Valid

GB/T 22724-2022Installation and equipment for liquefied natural gas—Design of onshore installations (English PDF)

液化天然气设备与安装 陆上装置设计

Preview PDF

This is a limited preview

Buy now to download the full PDF (115 pages)

Need quotation for your management?

Get a formal quotation for GB/T 22724-2022 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

March 9, 2022

Implementation date

October 1, 2022

Scope

GB/T 22724-2022 is the English-translated version of 液化天然气设备与安装 陆上装置设计.

GB/T 22724-2022 sets the technical requirements for the design of onshore liquefied natural gas installations.

It covers the design, construction, operation and maintenance of the fixed onshore facilities of LNG liquefaction plants, LNG receiving terminals, the onshore regasification part of floating storage units, LNG storage and distribution stations, peak shaving stations and ship bunkering stations - the siting and layout, the storage tanks, the process equipment and piping, safety, fire protection and the control systems.

It applies to LNG stations that are newly built, extended or rebuilt. Design institutes, gas companies and the authorities that approve a plant use it. It replaces GB/T 22724-2008, was issued on 9 March 2022 and has applied since 1 October 2022.

Found what you need?

Document preview — GB/T 22724-2022

National Standard of the People's Republic of China

ICS
75.060
Classification
E 24
Replacing
GB/T 22724-2008

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword6
  • 1 Scope9
  • 2 Normative references9
  • 3 Terms and definitions13
  • 4 Safety and environment16
  • 5 Liquefaction device30
  • 6 Storage system32
  • 7 Liquefied natural gas pump44
  • 8 Gasification of liquefied natural gas46
  • 9 Piping layout55
  • 10 Receiving and exporting natural gas66
  • 11 Recovery and treatment of evaporative gas67
  • 12 Wharf facilities71
  • 13 Electrical and building72
  • 14 Hazard management73
  • 15 Automatic control and communication77
  • 16 Construction, commissioning, maintenance83
  • 17 Anticorrosion84
  • 18 Training85
  • 19 Maritime training85
  • Appendix A (Normative) Radiant heat limits86
  • Appendix B (Normative) Seismic classification89
  • Appendix C (Informative) Schematic diagram of different types of LNG storage tanks .92
  • Appendix D (Normative) Reference flow98
  • Appendix E (Normative) Additional requirements for LNG pumps103
  • Appendix F (Normative) Pipeline design110
  • Appendix G (Normative) Odor112
  • References115

1 Scope

This document specifies the technical requirements for the design, construction, operation, maintenance of onshore fixed facilities for natural gas liquefaction plants (LNG plants), LNG receiving stations, onshore gasification parts of floating storage facilities, LNG storage and distribution stations, LNG peak shaving stations, ship LNG bunkering stations.

This document applies to the newly built, expanded, renovated LNG stations mentioned above.

2 Normative references

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, for dated reference documents, only the version corresponding to the date applies to this document; for undated reference documents, the latest version (including all amendments) applies to this document.

GB/T 150 (all parts) Pressure vessels

GB/T 3215 Centrifugal pumps for petroleum, petrochemical and natural gas industries

GB/T 3216 Rotodynamic pumps - Hydraulic performance acceptance tests - Grades 1, 2 and 3

GB/T 3836.1 Explosive atmospheres - Part 1: Equipment - General requirements

GB/T 8423.3 Petroleum and natural gas industries terminology - Part 3: Oil-gas surface engineering

GB/T 9445 Non-destructive testing - Qualification and certification of NDT personnel

GB 12348 Emission standard for industrial enterprises noise at boundary

GB 12523 Emission standard of environment noise for boundary of construction site

GB/T 12771 Welded stainless steel pipes for fluid transport

GB/T 14525 General specification for corrugated metal hose assemblies

GB/T 14976 Seamless stainless steel pipes for fluid transport

GB/T 16507.6 Water-tube boilers - Part 6: Inspection, testing and acceptance

GB 17820 Natural gas

3 Terms and definitions

The terms and definitions as defined in GB/T 8423.3 and GB/T 51156-2015, as well as the following terms and definitions, apply to this document.

3.1 Natural gas liquefaction plant

A site where gaseous natural gas is processed into liquefied natural gas.

Note: It generally includes production units, such as natural gas (raw gas) purification, natural gas fractionation, natural gas liquefaction (5.1.1), product storage and product loading (in ships or trucks).

3.2 Primary container

Containers, which are used to contain cryogenic liquids and in direct contact with cryogenic liquids.

3.3 Secondary container

Container, that is generally located outside the primary container and holds cryogenic liquid when it leaks. It is not in contact with cryogenic liquid, under normal operating conditions. [Source: GB/T 8423.3-2018, 5.2.25]

3.4 Membrane tank

A composite structure, that can store cryogenic liquids, as composed of a thin steel primary container (i.e., membrane), insulation layer, prestressed concrete tank. [Source: GB/T 8423.3-2018, 5.2.31]

4 Safety and environment

4.2 Environmental impact

4.2.2 Station emissions

During the design process, it shall formulate plans, to avoid and reduce emissions, which are caused by facility test run, operation, maintenance. It shall clarify the pollutant emissions and emission limits.

4.2.3 Emission control

The following emissions shall be controlled, under the premise of safety.

4.2.4 Flaring and venting

The design principle of the station is that there is no continuous discharge of flare gas or vent air to the flare or venting system, under normal operating conditions. Design reasonable measures, to ensure that the waste gas generated during normal operation is recovered as much as possible AND shall not be discharged to the flare or vent system.

4.2.5 Noise

Station design shall take measures, to control noise, to reduce the impact on people exposed to the station and the communities surrounding the station.

Noise control at the station shall meet the requirements of GB 12523 and GB 12348.

4.3 Security

4.3.3 Climate

Climate studies shall include.

4.3.4 Earthquakes

4.3.4.1 Earthquakes are divided into horizontal earthquakes and vertical earthquakes. Acceleration shall be described, according to GB 50011, as follows.

4.3.4.8 The return period for an SSE earthquake is 2475 a (50 a exceedance probability is 2%); the return period for an OBE earthquake is 475 a (50 a exceedance probability is 10%).

4.3.5 Location

4.3.5.1 During the feasibility study stage of the project, it shall finish the project site location evaluation, to ensure that the site selection plan is compatible with regional development. The evaluation shall include at least the following factors.

4.3.5.2 After site selection, a detailed site selection evaluation shall be conducted. The method and scope of site selection evaluation shall consider the total amount and scale of hazardous materials, in the proposed station and surrounding built and planned projects.

4.5 Safety design

4.5.1 Cryogenic equipment and piping design

For the pipes and equipment, the design pressures and temperatures shall cover all expected operating and abnormal conditions.

It shall include physical phenomena, such as possible liquid impact, cavitation, flash evaporation, two-phase flow.

5 Liquefaction device

5.1 Composition

Liquefaction devices usually refer to the process systems in natural gas liquefaction plants and LNG peak shaving stations, which consist of natural gas purification, liquefaction, LNG storage.

5.3 Natural gas liquefaction

5.3.1 LNG quality indicators shall comply with the provisions of GB/T 38753.

5.3.2 Denitrification facilities shall be set up, during the natural gas liquefaction process, according to the nitrogen component content in the raw gas and the requirements for LNG indicators in GB/T 38753.

5.3.3 The main heat exchanger of the liquefaction device can be a tube-wound heat exchanger or a plate-fin heat exchanger. It shall take anti-freezing and thawing measures, for equipment and pipelines that may be blocked due to freezing.

5.4 Storage

LNG storage shall comply with the provisions of Chapter 6.

Hydrocarbon refrigerants are generally stored at room temperature, whilst ethylene and liquid nitrogen shall be stored at low temperatures. Refrigerant storage shall comply with the provisions of 7.5 in GB 51261-2019.

6 Storage system

6.1 General requirements

The design and construction of vertical cylindrical flat bottom LNG storage tanks shall comply with the provisions of GB/T 26978 (all parts).

6.3 Design principles

6.3.2 Fluid sealing

6.3.2.1 The storage tank shall be well sealed, under normal operating conditions.

6.4 General design principles

6.4.1 The design of the storage tank structure shall be able to withstand the actions of load combinations, which are specified in GB/T 26978 (all parts), meanwhile meet the following requirements.

6.5 Foundations

6.5.1 The design of the foundation shall ensure that uneven settlement complies with the requirements of GB 51156-2015.

6.6 Field instruments

6.6.1 Overview

6.6.1.1 The instrument settings shall meet the requirements for safe and reliable commissioning, operation, production maintenance, shutdown of the storage tank. Instruments include at least the following.

7 Liquefied natural gas pump

7.1 General requirements

7.1.1 This Chapter specifies the minimum requirements for the design, manufacturing, installation, testing, operation, maintenance of LNG centrifugal pumps (hereinafter referred to as LNG pumps), as well as their drives and auxiliary equipment.

7.1.2 The design, installation, operation of LNG pumps in the station area shall meet the safety technical requirements of GB 51156-2015 and the safety requirements of 4.5.

7.3 Specific requirements

7.3.1 Each LNG pump shall be equipped with an independent valve, to facilitate isolation, draining, purging during pump maintenance.

7.3.2 LNG pumps operating in parallel shall be equipped with outlet check valves; meanwhile it shall take measures, to prevent water hammer on the check valves.

7.3.3 A minimum return valve shall be configured, to prevent the pump from operating at minimum continuous flow.

7.3.4 Pumps installed in LNG pump tanks and pump wells shall be equipped with exhaust pipelines or have exhaust functions.

7.4 Inspection and test

Inspections and tests shall be carried out, in accordance with Appendix E, to verify the operability of the pump, under all working conditions.

8 Gasification of liquefied natural gas

8.1 General requirements

8.1.1 Function

The function of the vaporizer is to gasify and heat LNG. The temperature of the heated natural gas shall be higher than the hydrocarbon dew point and not lower than 0 °C.

8.1.3 Natural gas circuit

8.1.3.1 At the outlet of the vaporizer, the pipe material shall be selected, based on the following conditions, considering the lowest temperature that may occur at the outlet of the vaporizer, depending on the following conditions.

8.1.5 Safety valve

8.1.5.1 The discharge capacity of the safety valves of open rack vaporizers, intermediate fluid vaporizers, immersed combustion vaporizers, ambient air vaporizers shall comply with the requirements of GB 51156-2015.

8.1.5.2 Any other type of vaporizer, that can be isolated (blocked), shall be equipped with at least one set of safety valves. The rated displacement of the safety valves shall be calculated, according to the following requirements.

8.1.6 Stability

The vaporizer shall operate stably and without vibration, within the operating range.

8.1.7 Performance data

The manufacturer shall specify the following performance values of the vaporizer.

8.2 Design conditions

8.2.1 Actions

The design of the vaporizer shall include the following actions.

8.3 Vaporizer

8.3.1 Performance parameters

The design of the LNG vaporizer shall be as specified in Table 3, providing parameters and ranges corresponding to different equipment types.

8.3.5.4 Vibration

The design shall prevent vibrations, which are caused by flue gases passing through the water bath, from damaging equipment components.

8.3.5.5 Winter antifreeze

It shall take Winter antifreeze measures.

8.3.5.6 Microbial prevention and control

Effective measures shall be taken, during water bath operation, to prevent the growth of microorganisms.

9 Piping layout

9.1 Piping system

9.1.1 Overview

The pipeline system of the LNG station includes.

9.1.3 Auxiliary process piping system

Auxiliary process piping systems include.

9.1.4 Public piping systems

9.1.4.1 Depending on the type of station, the main public piping systems include.

9.3.4 Before pressure test and water filling, the pipeline supports and hangers shall be installed and inspected to be qualified.

9.3.5 During pressure testing, the design of the system and boundary areas shall reduce the number of "golden mouths" (welds that cannot participate in the hydraulic pressure test).

9.3.6 After flushing and reinstalling the online instrument, when the system needs to be repressurized, the flange connection shall be checked for leaks, including the inspection of the "gold mouth".

9.4 Pipe components

9.4.1 General

9.4.1.1 The materials of LNG pipeline components shall comply with the provisions of 7.1 in GB/T 19204-2020 and GB/T 51257.It shall also comply with the following

9.5 Valves

9.5.1 Low-temperature valves shall comply with the requirements of GB/T 24925,

GB/T 51257, JB/T 12621.

9.5.2 Low temperature valves shall be able to operate normally, under frost conditions.

9.5.3 Under low temperature conditions, split valves should not be used.

9.5.4 Valves, which are installed on pipelines for low-temperature hydrocarbon media and toxic media, should be connected by butt welding. The internal parts of low- temperature welded valve shall meet online maintenance requirements.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 115 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB/T 22724

EditionTitleRevisionStatus
GB/T 22724-2022Installation and equipment for liquefied natural gas—Design of onshore installationscurrent editionCurrent
GB/T 22724-2008Installation and equipment for liquefied natural gas—Design of onshore installationsprevious editionSuperseded

This page sells the current edition, GB/T 22724-2022. Earlier editions are listed for reference only.

How to Download GB/T 22724-2022

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
115 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 22724-2022

$875.00