Valid

GB 26148-2010Safety specification for the use of manually operated high pressure waterjet equipment (English PDF)

高压水射流清洗作业安全规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (27 pages)

Need quotation for your management?

Get a formal quotation for GB 26148-2010 in 30 minutes.

Issued by

State Administration for Market Regulation, China National Standardization Administration

Level / Type

National · Mandatory

Issue date

May 30, 2025

Implementation date

December 1, 2025

Scope

GB 26148-2010 is the English-translated version of 高压水射流清洗作业安全规范.

GB 26148-2010 — This document specifies the composition and requirements of the operation team for high-pressure water jet cleaning operations, pre-operation preparation, operating procedures and equipment maintenance.

This document is applicable to high-pressure water jet cleaning operations with a pressure of not less than 10 MPa, and water jet mobile cutting and crushing operations. implement.

Found what you need?

Document preview — GB 26148-2010

National Standard of the People's Republic of China

ICS
23.100
Classification
J 70
Replacing
GB/T 26148-2010

Issued by: State Administration for Market Regulation, China National Standardization Administration

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Composition and requirements of the cleaning team
  • 4.1 Composition of the cleaning team
  • 4.2 Requirements for cleaning teams
  • 4.3 Training of cleaning teams
  • 4.4 Protection of the cleaning team
  • 4.5 Handling of emergencies during cleaning operations
  • 5 Preparation before work
  • 5.1 Make a plan
  • 5.2 Work Site
  • 5.3 Electrical Equipment
  • 5.4 Valve Control
  • 5.5 Device piping
  • 5.6 Working surface
  • 5.7 Entering the work site
  • 5.8 Safety pressure relief device
  • 5.9 Connector Protection
  • 5.10 Disabling of Mobile Devices
  • 5.11 High-pressure pump unit placement
  • 5.12 Wheel chocks
  • 5.13 Housekeeping
  • 5.14 Environmental Protection
  • 6 Operating procedures
  • 6.1 Normal Operation
  • 6.2 Improper Use
  • 6.3 Additional protection
  • 6.4 Voltage Boost Check
  • 6.5 Additives
  • 6.6 On Duty
  • 6.7 Line of sight
  • 6.8 Spray gun operation
  • 6.9 Flexible Spray Gun Operation
  • 6.10 Rigid Boom Gun Operation
  • 6.11 Container Inner Wall Cleaning
  • 6.12 Inspection contents after cleaning operation
  • 7 Equipment Maintenance
  • 7.1 Equipment Maintenance
  • 7.2 Maintenance Procedures
  • 7.3 Power Equipment
  • 7.4 Pumps
  • 7.5 Water inlet end
  • 7.6 Hose assembly
  • 7.7 Nozzle
  • 7.8 Valve
  • 7.9 Electrical Equipment
  • 7.10 Trailer
  • 7.11 Special tools
  • 7.12 Antifreeze Measures
  • Appendix A (Informative) Color coding for high pressure hose pressure levels
  • Appendix B (Informative) Safety protection equipment for high-pressure water jet cleaning operations
  • B.1 Head protection
  • B.2 Eye protection
  • B.3 Hearing protection
  • B.4 Body protection
  • B.5 Hand protection
  • B.6 Foot protection
  • B.7 Respiratory protection
  • Appendix C (Informative) Contents of the reminder card for medical treatment of water jet injuries
  • Appendix D (Informative) Safety Checklist before High-Pressure Water Jet Cleaning Operation

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting is required.

This document replaces GB/T 26148-2010 "Safety Specification for High-Pressure Water Jet Cleaning Operations". Compared with GB/T 26148-2010, in addition to structural adjustments and editorial changes, the main technical changes are as follows.

a) The scope of application of the standard has been changed (see Chapter 1, Chapter 1 of the 2016 edition);

b) Deleted "water jet", "low-pressure water jet", "high-pressure water jet", "ultra-high-pressure water jet", "abrasive jet", "sprinkler", and "rotating sprinkler" "Forced rotating nozzle", "two-dimensional rotating nozzle", "three-dimensional rotating nozzle", "plane cleaner", "self-feeding nozzle", "pressure regulating valve", "foot control "Control valve" and "Multi-valve", add the terms and definitions of "hose safety sheath" and "anti-drop device" (see Chapter 3, 2020 Edition) Chapter 3);

c) The specific requirements for hoses have been changed (see 4.3.9, 4.2.8 of the 2016 edition);

d) "Proficiency" has been added (see 4.3.14);

e) Added "Cleaning operations for corrosive and other harmful substances" (see 5.1.2);

f) Added "determine the operating conditions" (see 5.1.3);

g) Added "lockout/tagout" (see 5.1.5);

h) Added "Operations involving the release of gases, vapors and biological agents" (see 5.1.6);

i) Added "Hose condition" (see 5.5.4);

j) Added "flexible buckle" (see 5.5.5);

k) Added "working surface" (see 5.6);

l) Added "safety pressure relief device" (see 5.8);

m) Added "Disabling of mobile devices" (see 5.10);

n) Added "Placement of high-pressure pump unit" (see 5.11);

o) Added "wheel chock" (see 5.12);

p) Added "Housekeeping" (see 5.13);

q) Added "environmental protection" (see 5.14);

r) Added "balanced spray gun" (see 6.1.10);

s) Added "additional protection" (see 6.3);

t) "Additives" is added (see 6.5);

u) added "line of sight" (see 6.7);

v) Added "pre-rinse" (see 6.9.4);

w) Added "anti-drop device" (see 6.9.6);

x) Added "Cleaning of U-tube heat exchangers" (see 6.9.10);

y) Added "Boom length" (see 6.10.2);

z) Added "Container inner wall cleaning" (see 6.11);

aa) Added "electrical equipment" (see 7.9).

1 Scope

This document specifies the composition and requirements of the operation team for high-pressure water jet cleaning operations, pre-operation preparation, operating procedures and equipment maintenance.

This document is applicable to high-pressure water jet cleaning operations with a pressure of not less than 10 MPa, and water jet mobile cutting and crushing operations.

implement.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document.

For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to this document.

GB 14866 General technical specification for eye and face protection GB/T 41513 Classification and terminology of spray equipment AQ 3018 General safety rules for hazardous chemical storage tank area operations AQ 3026 Safety Specifications for Equipment Maintenance Operations in Chemical Production Units HG 30010 Safety regulations for hot work in production areas HG 30011 Safety Specifications for Confined Space Operations in Production Areas HG 30013 Safety Specifications for Working at Heights in Production Areas

3 Terms and definitions

The terms and definitions defined in GB/T 41513 and the following apply to this document.

High pressure pump

The working pressure is between 10 MPa and 100 MPa. It is a pressure source device used to increase the water pressure and deliver the high-pressure water to the nozzle.

Note. High pressure pumps are often of positive displacement piston type to ensure a constant flow rate at a given pump speed.

spray gun

A handheld cleaning tool that controls high-pressure water through a nozzle to form a water jet.

Note 1.It consists of a control valve, a spray bar and a nozzle assembly (including one or more nozzles), and the spray gun locking mechanism is shown in Figure 1.

Note 2.The spray gun is usually connected to the pressure regulating valve at the discharge end of the high-pressure pump through a high-pressure hose assembly.

Note 3.Spray guns can be classified according to the type of control valve. if the system drops to normal pressure when the valve is closed and the high-pressure water is discharged to the atmosphere, it is a unloading type spray gun; if the valve when closed, high pressure water remains in the system, which is a shut-off type spray gun.

[Source. GB/T 41513-2022, 4.3.6, modified]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 27 pages — is available in the English PDF.

Referenced standards

How to Download GB 26148-2010

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
27 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB 26148-2010

$155.00