Valid

GB/T 19668.6-2019Information technology service-Surveillance-Part 6: Application system: Surveillance specification for the data center project (English PDF)

信息技术服务 监理 第6部分:应用系统:数据中心工程监理规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (19 pages)

Need quotation for your management?

Get a formal quotation for GB/T 19668.6-2019 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

August 30, 2019

Implementation date

March 1, 2020

Scope

GB/T 19668.6-2019 is the English-translated version of 信息技术服务 监理 第6部分:应用系统:数据中心工程监理规范.

GB/T 19668.6-2019 sets out how the construction of an application-oriented data centre is supervised in China. It specifies the supervision process and the related services stage by stage: the supervision activities and their content during tendering, during design, during implementation and during acceptance.

For the implementation stage it covers the hardware and software of the information system, the information resources, the personnel and the rules that go with them, and the records the supervisor keeps, while informative annexes give the work procedures for each stage and the inspection and acceptance record sheets.

It defines data centre, service level indicator, design and detailed design. Supervision of the computer room and of other infrastructure is outside it. Part 6 of GB/T 19668 and citing GB/T 19668.1-2014, it was issued on 30 August 2019 and has applied since 1 March 2020.

Found what you need?

Document preview — GB/T 19668.6-2019

National Standard of the People's Republic of China

ICS
35.020
Classification
L 01

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Abbreviations
  • 5 Data Center Engineering Supervision Process
  • 6 Data Center Engineering Bidding Stage Supervision Activities and Contents
  • 6.1 Data Center Engineering Bidding Stage Supervision Activities
  • 6.2 Supervision content of the tendering phase of the data center project
  • 7 Data Center Engineering Design Stage Supervision Activities and Contents
  • 7.1 Data Center Engineering Design Stage Supervision Activities
  • 7.2 Supervision content of the data center engineering design stage
  • 8 Data Center Engineering Implementation Stage Supervision Activities and Contents
  • 8.1 Data Center Engineering Implementation Stage Supervision Activities
  • 8.2 Data Center Engineering Information System Software and Hardware Supervision Content
  • 8.3 Supervision content of data center information resources (data)
  • 8.4 Supervision of data center personnel and related rules and regulations
  • 8.5 Contents of the supervision records of the supervisors during the data center implementation phase
  • 9 Data Center Engineering Acceptance Phase Supervision Activities and Contents
  • 9.1 Data Center Engineering Acceptance Phase Supervision Activity
  • 9.2 Supervision Contents of Data Center Engineering Acceptance Phase
  • Appendix A (informative) Procedures for supervision of data center engineering at all stages
  • A.1 Data Center Engineering Bidding Stage Supervision Work Procedure
  • A.2 Data Center Engineering Design Stage Supervision Work Procedures
  • A.3 Data Center Engineering Implementation Stage Supervision Work Procedures
  • A.4 Data Center Engineering Acceptance Phase Supervision Work Procedures
  • Appendix B (informative) Data Center Implementation Process Inspection Record Table
  • B.1 Data Center Information Network System Software and Hardware Inspection Record Table
  • B.2 Data Center Information Application System Software Check Record Table
  • B.3 Data Center Information Resources (Data) Check Record Table
  • B.4 Data Center personnel and corresponding regulatory system inspection records
  • Appendix C (informative) Data Center Engineering Acceptance Record Table
  • C.1 Data Center Engineering Acceptance Record Table
  • C.2 Data Center Engineering Acceptance Test Record Table
  • Reference

Foreword

GB/T 19668 "Information Technology Service Supervision" is divided into the following parts.

--- Part 1. General;

--- Part 2. Infrastructure engineering supervision specifications;

--- Part 3. Operation and maintenance supervision specifications;

--- Part 4. Information Security Supervision Specifications;

--- Part 5. Software Engineering Supervision Specifications;

--- Part 6. Application System. Data Center Engineering Supervision Specification;

--- Part 7. Supervisory workload measurement specifications. This part is the sixth part of GB/T 19668.

This part is drafted in accordance with the rules given in GB/T 1.1-2009.

1 Scope

This part of GB/T 19668 specifies the process and related services for data center engineering supervision in the application system. Computer field The supervision of the house and other infrastructure is not described in this section.

This section applies to the supervision services for the tendering, design, implementation and acceptance of data center construction projects for application systems.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this document. For undated references, the latest edition (including all amendments) applies to this document.

GB/T 19668.1-2014 Information technology service supervision Part 1: General

3 Terms and definitions

The following terms and definitions as defined in GB/T 19668.1-2014 apply to this document.

3.1 Data center

Supported by information technology, computer field (computer room), other infrastructure, information system hardware and software, information resources (data) and personnel And the corresponding rules and regulations to achieve centralized application processing and centralized data storage, providing data construction, exchange, integration, sharing The basic environment of information services.

Note 1: Rewrite GB/T 32910.1-2017, definition 2.1.

Note 2: The data center described in this section does not include the computer site (machine room) and other infrastructure in this definition.

3.2 Service level indicator

Parameters used to assess and measure the capabilities of the provider's information technology services. [SJ/T 11691-2017, definition 3.6]

3.3 Design

One is organized by the owner unit, and the data center design unit will detail the construction drawings that have passed the review to the contractor and the supervision unit.

Ming's technical activities help contractors and supervisors to correctly implement design intent, master the quality requirements of key engineering sites, and ensure engineering quality.

3.4 Detailed design

On the basis of the original design plan and drawings, the contractor shall, in light of the actual situation on the site, refine, supplement and improve the drawings to form the construction. The process of designing a document.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 19 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 19668.6-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
19 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 19668.6-2019

$295.00