DL 5000-1994Technical Code for Designing Fossil Fuel Power Plants (English PDF)
DL 5000 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| DL 5000-1994 | Technical Code for Designing Fossil Fuel Power Plants | Obsolete |
DL 5000-1994 is obsolete. It has been replaced by DL 5000-2000. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for DL 5000-1994 in 30 minutes.
Level / Type
National · Mandatory
Scope
DL 5000-1994 (Technical Code for Designing Fossil Fuel Power Plants) is available as an English-translated PDF.
DL 5000-1994 is the Chinese industry standard "Technical Code for Designing Fossil Fuel Power Plants". It is obsolete: it has been replaced by DL 5000-2000.
Found what you need?
Document preview — DL 5000-1994
Contents
- Document data
1 Document data
Sector: Electricity & Power (industry standard).
Status: obsolete, replaced by DL 5000-2000.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
Cited by
How to Download DL 5000-1994
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL 5190.2-2019 — Technical specification for thermal power erection and construction. Part 2: Boiler unit
DL 5190.3-2019 — Technical specification for thermal power erection and construction. Part 3: Steam turbine generator unit
DL 5190.4-2019 — Technical specification for thermal power erection and construction - Part 4: Instrumentation and control
Secure payment via Stripe
Payments accepted
DL 5000-1994
$470.00