Earlier editions are listed for reference only.
How to Buy GB/T 25337-2018
- 1Add to cart. Click the "Buy GB/T 25337-2018" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 146.1-2020 — Gauge for standard gauge railways - Part 1: Rolling stock gauge
GB/T 17426-1998 — Dynamic performance evaluation and test method for particular class vehicles and tracked machine
GB/T 25336-2018 — Railway heavy-duty maintenance machinery - Test and inspection methods
Secure payment via Stripe
Payments accepted
GB/T 25337-2018
$150.00