Valid

SN/T 3834.1-2014Technical requirements for the inspection of complete set electric power industry equipment for import and export - Part 1: Gas turbine power equipment (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (8 pages)

Need quotation for your management?

Get a formal quotation for SN/T 3834.1-2014 in 30 minutes.

Issued by

General Administration of Customs

Level / Type

National · Recommended

Issue date

January 13, 2014

Implementation date

August 1, 2014

Scope

SN/T 3834.1-2014 (Technical requirements for the inspection of complete set electric power industry equipment for import and export - Part 1: Gas turbine power equipment) is available as an English-translated PDF.

SN/T 3834.1-2014 - SN/T 3834 This section specifies the technical requirements for testing turbine power plant equipment import and export of electric power industry.

Test turbine power plant thermal power equipment in this section 3.1 Definitions applicable to import and export electricity industry.

Found what you need?

Document preview — SN/T 3834.1-2014

National Standard of the People's Republic of China

ICS
27.040
Classification
K54

Issued by: General Administration of Customs

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Technical Requirements
  • 4.1 General requirements

Foreword

SN/T 3834 "Importers and power industry equipment testing technical requirements" is divided into three parts.

--- Part 1. turbine power generation equipment;

--- Part 2. Gas generation equipment;

--- Part 3. hydroelectric equipment.

This section SN/T 3834 Part 1.

This section drafted in accordance with GB/T 1.1-2009 given rules.

This section proposed and managed by the National Certification and Accreditation Administration Committee.

This section is responsible for drafting unit. People's Republic of China Shanghai Entry-Exit Inspection and Quarantine Bureau, People's Republic of China Guangdong Entry-Exit Inspection and Quarantine Bureau, People's Republic of China Jiangsu CIQ.

1 Scope

SN/T 3834 This section specifies the technical requirements for testing turbine power plant equipment import and export of electric power industry.

Test turbine power plant thermal power equipment in this section 3.1 Definitions applicable to import and export electricity industry.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document.

GB 3836.1 explosive atmospheres - Part 1. General requirements for equipment GB 3836.14 Electrical apparatus for explosive gas atmospheres - Part 14. Classification of hazardous areas GB 4053.3-2009 fixed ladders and platforms - Safety requirements - Part 3. Industrial guardrails and steel platform GB 19517-2009 National Electrical Safety Equipment Technical Specifications Inspection of power plant boiler and pressure vessel DL647-2004 DL/T 1123-2009 thermal power production safety facilities Configuration DL5000-2000 power plant design technical regulations DL/T 5174-2003 Gas - steam combined cycle power plant design requirements SN/T 3700-2013 Equipment Import and Export Inspection General technical requirements

3 Terms and Definitions

SN/T 3700-2013 and defined the following terms and definitions apply to this document.

Turbine power plant turbine-generatorequipment After the industry, also known as steam turbine power generation equipment, it is the steam from the boiler to steam, followed by a series of annular configuration Nozzles and moving blades of the steam turbine rotor rotating heat into mechanical energy and then into electrical energy to drive the generator equipment.

Note. The main device comprising. a fuel delivery system, milling system, water supply systems, ventilation systems, boiler combustion systems, boiler steam - water system, steam turbine body hair Motor, control system and power output system, dust removal system (see Appendix A).

4 Technical Requirements

4.1 General requirements

It should comply with SN/T 3700-2013 4.1 requirements.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 8 pages — is available in the English PDF.

Referenced standards

How to Download SN/T 3834.1-2014

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
8 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

SN/T 3834.1-2014

$249.00