Valid

GB/T 19068.3-2019Small wind turbines - Part 3: Wind tunnel test methods (English PDF)

小型风力发电机组 第3部分:风洞试验方法

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 19068.3-2019 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

August 30, 2019

Implementation date

March 1, 2020

Scope

GB/T 19068.3-2019 is the English-translated version of 小型风力发电机组 第3部分:风洞试验方法.

GB/T 19068.3-2019 is the Chinese standard "Small wind turbines - Part 3: Wind tunnel test methods". Its scope clause reads: This part of GB/T 19068 specifies the requirements for testing small wind turbines (hereinafter referred to as "units") in low-speed wind tunnels, and methods.

This section is applicable to small wind turbines with an output power of less than 10 kW. The identification and evaluation of other forms of wind energy conversion devices are also Can be used for reference. Its clauses include terms, definitions and symbols.

Found what you need?

Document preview — GB/T 19068.3-2019

National Standard of the People's Republic of China

ICS
27.180
Classification
F 11
Replacing
GB/T 19068.3-2003

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 terms, definitions and symbols
  • 4 Basic requirements
  • 5 Test procedure
  • 6 Test method
  • 7 Data collection and processing
  • 8 Test report format and content

1 Scope

This part of GB/T 19068 specifies the requirements for testing small wind turbines (hereinafter referred to as "units") in low-speed wind tunnels.

And methods.

This section is applicable to small wind turbines with an output power of less than 10 kW. The identification and evaluation of other forms of wind energy conversion devices are also

Can be used for reference.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.

Pieces. For undated references, the latest edition (including all amendments) applies to this document.

GB/T 17646 small wind turbine

3 terms, definitions and symbols

The terms, definitions and the following symbols defined in GB/T 17646 apply to this document.

CM. Wind wheel torque factor.

CM0. Wind wheel torque coefficient corrected without the amount of interference from the wall.

CP. Wind turbine utilization factor.

Cpi. The pressure coefficient corresponding to the i-th measuring point.

CP0. Wind turbine utilization factor corrected without the amount of interference from the tunnel wall.

CT. Wind wheel thrust coefficient.

CT0. Wind turbine thrust coefficient corrected without the amount of interference from the wall.

FL. Wind wheel tangential force, N.

FT. Wind wheel thrust, the axis of the wind wheel points backward, N.

I. Unit controller output current, A.

L. vertical distance between the tangential force line and the axis of the rotor, m.

LSS. distance between the center of the rotor and the geometric center of the cross section of the test section, m.

M. Wind wheel torque, N·m.

Ms. Wind wheel starting torque, N·m.

n. Wind wheel speed, r/min.

Pi. the pressure value corresponding to the i-th measuring point, Pa.

Pinfinity. test model far-away free air pressure static pressure, Pa.

P. Output power under standard atmospheric conditions at an altitude of 1000 m, W.

PN. Wind turbine mechanical output power under standard atmospheric conditions at an altitude of 1000 m, W.

Pt. static pressure test section of the wind tunnel test, Pa.

q. Speed test in the wind tunnel test section, Pa.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB/T 19068.3

EditionTitleRevisionStatus
GB/T 19068.3-2019Small wind turbines - Part 3: Wind tunnel test methodscurrent editionCurrent
GB/T 19068.3-2003Small wind turbines - Part 3: Wind tunnel test methodsprevious editionSuperseded

This page sells the current edition, GB/T 19068.3-2019. Earlier editions are listed for reference only.

How to Download GB/T 19068.3-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 19068.3-2019

$235.00