Valid

GB/T 48023-2026Technical specifications for cold plate liquid cooling system of data center (English PDF)

数据中心冷板式液冷系统技术规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (20 pages)

Need quotation for your management?

Get a formal quotation for GB/T 48023-2026 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

July 30, 2026

Implementation date

February 1, 2027

Scope

GB/T 48023-2026 is the English-translated version of 数据中心冷板式液冷系统技术规范.

GB/T 48023-2026 is the Chinese standard "Technical specifications for cold plate liquid cooling system of data center". Its scope clause reads: This document outlines the system composition of a cold plate liquid cooling system for data centers, specifies the technical requirements, and describes the corresponding test methods.

This document does not apply to phase change plate liquid cooling systems. Its clauses include terms and definitions.

Found what you need?

Document preview — GB/T 48023-2026

National Standard of the People's Republic of China

ICS
35.020
Classification
L 60

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1.Scope
  • 2 Normative References
  • 3.Terms and Definitions
  • 4.Abbreviations
  • 5 System Composition
  • 6.Technical Requirements
  • 7.Test Methods
  • Appendix A (Normative) Requirements and Test Methods for Secondary Coolant
  • Appendix B (Normative) Installation, Pressure Holding, and Flushing of Secondary Side System

1 Scope

This document outlines the system composition of a cold plate liquid cooling system for data centers, specifies the technical requirements, and describes the corresponding test methods.

This document does not apply to phase change plate liquid cooling systems.

2 Normative references

The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.

For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.

This document.

GB/T 8446.2 Heat sinks for power semiconductor devices - Part 2.Methods for measuring thermal resistance and flow resistance

GB 50242 Code for Acceptance of Construction Quality of Building Water Supply, Drainage and Heating Engineering

GB 50243 Code for Acceptance of Construction Quality of Ventilation and Air Conditioning Engineering

GB 50462 Standard for Construction and Acceptance of Data Center Infrastructure

GB 50738 Construction Specification for Ventilation and Air Conditioning Engineering

3 Terms and Definitions

The following terms and definitions apply to this document.

3.1 datacenter

The computer facility (computer room), other infrastructure, information system hardware and software, information resources (data), personnel, and relevant regulations.

An entity composed of degrees.

[Source. GB/T 32910.1-2017, 2.1]

3.2 cold plate

3.3 coolant

The medium that absorbs and transfers heat in a liquid cooling system.

3.4

The heat from IT equipment components is transferred to a closed-loop coolant system via a cold plate, and then exchanged through one or more cooling circuits.

The system will eventually exhaust the heat to the outside.

3.5

The cooling system absorbs heat from IT equipment components by circulating coolant in a closed pipeline and exchanges heat with the primary cooling system.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 20 pages — is available in the English PDF.

How to Download GB/T 48023-2026

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
20 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 48023-2026

$360.00