Search SY/T
500 SY/T standards in English, from SY/T 6311-2023 to SY/T 6600-2020, in code order.
- SY/T 6311-2023Technical requirements for high temperature and high pressure three-dimensional proportional physical simulation experiments of steam injection oil recovery$485.00
- SY/T 6312-1997Measurement of sandstone grain size and pore character -Method of image analysis$225.00
- SY/T 6313.1-1998The method of determining the oil-gas-water contact. The oil-gas and oil-water contact$225.00
- SY/T 6313.2-1998The method of determining the oil-gas-water contact. The gas-water contact$225.00
- SY/T 6314-1997Methodology for sedimentary facies discription. Nonmarine facies$225.00
- SY/T 6315-1997Displacement efficiency measurement method for heavy-oil reservoirs$515.00
- SY/T 6315-2006Relative permeability and displacement efficiency test under the condition of high temperature for heavy oil reservoir$285.00
- SY/T 6315-2017Relative permeability and displacement efficiency test under the condition of high temperature for heavy oil reservoir$495.00
- SY/T 6318-1997Labour qota for repair of oil and gas gathering and transferring equipments$640.00
- SY/T 6318-2010Labour quota for repair of oil and gas gathering and transferring equipment$345.00
- SY/T 6318-2024Labor quota for repair of oil and gas gathering and transportation equipment$545.00
- SY/T 6319-1997Protection against ignitions arising out of static, lightning, and stray currents$525.00
- SY/T 6319-2008Protection against ignitions arising out of static, lightning and stray currents$460.00
- SY/T 6319-2016Protection against ignitions arising out of static, lighting and stray currents$345.00
- SY/T 6320-2016Safety regulation of petroleum gathering and transportation in land oil and gas field$175.00
- SY/T 6320-2022Onshore oil and gas field oil and gas gathering and transportation safety regulations$120.00
- SY/T 6321-2016Safety regulation of offshore oil recovery and downhole operation$325.00
- SY/T 6321-2022Shallow Sea Oil Production and Downhole Operation Safety Regulations$240.00
- SY/T 6323-1997Calibration of neutron logging tool$225.00
- SY/T 6324-1997The management regulation for the instrument and automatic equipment of the oil and gas transportation pipeline$225.00
- SY/T 6325-1997The stipulation of technical management of electrical equipment for oil and gas pipelines$70.00
- SY/T 6325-2011Technical management regulation of electrical equipment for oil and gas pipelines$309.00
- SY/T 6325-2024Specification for the management of electrical equipment for oil and gas pipelines$255.00
- SY/T 6326-1997The method of measuring and evaluating of the loading capacity on rig derricks$245.00
- SY/T 6326-2008The method of measurement and evaluation for the loading capacity on derricks and substructure of the drilling rig and working rig$135.00
- SY/T 6326-2019Inspection and evaluation methods and classification specifications for the bearing capacity of oil rigs and workover derricks$314.00
- SY/T 6327-1997Oil field drilling and production equipment--Method of type designation$325.00
- SY/T 6327-2005Oil field drilling and production equipment-method of type designation$639.00
- SY/T 6330-1997Information code of oil and gas line-trapping and transportation of oil field$315.00
- SY/T 6330-2012The specification for names of data in the oil and gas line-trapping and transportation of oil field$479.00
- SY/T 6331-1997Technical code for design of energy conservation for gas field surface engineering$325.00
- SY/T 6331-2007Technical specification for design of energy conservation for gas field surface engineering$205.00
- SY/T 6331-2013Technical specification for design of energy conservation for gas field surface engineering$225.00
- SY/T 6331-2024Technical specification for energy saving in gas field surface engineering design$255.00
- SY/T 6332-1997Bit trajectory control technology for horizontal well$245.00
- SY/T 6332-2004Directional well trajectory control$70.00
- SY/T 6332-2012Trajectory control for directional well$105.00
- SY/T 6332-2024Directional well trajectory control$105.00
- SY/T 6333-1997Horizontal drilling technology and its quality control requirements$225.00
- SY/T 6334-1997Standards to acidizing design and treatment evaluation for oil well and water well$85.00
- SY/T 6334-2013Acidizing designment, treatment and evaluation for production well and water injection well$255.00
- SY/T 6334-2024Specification for design, construction and evaluation of oil and water well acidification$405.00
- SY/T 6335-1997Evaluation procedure of drilling fluids shale inhibitor$264.00
- SY/T 6336-1997The method of separation and examination of heavily minarals for sedimentary rock$135.00
- SY/T 6336-2019Sedimentary rock heavy mineral separation and identification method$264.00
- SY/T 6337-1997The standard of well testing data acquisition$105.00
- SY/T 6337-2006The standard of well testing data acquisition$240.00
- SY/T 6338-1997Analysis of family composition of rock extract and crude oil by tlc-fid$225.00
- SY/T 6339-1998Unsteady-state oil-gas relative permeability measurement$225.00
- SY/T 6340-1998Recommended practice on static electricity in petroleum industry$510.00
- SY/T 6340-2010Recommended practice on static electricity$345.00
- SY/T 6344-1998Flammable and combustible liquids code$1,055.00
- SY/T 6344-2010Flammable and combustible liquids code$1,520.00
- SY/T 6344-2017Fire code for flammable and combustible liquids$2,900.00
- SY/T 6345-2016The safety qualification for the personnel of offshore petroleum operations$95.00
- SY/T 6345-2022Safety qualifications for offshore oil operators$70.00
- SY/T 6346-2016The safety provisions for towing and mooring of mobile platforms in shallow sea$225.00
- SY/T 6346-2022Safety specification for towing and mooring of shallow sea mobile platform$180.00
- SY/T 6347-1998Vibration absorber for drilling string$105.00
- SY/T 6347-2008Shock absorber for drilling string$120.00
- SY/T 6347-2022Oil and gas drilling equipment Drill string shock absorber and hydraulic thruster$210.00
- SY/T 6348-2019Safety regulations for onshore oil and gas logging operations$354.00
- SY/T 6349-2019Safety management specification of petroleum geophysical seismic team$444.00
- SY/T 6351-1998Laboratory measurement of acoustic properties on rock$85.00
- SY/T 6351-2012Specification for measurement of rock acoustic properties in laboratory$324.00
- SY/T 6352-1998Laboratory measurement of electrochemistry on rock$135.00
- SY/T 6352-2013Specification for measurement of rock electrochemistry in laboratory$499.00
- SY/T 6353-2016Safety management code for oil and gas field power transformer substation$155.00
- SY/T 6353-2022Oil and gas field substation (station) safety management regulations$120.00
- SY/T 6354-2016Safety technology rules for steam injection producing heavy oil$175.00
- SY/T 6354-2022Safety Technical Regulations for Steam Injection Thermal Exploitation of Heavy Oil$90.00
- SY/T 6355-2017Oil and gas production dedicated for safety signs$495.00
- SY/T 6355-2025Safety mark for oil and gas production$515.00
- SY/T 6356-1998The storage and handling of liquefied petroleum gases$1,740.00
- SY/T 6358-1998Classification on intensity of physical work for petroleun fieldwork$105.00
- SY/T 6358-2008Classification on intensity of physical work for petroleum fieldwork$120.00
- SY/T 6360-2016Oilfield polymer flooding alkali surfactant mining safety procedures$115.00
- SY/T 6360-2022Oilfield injection polymer, lye, surfactant safety regulations$90.00
- SY/T 6361-1998Oil and gas production, water injection lease-Health, safety and environmental management systems guideline$225.00
- SY/T 6362-1998Health, safety and environmental management system guideline for oil and gas workover$225.00
- SY/T 6363-1998Technical requirement for transient well testing$225.00
- SY/T 6364-1998Description methods of fluid property and distribution of reservoir$225.00
- SY/T 6365-1998Methodology for the initial pressure and the hydrodynamic system in hydrocarbon reservoirs$225.00
- SY/T 6366-1998The main technical target of production for oil field development and itcalculated methods$365.00
- SY/T 6366-2005The technical indexes of oil production and relative calculation methods$274.00
- SY/T 6367-1998Procedures for inspection, maintenance, repair and remanufacture of drilling equipment$630.00
- SY/T 6367-2009Procedures for inspection, maintenance, repair and remanufacture of drilling equipment$435.00
- SY/T 6367-2020Oil and gas drilling equipment Inspection, maintenance, repair and remanufacturing of drilling equipment$420.00
- SY/T 6368-1998Detector on buried metal pipelines anti-corrosion coating faults$334.00
- SY/T 6371-1998General technical standard for geophone tester$90.00
- SY/T 6371-2012General technical specification for geophone tester$244.00
- SY/T 6372-1998Computerized production logging system$120.00
- SY/T 6372-2019CNC production logging surface instrument$284.00
- SY/T 6373-1998The economic operation specification of electric power supply and distribution system for oil and gas field$90.00
- SY/T 6373-2008The economic operation specification of electric power suply and distribution system for oil and gas field$90.00
- SY/T 6373-2016Economic operation specification of electrical power network for oil-gas field$189.00
- SY/T 6374-1998Economical operation for artificial lift system$85.00
- SY/T 6374-2008The economical operation specification for artificial lift system$85.00
- SY/T 6374-2016Economical operation specification for mechanical oil production system$209.00
- SY/T 6374-2023Oil and gas field production system economic operation specification Mechanical oil recovery system$195.00
- SY/T 6375-1998Technical guides for energy source comprehensive utilization in petroleum enterprise$120.00
- SY/T 6375-2008Technical guides for energy sources comprehensive utilization in petroleum enterprise$90.00
- SY/T 6375-2014Technical guides for energy resources comprehensive utilization in oil-gas field and transportation pipeline enterprise$199.00
- SY/T 6375-2024Technical Guidelines for Comprehensive Energy Utilization in Oil and Gas Fields and Oil and Gas Pipeline Enterprises$195.00
- SY/T 6376-1998General technical specifications of fracturing fluid$120.00
- SY/T 6377-1998The regulation of fish impression$105.00
- SY/T 6378-1998Technology method for fishing and tieback casing of oil and injection well$590.00
- SY/T 6378-2010Technology Method for Fishing and Tieback Casing of Oil and Injection Well$195.00
- SY/T 6378-2021Oil-water well retrieving and reconnecting technology$334.00
- SY/T 6379-1998Evaluation methods of the properties of the pranulated profile control agent$225.00
- SY/T 6380-1998The test methods of breaker properties for fracturing$90.00
- SY/T 6380-2008Test methods of breaker properties for fracturing$150.00
- SY/T 6380-2024Test method for performance of breakers for fracturing$255.00
- SY/T 6381-1998Heat test for heating furnace$165.00
- SY/T 6381-2008Heat determination for heating furnace$285.00
- SY/T 6381-2016Heat determination for heating furnace of petroleum industry$449.00
- SY/T 6381-2024Thermal measurement of heating furnaces used in petroleum industry$390.00
- SY/T 6382-1999Technical regulation for heatering equipments used in oil pipeline transportation$85.00
- SY/T 6382-2009Technical regulation for heating facilities used in oil pipeline$135.00
- SY/T 6382-2016Specification for heating equipments in oil pipelines$189.00
- SY/T 6382-2024Technical management specification for oil pipeline heating equipment$240.00
- SY/T 6383-1999The regulation of pigging for transmission natural gas pipeline$225.00
- SY/T 6384-1999Relative permeability measurement under the condition of high temperature for heavy oil reservoir$225.00
- SY/T 6385-1999The porosity and permeability measurement of core in net confining stress$120.00
- SY/T 6385-2016Porosity and permeability measurement under overburden pressure$245.00
- SY/T 6386-1999Technical specifications of high resolution seismic exploration data acquisition for land$225.00
- SY/T 6390-1999The checking items and technical specifications for G·DAPS-4 seismic data acquisition system$165.00
- SY/T 6391-1999SEG - D seismic tape format$435.00
- SY/T 6391-2014SEG D Rev3. 0 seismic data recording format$2,840.00
- SY/T 6392-1999Information code of oil field water injection$390.00
- SY/T 6392-2012The specification for names of data in the oil field water injection management$374.00
- SY/T 6393-1999Specification for energy saving in crude oil pipeline design$85.00
- SY/T 6393-2008Technical specification for energy conservation for oil transportation pipeline design$300.00
- SY/T 6393-2016Technical specification of energy conservation for oil transportation pipeline design$429.00
- SY/T 6393-2024Technical specification for energy saving in oil pipeline engineering design$390.00
- SY/T 6394-1999Dry-mixing operation method of oil well cement and additive (materials)$165.00
- SY/T 6395-1999Procedure for testing heavy brines$639.00
- SY/T 6396-1999Requirements for cluster drilling hole anticollision technology$205.00
- SY/T 6396-2009Requirements for wells anticollision technology$55.00
- SY/T 6396-2014Slot layout and anti-collision technical requirements of platform cluster well drilling$239.00
- SY/T 6397-1999Evaluation procedure of drilling fluid biocides$144.00
- SY/T 6400-1999Recommended practice for gas lift valve performance testing$470.00
- SY/T 6400-2021Methods of performance test for gas-lift valve$1,109.00
- SY/T 6401-1999Specification for gas lift down hole equipment$495.00
- SY/T 6401-2025Gas lift downhole equipment$500.00
- SY/T 6403-1999Analysis and identification for Chitinozoa$444.00
- SY/T 6404-1999Analytical method of metal elemennts in sediment rock by ICP-AES$105.00
- SY/T 6404-2018Analytical method for metal elements in rock by ICP-AES and ICP-MS$135.00
- SY/T 6405-1999Geologic design specifications for geophysical prospecting area$264.00
- SY/T 6408-1999Maintenace and use of drilling and well servicing structures$195.00
- SY/T 6408-2004Recommended practice for use and procedures for inspections, maintenance and repair of drilling and well servicing structures$650.00
- SY/T 6408-2012Recommended practice for use and procedures for inspection, maintenance and repair of drilling and well servicing structures$800.00
- SY/T 6408-2018Petroleum drilling and production equipment - Operation, inspection, maintenance, and repair of drilling and well servicing structures$650.00
- SY/T 6409-1999Main technical and economic indexs and calculating methods on materials supply of oil enterprises$205.00
- SY/T 6409-2009Main technical and economic indexes and calculating methods on materials supply of petroleum enterprises$240.00
- SY/T 6410-1999The production well profile logging tools calibrations$225.00
- SY/T 6411-1999General requirements of detonating cord for oil and gas well$85.00
- SY/T 6411-2014General requirements of detonating cord for oil and gas well$345.00
- SY/T 6411.1-2008General requirements and testing method of detonating cord for oil and gas well. Part 1: General requirements$240.00
- SY/T 6411.2-2008General requirements and testing method of detonating cord for oil and gas well. Part 1: Testing method$240.00
- SY/T 6412-1999Technological procedure for tubing conveyed perforating$225.00
- SY/T 6413-1999Computerized logging system data collection roles$165.00
- SY/T 6414-1999Maceral analysis on polished surfaces of whole rocks$85.00
- SY/T 6414-2014Maceral identification and statistical methods on polished surfaces of whole rocks$395.00
- SY/T 6414-2025Method for identifying organic microstructures in whole rocks$450.00
- SY/T 6415-1999Geological logging quality qualification and filing for oil and gas exploratory wells$165.00
- SY/T 6415-2010Geological logging quality qualification and filling for oil and gas exploratory wells$85.00
- SY/T 6415-2020Specification for quality assessment of logging data for oil and gas wells$120.00
- SY/T 6416-1999Recommended practice for installation, maintenance, and operation of internal - combustion engines$360.00
- SY/T 6416-2014Recommended practice for installation, operation and maintenance of engine$399.00
- SY/T 6417-1999Performance properties of casing, tubing and drill pipe$545.00
- SY/T 6417-2009Performance properties of casing, tubing and drill pipe$1,250.00
- SY/T 6417-2016Performance propertises of casing, tubing and drill pipe$1,100.00
- SY/T 6419-1999Care and use of fiberglass tubulars$590.00
- SY/T 6419-2009Care and use of fiberglass tubulars$315.00
- SY/T 6419-2024Use and maintenance of fiberglass tube$420.00
- SY/T 6420-1999Technical specification for design of engrgy conservation for oil field surface engineering$240.00
- SY/T 6420-2008Technical specification for design of energy conservation for oil field surface engineering$150.00
- SY/T 6420-2016Technical specification of energy conservationfor oil field surface engineering design$210.00
- SY/T 6420-2024Technical specification for energy saving in oilfield surface engineering design$240.00
- SY/T 6422-1999The measuring for energy conservation effect of energy conservation products in petroleum enterprise$85.00
- SY/T 6422-2008The measuring for energy conservation effect of energy conservation products in petroleum enterprise$90.00
- SY/T 6422-2016Oil companies determined by the energy saving effect of energy-saving products$150.00
- SY/T 6422-2024Energy-saving effect measurement of energy-saving products used in petroleum enterprises$180.00
- SY/T 6423.1-1999Petroleum and natural gas industries. Non-destructive testing (NDT)methods of steel tubers for pressure purposes. Radiographic testing of the weld seam of submerged arc-welded steel tubes for the detection of imperfections$150.00
- SY/T 6423.1-2013Petroleum and natural gas industries. Non-destructive testing (NDT) methods of steel tubes. Part 1; Radiographic testing of weld seam of welded steel tubes for detection of imperfections$309.00
- SY/T 6423.2-1999Petroleum and natural gas industries. Non-destructive testing (NDT)methods of steel tubers for pressure purposes. Ultrasonic testing of the weld seam of elcctric resistance and induction welded steel tubes for the detection of longitudinal imp$90.00
- SY/T 6423.2-2013Petroleum and natural gas industries. Non-destructive testing (NDT) methods of steel tubes. Part 2: Automated ultrasonic testing of the weld seam of welded steel tubes for the detection of longitudinal and/or transverse imperfections$229.00
- SY/T 6423.3-1999Petroleum and natural gas industries. Non-destructive testing (NDT)methods of steel tubers for pressure purposes. Ultrasonic testing of the weld seam submerged arc-welded steel tubes for the detection of longitudinal and/or transverse imperfec$135.00
- SY/T 6423.3-2013Petroleum and natural gas industries. Non-destructive testing(NDT)methods of steel tubes. Part 3: Automated ultrasonic testing for the detection of laminar imperfections in strip/plate used for the manufacture of welded steel tubes$229.00
- SY/T 6423.4-1999Petreoleum and natural gas industries - Non - Destructive testing (NDT) methods of steel tubes for pressure purposes - Ultrasonic testing of the area adjacent to the weld seam oof wel$90.00
- SY/T 6423.4-2013Petroleum and natural gas industries. Non-destructive testing (NDT) methods of steel tubes. Part 4: Automated ultrasonic testing of seamless and welded steel tubes for the detection of laminar imperfections$229.00
- SY/T 6423.5-1999Petroleum and natural gas industries-Non-destructive testing (NDT)methods of steel tubers for pressure purposes. Ultrasonic testing of strips/plates used in the manufacture of welded tubes for the detection of laminar imperfections$75.00
- SY/T 6423.5-2014Petroleum and natural gas industries-Non-destructive testing (NDT) methods of steel tubes. Part 5: Digital radiographic testing of the weld seam of welded steel tubes for the detection of imperfections$359.00
- SY/T 6423.6-1999Petroleum and natural gas industries. Non-destructive testing (NDT)methods of steel tubers for pressure purposes. Ultrasonic testing of seamless and welded (expect submerged arc-welded) steel tubes for the detection of laminar imperfections$90.00
- SY/T 6423.6-2014Petroleum and natural gas industries-Non-destructive testing (NDT)methods of steel tubes. Part 6: Automated full peripheral flux leakage testing of seamless and welded (except submerged arc-welded) ferromagnetic steel tubes for the detection of longitudin$165.00
- SY/T 6423.7-1999Petroleum and natural gas industries. Non-destructive testing (NDT)methods of steel tubers for pressure purposes. Ultrasonic testing of the ends of seamless and welded steel tubes for the detection of laminar imperfections$70.00
- SY/T 6423.7-2017Petroleum and natural gas industries. Non-destructive testing (NDT)methods of steel tubes. Part 7: Magnetic particle inspection of seamless and welded ferromagnetic steel tubes for the detection of surface imperfections$145.00
- SY/T 6423.8-2017Petroleum and natural gas industries. Non-destructive testing (NDT) methods of steel tubes - Part 8: Automated full peripheral ultrasonic testing of seamless and welded (except submerged arc-welded)steel tubes for the detection of longitudinal and/or tran$185.00
- SY/T 6424-2000Analytical method of alkaline/surfactant/polymer flooding system$150.00
- SY/T 6424-2014Analytical method for alkaline/surfactant/polymer flooding system$279.00
- SY/T 6425-2000Technical requirements for compilation of adjusting development design for thermal recovery of heavy oil reservoir-steam huff and puff$240.00
- SY/T 6426-1999Specification for well control technology of driling$405.00
- SY/T 6427-1999Recommended practice for drill stem design and operating limits$225.00
- SY/T 6428-2011Safety rules for submerging, floating, jacking-up and lowering of offshore mobile platforms in shallow water$165.00
- SY/T 6428-2018The safety code for shallow sea mobile platform float up and down/jack up and down$165.00
- SY/T 6429-2017Fire code of offshore oil production facilities$185.00
- SY/T 6429-2025Fire protection specifications for offshore oil production facilities$255.00
- SY/T 6430-2017Safety regulation for petroleum crane vessel hoisting operations in shallow sea$145.00
- SY/T 6432-2019Shallow sea oil operation well control specification$314.00
- SY/T 6434-2000Analysis for natural gas reservoir fluids physical properties$240.00
- SY/T 6435-2000The method for measuring volatile oil properties$240.00
- SY/T 6436-2000Technical requirement for establishment of natural gas development plan$90.00
- SY/T 6436-2012Technical requirement for establishment of natural gas development plan$354.00
- SY/T 6438-2000Mudlogging data quality control procedure of hydrocarbon exploratoroy well$85.00
- SY/T 6438-2024Specification for quality control of mud logging data$180.00
- SY/T 6439-2000Management and preservation regulation of petroleum geology laboratory sample$150.00
- SY/T 6439-2017Regulations for the Administration of Samples of Petroleum Geology Laboratory$150.00
- SY/T 6441-2000The acceptance regulations of seismic data processing$240.00
- SY/T 6444-2018Safety code for petroleum engineering construction$750.00
- SY/T 6445-2000Terminology of imperfections in OCTG and line pipe$450.00
- SY/T 6445-2021Terminology of common defects in petroleum pipes$1,359.00
- SY/T 6446-2000Specification for making quality control targets for testing shaped chargs of well$40.00
- SY/T 6446-2013Quality testing targets of perforating charge for oil and gas well$274.00
- SY/T 6448-2000Quality specification for magnetic resonance imaging log information$240.00
- SY/T 6449-2000Calibration of detecting tool and evaluating method for cementing quality$180.00
- SY/T 6449-2024Calibration method of cementing quality tester$420.00
- SY/T 6450-2000Recommended practice for repair, testing and setting gas lift valves$225.00
- SY/T 6450-2012Recommended practice for repair, testing and setting gas lift valves$225.00
- SY/T 6450-2020Recommended practice for gas lift valve testing, adjustment and repair$335.00
- SY/T 6451-2000Specification for exploring well logging data processing and interpreting technology$240.00
- SY/T 6451-2010The technical specifications for exploring well logging data processing and interpreting$255.00
- SY/T 6451-2017Specification for logging data processing and interpreting of exploring well$285.00
- SY/T 6452-2000Core oil/water relative permeameter$304.00
- SY/T 6453-2000High temperature and high pressure fluid loss cell$264.00
- SY/T 6454-2000Computerized shooting and coring system$135.00
- SY/T 6454-2019CNC Perforating Coring Device$334.00
- SY/T 6455-2000Safety terms of petroleum industry by in-land$210.00
- SY/T 6455-2010Safety glossary of petroleum industry by in land$345.00
- SY/T 6459-2000Implementing a contractor safety and healty program$965.00
- SY/T 6459-2010Contractor and owner safety program implementation$345.00
- SY/T 6462-2000Polymer injection pump for oilfield$165.00
- SY/T 6462-2012Polymer Injection Pump for Oilfield$195.00
- SY/T 6462-2019Polymer injection pump for oil field$404.00
- SY/T 6463-2000Standard specification for gas production engineering design$165.00
- SY/T 6463-2012Specifications for gas production engineering project design$225.00
- SY/T 6463-2024Requirements for the design and preparation of gas production engineering schemes$375.00
- SY/T 6464-2000Technical requirements for horizontal completion technology$90.00
- SY/T 6464-2010Technical requirements for horizontal well completion technology$135.00
- SY/T 6464-2016Horizontal well completion technology requirements$125.00
- SY/T 6465-2000Evaluation methods for foaming agent of drainaging gas recovery$404.00
- SY/T 6466-2000Evaluation procedure for high temperature property of set oilwell cement$165.00
- SY/T 6466-2016Performance Test Methods for Oil Well Cement Paste$175.00
- SY/T 6467-2000Requirement of trajectory control technology for directional wells$240.00
- SY/T 6468-2000Maintenance and inspection for electronic multi-shot survey system$240.00
- SY/T 6469-2000Crude pipeline technical code for practice of transportation with pour point depressants$240.00
- SY/T 6470-2000Code for operation maintenance repair of general purpose valve in oil and gas pipeline$195.00
- SY/T 6470-2011Regulation for operation maintenance repair of general purpose valve in oil and gas pipeline$329.00
- SY/T 6471-2000Maintenance and inspection of measurement while drilling service$240.00
- SY/T 6472-2000Method of stipulation of principal energy consumption norm for production of oil field$120.00
- SY/T 6472-2010Method of stipulation of principal energy consumption norm for production of oil field$135.00
- SY/T 6473-2000Economic evaluating methods for a petroleum enterpriseenergy-saving technical innovation project$150.00
- SY/T 6473-2009Economic evaluting methods for petroleum enterprises energy-saving technical innovation project$165.00
- SY/T 6473-2024Economic Benefit Evaluation Method for Energy-saving Technology Projects in Petroleum Enterprises$210.00
- SY/T 6475-2000Dimensions and masses per unit length of steel pipe for petroleum and natural gas$334.00
- SY/T 6476-2000Drop-weight tear tests of steel pipe$325.00
- SY/T 6476-2007Practice for drop-weight tear tests on steel line pipe$165.00
- SY/T 6476-2013Practice for drop-weight tear tests on steel line pipe$135.00
- SY/T 6476-2017Practice for drop-weight tear tests on line pipe$265.00
- SY/T 6477-2000The evaluation method of remaining strength of the oil and gas transmission pipeline with the flaw Part 1: The volumetric type flaw$360.00
- SY/T 6477-2014Evaluation methods of remaining strength for oil and gas transmission pipeline with flaws$2,345.00
- SY/T 6477-2017Remaining strength evaluation for oil and gas pipeline with flaws$2,345.00
- SY/T 6477.2-2012The remaining strength assessment method of the oil and gas transmission pipeline with the flaw. Part 2: The crack-like flaws$345.00
- SY/T 6478-2000The technical conditions for nickel. phosphorus plating through autocatalytic process of tubings$40.00
- SY/T 6478-2017Tubing and casing surface coating technical conditions$150.00
- SY/T 6479-200024-bit high accuracy telemetry seismic instrument$240.00
- SY/T 6480-2000Geophone. Part 2: Three-component geophone$240.00
- SY/T 6481-2000Pressure-volume-temperature (PVT) cell$304.00
- SY/T 6482-2000Data transmission cable tester$90.00
- SY/T 6482-2019Digital Transmission Cable Tester$244.00
- SY/T 6483-2000Computerized logging system data record format$830.00
- SY/T 6483-2009Technical specification of computerized logging system data recording format$240.00
- SY/T 6484-2000Recommended practice for operation, maintenance, and trouble-shooting of gas lift installations$720.00
- SY/T 6484-2005Recommended practice for operations, maintenance, and trouble-shooting of gas lift installations$960.00
- SY/T 6484-2013Recommended practices for operation, maintenance, surveillance and troubleshooting of gas-lift Installations$1,669.00
- SY/T 6485-2000Specification for oil production engineering project in polymer flooding$165.00
- SY/T 6485-2017Specification for oil production engineering design in polymer flooding$285.00
- SY/T 6486-2000Recommended opertional method for preventing of clay-swelling and fine-migration in acidizing of water injection well$255.00
- SY/T 6486-2017Process specification of antiswelling and preventing fine-migration in acid treatment of injection wells$95.00
- SY/T 6487-2000Recommended practices for liquid CO2 huff and puff$305.00
- SY/T 6487-2018Recommended practice for liquid carbon dioxide huff and puff$285.00
- SY/T 6488-2000Specification for electric/sonic image processing and interpretation$240.00
- SY/T 6488-2019Specification for interpretation and processing of electrical and acoustic imaging logging data$334.00
- SY/T 6489-2000Specification for horizontal well log processing and interpretation$120.00
- SY/T 6489-2020Specification for processing and interpretation of horizontal well logging data$225.00
- SY/T 6490-2000Specification for core NMR parametermeasurement in laboratory$325.00
- SY/T 6490-2007Specification for normalization measurement of core NMR parameter in laboratory$210.00
- SY/T 6490-2014Specification for measurement of rock NMR parameter in laboratory$379.00
- SY/T 6490-2023Specifications for Laboratory Measurement of NMR Parameters of Rock Samples$545.00
- SY/T 6491-2000Evaluation and perforating test for oil formation casing in model well$55.00
- SY/T 6491-2011Evaluation and perforating test for oil formation casing in model well$165.00
- SY/T 6492-2000Specification for acoustic logging calibration device$85.00
- SY/T 6492-2020Technical Specifications for Verification of Sonic Logging Tool$105.00
- SY/T 6493-2000Specification for value transfer in nuclear well logging tools$334.00
- SY/T 6498-2000Operation rules of electronic multi-shots service$240.00
- SY/T 6499-2000Inspection of pressure. relieving devices$510.00
- SY/T 6499-2010Inspection of pressure-relieving devices$840.00
- SY/T 6499-2017Inspection of pressure-relieving devices$710.00
- SY/T 6502-2010Safety management regulations for escape and life-saving equipment of petroleum installations in shallow water and tidal flat areas$165.00
- SY/T 6502-2017The safety management rules for escape and lifesaving of offshore petroleum installations$135.00
- SY/T 6502-2024Safety regulations for escape and rescue of mobile offshore platforms$165.00
- SY/T 6503-2016Safety specification of combustible gas detection and alarm system for petroleum and natural gas engineering$345.00
- SY/T 6503-2022Safety specification for combustible gas and toxic gas detection and alarm system in petroleum and natural gas engineering$330.00
- SY/T 6504-2010Safety regulations for hydrogen sulphide protection in offshore petroleum operations$345.00
- SY/T 6505-2010Regulations for painting of offshore petroleum installations in shallow water$120.00
- SY/T 6505-2017The provisions for outside surface color in beach-shallow sea facilities$145.00
- SY/T 6505-2024Regulations on the coloring of shallow-water fixed petroleum facilities$120.00
- SY/T 6507-2000Pressure vessel inspection code: maintenance inspection, rating, repair, and alteration$345.00
- SY/T 6507-2010Pressure vessel inspection code. In-service inspection, rating, repair, and alteration$560.00
- SY/T 6507-2017Pressure vessel inspection code. In-service inspection��rating��repair��and alteration$710.00
- SY/T 6508-2000Nondestructive testing method for OCTG Liquid penetrant flaw detection for nonferrous magnetic thread$240.00
- SY/T 6509-2000Kellys$195.00
- SY/T 6509-2012Kellys$249.00
- SY/T 6509-2023Kelly$225.00
- SY/T 6510-2000Technical requirement for steam injection development project design of heavy oil reservoir$105.00
- SY/T 6510-2014Design requirement for steam injection development project of heavy oil reservoir$199.00
- SY/T 6511-2000Economic evaluating methods for oil field development project$270.00
- SY/T 6511-2008Economic evaluating technical requirement for oil field development project and adjustment project$225.00
- SY/T 6511-2022Technical specifications for economic evaluation of oilfield development plan and adjustment plan$390.00
- SY/T 6512-2000Technical requirement of drawing up a feasible EOR project chemical flooding$85.00
- SY/T 6512-2018Technical specification for the preparation of the tertiary oil recovery feasibility plan$165.00
- SY/T 6513-2001Recommended practice for development of a safety and environmental management program for outer continental shelf operations facilities$255.00
- SY/T 6513-2010Recommended practice for development of a safety and environmental management program for offshore operations and facilities$345.00
- SY/T 6514-2001Preparing tank bottoms for hot work$85.00
- SY/T 6514-2010Preparing tank bottoms for hot work$345.00
- SY/T 6515-2001Ignition risk of hydrocarbon vapors by hot surfaces in the open air$55.00
- SY/T 6515-2010Ignition risk of hydrocarbon liquids and vapors by hot surfaces in the open air$209.00
- SY/T 6517-2001Overfill protection for storage tanks in petroleum facilities$390.00
- SY/T 6517-2010Overfill protection for stroage tanks in petroleum facilities$345.00
- SY/T 6518-2001Recommended practice for guarding of pumping units$210.00
- SY/T 6518-2012Recommended practice for guarding of pumping units$499.00
- SY/T 6519-2001Classification of gases, vapors and dusts for electrical, equipment in hazardous (classified) locations$330.00
- SY/T 6519-2010Classification of flammable liquids, gases, or vapors and of hazardous locations for electrical installations$930.00
- SY/T 6519-2017Classification of flammable liquids, gases, or vapors and of hazardous locations for electrical installations in chemical areas$800.00
- SY/T 6520-2001Test method for dehydration of crude oil by autoclave$85.00
- SY/T 6520-2014Test method for dehydration of crude oil by autoclave$149.00
- SY/T 6524-2002Oil industry busywork concourse labouring safety artical for use equip request$40.00
- SY/T 6524-2010Oil industry busywork concourse labouring safety article for use equip request$169.00
- SY/T 6524-2017Specification for petroleum and natural gas operation personal protective equipment equip$145.00
- SY/T 6524-2025Standards for the Provision of Personal Protective Equipment in Oil and Gas Workplaces$390.00
- SY/T 6525-2002Recommended practice for water drainage and gas production by foaming method$165.00
- SY/T 6525-2017Recommended practice for water drainage and gas production by foaming method$225.00
- SY/T 6526-2002Measuring method of dynamic reaction rate for hydrochloric acid with carbonate rock$135.00
- SY/T 6526-2019Method for measuring dynamic reaction rate of hydrochloric acid and carbonate rock$264.00
- SY/T 6527-2002Quality criterion for resistivity and acoustics imaging log information$240.00
- SY/T 6528-2002Test method of the rock dielectric constant$240.00
- SY/T 6529-2002Specification for permanent type fire - fighting system operation of crude oil storage$90.00
- SY/T 6529-2010Specification for permanent type fire-fighting system operation of crude oil storage$345.00
- SY/T 6530-2002Internal coating of line pipe for non - corrosive transmission service$240.00
- SY/T 6530-2010Internal coating of line pipe for non-corrosive gas transmission service$345.00
- SY/T 6530-2019Inner coating of pipeline for non-corrosive gas transportation$424.00
- SY/T 6531-2002Longitudinal electric resistance welded steel pipes for pump barrel$85.00
- SY/T 6532-2002The calibration method for induced polarization instrument$240.00
- SY/T 6533-2002Testing and interpretation method for systematic well testing$240.00
- SY/T 6535-2002The underground storage well for high-compression gas$105.00
- SY/T 6536-2002Specification of cathodic protection of internal submerged surfaces of steel water storage tanks$255.00
- SY/T 6536-2012Specification for cathodic protection of internal submerged surfaces of steel water storage tanks$590.00
- SY/T 6536-2020Technical Specification for Cathodic Protection of Steel Tanks and Vessel Inner Walls$800.00
- SY/T 6537-2002Analysis methods of gas and solution for natural gas treating plant$285.00
- SY/T 6537-2016Analysis methods of gas and solution for natural gas treating plant$800.00
- SY/T 6538-2002Formulated selective desulfurization solvent$135.00
- SY/T 6538-2016Formulated selective desulfurization solvent$145.00
- SY/T 6539-2002The checking items and technical specifications for BOX seismic data acquisition system$240.00
- SY/T 6540-2002Lab testing method of drilling and completion fluids damaging oil formation$210.00
- SY/T 6540-2021Indoor Evaluation Method of Drilling Fluid Completion Fluid Damaged Reservoir$494.00
- SY/T 6541-2003Environmental test and reliability for geophysical exploration instrument$240.00
- SY/T 6543-2019Technical specification for underbalanced drilling$619.00
- SY/T 6543.1-2003Specification for underbalanced drilling technology - Part 1: Methods for design$405.00
- SY/T 6543.1-2008Technology specification for underbalanced drilling. Part 1: Liquid phase$240.00
- SY/T 6543.2-2003Specification for underbalanced drilling technology - Part 2: The outfit requirements of the wellhead pressure control and surface equipment$240.00
- SY/T 6543.2-2009Technology specification for underbalanced drilling. Part: Gas phase$240.00
- SY/T 6543.3-2005Specification for underbalanced drilling technology-Part 3: Specification for construction$240.00
- SY/T 6544-2003Property requirements for well cement slurries$255.00
- SY/T 6544-2010Performance requirements for oil well cement slurries$165.00
- SY/T 6544-2017Performance requirements for oil well cement slurries$185.00
- SY/T 6545-2003Specification for the quality control of oxygen activation logging$90.00
- SY/T 6545-2012Specification for calibration of the pulsed neutron logging tool$345.00
- SY/T 6546-2003Specification for well-logging data processing and interpretation for complicated lithological formation$150.00
- SY/T 6546-2011Specification of well-logging data processing and interpretation for complicated lithological formation$309.00
- SY/T 6546-2023Standards for processing and interpretation of logging data in complex lithological formations$300.00
- SY/T 6547-2003Specification for original logging of injection and production profile$240.00
- SY/T 6548-2003Specification for use and maintenance of loaded cable and bridle in oil field$165.00
- SY/T 6548-2011The use and maintenance of petroleum well-logging cable and bridle$229.00
- SY/T 6548-2018Technical specifications on the application of petroleum logging cable and bridle$295.00
- SY/T 6549-2003Operating regulation of perf-HEGF$105.00
- SY/T 6549-2016Technical specifications for perforating-HEGF operation$149.00
- SY/T 6550-2003The remastering of the seismic exploration data$150.00
- SY/T 6550-2016Specifications for remastering archive data of seismic exploration$269.00
- SY/T 6551-2003Safety technology rules for underbalanced drilling$240.00
- SY/T 6552-2003Recommended practice for inspection of pressure vessels in service for petroleum industry$455.00
- SY/T 6554-2003Procedures for welding or hot tapping on equipment in service$150.00
- SY/T 6554-2019Petroleum industry safety regulations for pressure drilling operations$404.00
- SY/T 6555-2003Cleaning mobile tanks in flammable or combustible liquid service$105.00
- SY/T 6555-2012Flammable or combustible liquids portable tank cleaning$345.00
- SY/T 6557-2003Guidelines for application of water spray systems for fire protection in the petroleum industry$135.00
- SY/T 6557-2011Guidelians for application of water spray systems for fire protection in the petroleum industry$345.00
- SY/T 6558-2003Specifications for design and manufacture of offshore anti-ice risers of oil, gas and injection wells$225.00
- SY/T 6558-2014Offshore oil drilling and production riser pipe$525.00
- SY/T 6558-2025Petroleum drilling and production equipment - Offshore drilling and production conductor$510.00
- SY/T 6560-2003Rules on electric safety operations of offshore oil facilities$90.00
- SY/T 6560-2011Electrical safety rules for offshore petroleum installations$335.00
- SY/T 6560-2018Standard on electric safety of offshore oil facilities$335.00
- SY/T 6561-2003Safety rules for extracting oil through pouring natural gas$70.00
- SY/T 6561-2011Safety technical rules for natural gas injection in oil and gas fields$165.00
- SY/T 6561-2018Safety specification of gas injection in oil&gas development$165.00
- SY/T 6562-2003The safety code of recovering light hydrocarbon$55.00
- SY/T 6562-2011Safety code for light hydrocarbon recovery$165.00
- SY/T 6562-2018The safety code of recovering light hydrocarbon$165.00
- SY/T 6563-2003Regulation for use and management of dangerous chemical reagent$240.00
- SY/T 6564-2003The safety rules for tying utensils during offshore petroleum operations$90.00
- SY/T 6564-2011Safety code for mooring operations in offshore petroleum operations$205.00
- SY/T 6564-2018The safety specification for tying-up utensils during offshore petroleum operations$205.00
- SY/T 6565-2003Technique requirements for CO2 injection in petroleum or water well safety$90.00
- SY/T 6565-2011Safety regulations for carbon dioxide injection in oil and gas fields$240.00
- SY/T 6565-2018Safety code for oil and gas field development carbon dioxide injection$135.00
- SY/T 6565-2025Safety Specifications for Carbon Dioxide Injection in Oil and Gas Development$240.00
- SY/T 6566-2003Hydraulic fracturing safety technique specification$240.00
- SY/T 6567-2003Code for energy saving and economical operation of natural gas transmission pipeline system$10.00
- SY/T 6567-2010Specification for economical operation of natural gas transmission pipeline system$165.00
- SY/T 6567-2016Code for economic operation of natural gas pipeline system$345.00
- SY/T 6569-2003Economical operation for water injection system of oil field$85.00
- SY/T 6569-2010The economical operation specification for water injection system of oil field$165.00
- SY/T 6569-2017Economical operation specification for oil&gas field production system. Water injection system$105.00
- SY/T 6570-2003Regulations drafted for the lift technology design of oil-wells$375.00
- SY/T 6570-2017Regulations drafted for the lift technology design of oil wells$470.00
- SY/T 6571-2003Evaluation methods for performance of ferric ion stabilizing agents in acidizing$85.00
- SY/T 6571-2012Evaluation method for performance of ferric ion stabilizing agents in acidizing$244.00
- SY/T 6572-2003Evaluation methods of resin performance for sand control$70.00
- SY/T 6573-2003Measurement method for minimum miscibility pressure by slim tube test$270.00
- SY/T 6573-2016Measurement methsd for minimum miscibility pressure by slim tube test$309.00
- SY/T 6574-2003Technical requirement of oil field development project upper evaluation$150.00
- SY/T 6574-2021Technical specifications for post-assessment of oilfield development capacity construction projects$424.00
- SY/T 6575-2003Technical regulation for EOR screening guide$105.00
- SY/T 6575-2016Technical regulation for oilfield EOR methods screening$209.00
- SY/T 6576-2003Recommended practices for evaluation of polymers used in enhanced oil recovery$950.00
- SY/T 6576-2016Evaluation methods for polymers used in enhanced oil recovery$1,100.00
- SY/T 6576-2024Evaluation Methods of Polymers for Enhanced Oil Recovery$455.00
- SY/T 6577.1-2003Transportation of line pipe. Part 1: Transportation on railroad$210.00
- SY/T 6577.1-2014Transportation of line pipe. Part 1: Transportation on railroad$159.00
- SY/T 6577.2-2003Transportation of line pipe. Part 2: Transportation on barges and vessels$165.00
- SY/T 6577.2-2014Transportation of line pipe. Part 2: Transportation on barges and vessels$159.00
- SY/T 6577.3-2014Transportation of line pipe. Part 3: Transportation on track$199.00
- SY/T 6578-2003Lab test method for the drag reduction performance of drag-reducing agent which applied in oil pipeline transportation$135.00
- SY/T 6578-2009Lab test method for the performance of drag reduction agents to be applied in oil pipeline$165.00
- SY/T 6578-2016Specification for adding drag reduction agent in oil pipelines$209.00
- SY/T 6579-2003The calibration method for density tool$240.00
- SY/T 6580-2004Quantities and units frequently used in oil and gas exploration and development$800.00
- SY/T 6581-2003The technique specification for high pressure well testing$85.00
- SY/T 6581-2012The technical code of practice for high pressure well testing$244.00
- SY/T 6582-2019Calibration specification for petroleum nuclear logging tools$919.00
- SY/T 6582.1-2003The calibration for petroleum nuclear logging tool. Part 1: General rules$240.00
- SY/T 6582.2-2003The calibration for petroleum nuclear logging tool. Part 2: The calibration for natural gamma-ray logging tool$240.00
- SY/T 6582.3-2003The calibration for petroleum nuclear logging tool. Part 3: The calibration for compensated density/litho-density tool$240.00
- SY/T 6582.4-2003The calibration for petroleum nuclear logging tool. Part 4: The calibration for compensated neutron tool$240.00
- SY/T 6583-2003Rules for working out the report of proved oil and gas reserves$590.00
- SY/T 6584-2003Mobile drilling rig$210.00
- SY/T 6585-2003Carbon fibre composite continuous sucker rod$85.00
- SY/T 6585-2013Continuous Sucker Rod$195.00
- SY/T 6585-2019Continuous sucker rod$334.00
- SY/T 6586-2003Site installation and inspection for drilling rigs$285.00
- SY/T 6586-2012Site installation and inspection for drilling rigs$345.00
- SY/T 6586-2014Site installation and inspection for drilling rigs$395.00
- SY/T 6586-2020Oil and gas drilling equipment, drilling rig site installation and inspection$485.00
- SY/T 6587-2003Calibration method for electronic inclinometer$120.00
- SY/T 6587-2012The calibration method for electronic inclinometer$105.00
- SY/T 6587-2021Calibration method of electronic deviation instrument$274.00
- SY/T 6588-2006Calibration methods for electric log tools$360.00
- SY/T 6588-2012Calibration methods for electric log tools$345.00
- SY/T 6589-2004Technical specification for long offset transient electromagnetic method$165.00
- SY/T 6589-2016Technical Specification for Exploration and Control of Electromagnetic Method for Land - Based Controllable Source$365.00
- SY/T 6589-2024Technical specification for onshore controlled source electromagnetic exploration and acquisition$435.00
- SY/T 6590-2004The checking items and technical specifications for IMAGE seismic data acquisition system$240.00
- SY/T 6591-2004Technical specification for pre-stack depth migration processing of seismic data$240.00
- SY/T 6592-2004Procedure for cement evaluation$435.00
- SY/T 6592-2016Cementing quality evaluation method$690.00
- SY/T 6592-2025Procedure for cementing quality evaluation$590.00
- SY/T 6593-2004The specification for nuclear magnetic resonance imaging logging tool calibration$135.00
- SY/T 6593-2016The specification for nuclera magnetic resonance imaging logging tool calibration$180.00
- SY/T 6594.1-2004Specification for operation and quality control of resistivity and acoustic imaging logging. Part 1: The calibration for logging tools$240.00
- SY/T 6595-2004The oilfield Business assessment of technical requirements$90.00
- SY/T 6595-2012Technical specification of commercial evaluation to oil field$224.00
- SY/T 6596-2004Recommended practice for produced-water reinjection in gas field$85.00
- SY/T 6596-2016The technical specification of produced-water injection in gas field$85.00
- SY/T 6597-2004Steel pipeline detection technology specification$85.00
- SY/T 6597-2014Specification of in-line inspection for oil and gas pipeline$560.00
- SY/T 6597-2018Specification for in-line inspection of oil & gas pipeline$900.00
- SY/T 6598-2004Recommended practice on application and testing of electric submersible pump seal chamber sections$345.00
- SY/T 6599-2004Recommended practice for electric submersible pump testing$150.00
- SY/T 6600-2004Load bearable detective cable$240.00
- SY/T 6600-2020Oil and gas drilling equipment Load-bearing detection cable$360.00