Search SY/T
500 SY/T standards in English, from SY/T 5701-1995 to SY/T 6009.1-2003, in code order.
- SY/T 5701-1995Liner cementing operation rules$225.00
- SY/T 5702-1995Iron-chromium lignosulfonate for drilling fluid$225.00
- SY/T 5703-1995Oil well logging information code$205.00
- SY/T 5703-2012Nomenclature specification of data items for petroleum well logging$274.00
- SY/T 5704-2004Dipmeter scale$120.00
- SY/T 5704-2012Specification for calibration of formation dipmeter logging tool$224.00
- SY/T 5704.1-1995Diplog instrument maintenance procedures and scale. 1016 Dipmeter$225.00
- SY/T 5704.2-1995Diplog instrument maintenance procedures and scale. HDT Dipmeter$225.00
- SY/T 5705-1995Database file formats for petroleum drilling engineering$1,700.00
- SY/T 5705-2012The specification for names of data in downhole operation$839.00
- SY/T 5706-1995Oil and gas reserves outcome data file format$750.00
- SY/T 5706-2012Specification values of data attributes for oil and gas reserves results$324.00
- SY/T 5707-1995Drilling pump infusion pump$225.00
- SY/T 5708-1995Oil and Gas Field Surface Engineering Construction and Management Information Code$1,800.00
- SY/T 5708-2012Standard names of data items for construction and management of oil-gas field(surface engineering)$1,279.00
- SY/T 5709-1995Heavy oil oil test specification and test data admission$225.00
- SY/T 5710-1995Wellhead test performance test$55.00
- SY/T 5710-2002Technology procedure for performance inspection of testing tools$120.00
- SY/T 5710-2016Technology procedure for performance inspection of well testing tools$209.00
- SY/T 5710-2024Technical specification for performance inspection of formation testing tools$285.00
- SY/T 5711-1995Methods for copper plating and phosphating of screwed brush for drilling tools$55.00
- SY/T 5711-2016The drilling tool thread copper plating and phosphating technical conditions$169.00
- SY/T 5712-1995Performance inspection of pressure-controlled testers$225.00
- SY/T 5713-1995Gas Engineering Information Code$510.00
- SY/T 5713-2012The specification for names of data in the gas production engineering$669.00
- SY/T 5715-1995General techncial conditions for pressure-bearing steel casting used for petroleum drilling mechanical products$135.00
- SY/T 5715-2016Carbon steel, alloy steel, stainless steel, and nickel base alloy castings for use in the petroleum and natural gas industry$390.00
- SY/T 5715-2022Carbon steel, alloy steel, stainless steel and nickel-based alloy castings for the oil and gas industry$240.00
- SY/T 5716.9-1995Oil rig overhaul technical conditions torque converter$225.00
- SY/T 5718-1995Write regulations exploratory oil test mining results report$300.00
- SY/T 5718-2004Writing specification of well testing report$240.00
- SY/T 5718-2016Specification for summary of well test and completion$495.00
- SY/T 5719-2006Safety prescription for gas liquids$90.00
- SY/T 5719-2017Safety specification for natural gas liquids$165.00
- SY/T 5719-2025Safety Specifications for Natural Gas Condensate$210.00
- SY/T 5722-1995General Technical Specifications for Continuous Inclinometer$304.00
- SY/T 5723-1995Mountain Earthquake Drill$90.00
- SY/T 5723-2010Portable Drilling Rig$229.00
- SY/T 5723-2021Oil and gas drilling equipment Mountain seismic drilling rig$294.00
- SY/T 5724-1995Casing string design$355.00
- SY/T 5724-2008Design of casing structure and strength$375.00
- SY/T 5724-2025Sleeve Column Structure and Strength Design$300.00
- SY/T 5725-1995Calcium Carbonate Superfine Powder for Drilling Fluid$240.00
- SY/T 5725-2025Ultra-fine Calcium Carbonate for Drilling and Completion Fluids$210.00
- SY/T 5726-2004Safety regulation for petroleum logging operation$105.00
- SY/T 5726-2011Safety specification for petroleum well logging operations$120.00
- SY/T 5726-2018Safety specification for petroleum logging operations$120.00
- SY/T 5727-2020Safety regulations for underground operations$285.00
- SY/T 5729-1995Heavy oil thermal recovery wells back to the wells operating procedures$55.00
- SY/T 5729-2012Heavy oil thermal-recovery well cementing operation procedure$304.00
- SY/T 5730-1995Conventional cementing procedures$225.00
- SY/T 5731-1995Camp column wellhead jacket hanging load calculation method$630.00
- SY/T 5731-2012Method for calculating the hanging load of casing strings$315.00
- SY/T 5731-2025Calculation and setting method for casing string hanging load at wellhead$300.00
- SY/T 5732-1995Locking finger-type pump off connector$105.00
- SY/T 5733-1995Injection wells eccentric water column stratification test deployment procedures$85.00
- SY/T 5733-2009Procedures of stratified flow rate testing and adjusting on injection wells with eccentric water tube$165.00
- SY/T 5733-2016Method of well completion and layered testing and adjustment for zonal injection wells$710.00
- SY/T 5734-1995Test Specification for Examining Seal of Under-well Packer for Separate Mining and Separate Injection Well$90.00
- SY/T 5734-2024Seal inspection and testing procedures for downhole packers in separate production and injection wells$210.00
- SY/T 5735-1995Geochemistry Evaluation Method for Land Facies Hydrocarbon Source Rock$315.00
- SY/T 5735-2019Hydrocarbon source rock geochemical evaluation method$194.00
- SY/T 5738-1995Oil equipment repair work quota$1,110.00
- SY/T 5738-2012Labor quota of oil production equipment repair$679.00
- SY/T 5739-1995Substation equipment maintenance work quota$1,510.00
- SY/T 5739-2012Labor quota of power transformer equipment maintenance$590.00
- SY/T 5739-2024Labor quota for maintenance of substation equipment$815.00
- SY/T 5740-1995Polymer flooding pilot test design requirements$285.00
- SY/T 5740-2013Technical requirements of polymer flooding development plan design and effect evaluation$484.00
- SY/T 5742-2019Oil and gas well control safety technology assessment management rules$264.00
- SY/T 5744-1995Specification for annular pressure testing of rod-pumped well$85.00
- SY/T 5744-2017The pressure testing procedures in the annulus of pumping wells$145.00
- SY/T 5745-1995Major terms of oil and gas production engineering$815.00
- SY/T 5745-2008Major terms of oil and gas production engineering$1,400.00
- SY/T 5745-2024Oil and Gas Production Engineering Terminology$300.00
- SY/T 5746-1995Submersible pump wells dynamic control chart preparation and method of use$245.00
- SY/T 5748-1995Rock gas breakthrough pressure measurement$85.00
- SY/T 5748-2013Determination method of gas breakthrough pressure in rock$105.00
- SY/T 5748-2020Rock gas breakthrough pressure measurement method$150.00
- SY/T 5749-1995Oil and gas gathering and transportation labor quota installation process engineering$560.00
- SY/T 5749-2004Labor quota for installation engineering of oil and gas gathering and transferring process$495.00
- SY/T 5749-2012Labor quota for installation engineering of oil and gas gathering and transferring process$710.00
- SY/T 5749-2018Labor quota for oil and gas field gathering and transportation process installation engineering$800.00
- SY/T 5750-1995Power line maintenance work quota$360.00
- SY/T 5750-2010Work quota for maintenance of power supply lines$495.00
- SY/T 5750-2016Power supply line maintenance labor quota$690.00
- SY/T 5751-1995Petroleum Geology Rock name and color code$365.00
- SY/T 5751-2002Codes for names and colors of rocks in the petroleum geology$495.00
- SY/T 5751-2012Codes for names and colors of rocks in the petroleum geology$1,029.00
- SY/T 5752-1996Codes of well information for oil and gas exploration$150.00
- SY/T 5752-2012Nomenclature specification of data items for petroleum logging$354.00
- SY/T 5753-1995Indoor evaluation of surfactant for measures taken for oil-well enhancement and water-well stimulation$105.00
- SY/T 5753-2016The performance evaluation method of surfactants for oil well acidizing and water well stimulation$169.00
- SY/T 5754-1995Performance evaluation method for mutual solvent for oil-field acidification$105.00
- SY/T 5754-2016Methods for evaluating performances of mutual solvent in acidizing$169.00
- SY/T 5755-1995Performance evaluation method for cleanup additive for fracture and acidificaiton$85.00
- SY/T 5755-2016The performance evaluation method of cleanup additive for fracturing and acidizing$169.00
- SY/T 5756-1995Sl-2 corrosion and scale inhibitor$164.00
- SY/T 5757-1995Oilfield water injection fungicide general technical conditions$165.00
- SY/T 5757-2010General specifications of bactericides for oilfield injecting water$149.00
- SY/T 5757-2024Technical specification for biocides for water injection treatment$135.00
- SY/T 5758-1995Drilling fluid lubricated ball$435.00
- SY/T 5758-2011Evaluating procedure for lubricating beads of drilling fluid$165.00
- SY/T 5758-2018Lubricating fluid lubricant$120.00
- SY/T 5759-1995Rules for name codes of petroleum-related computer network and its nodes as well as distribution of IP address$225.00
- SY/T 5760-1995Hash code compilation method$365.00
- SY/T 5760-2010Code of well compilation method$169.00
- SY/T 5764-1995Fracturing with guar gum and hydroxypropyl guar$205.00
- SY/T 5764-2007General technical specifications of natural plant gum for fracturing$135.00
- SY/T 5766-1995Fracturing with fenugreek gum$225.00
- SY/T 5767-1995Transporting crude oil pour point depressant general technical conditions$150.00
- SY/T 5767-2002Pour point depressant for pipelining crude oil$180.00
- SY/T 5767-2005Technical specification for practice of transporting crude oil treated with pour point depressants through pipeline$465.00
- SY/T 5767-2016Specification for pipelining crude oil treated with pour point depressants$329.00
- SY/T 5768-1995Technical specification for practice of transporting crude oil treated with pour point depressants through pipeline$120.00
- SY/T 5768-2006Welded steel pipe for normal structure purposes$105.00
- SY/T 5768-2016General structure with welded steel pipe$225.00
- SY/T 5769-1995Land seismic acquisition assistance data format$1,150.00
- SY/T 5769-2012Land seismic exploration ancillary data P1/90 format$495.00
- SY/T 5769-2019Geophysical exploration positioning data P1 / 11 exchange format$1,309.00
- SY/T 5771-1995Ground magnetic exploration technical regulations$255.00
- SY/T 5771-2004Technical specification for ground magnetic exploration$240.00
- SY/T 5772-1995Oil controlled source audio magnetotelluric sounding exploration technical regulations$515.00
- SY/T 5772-2002Technical rules of control source audio magnetotelluric exploration$135.00
- SY/T 5774-1995SN388 seismic data acquisition system test items and technical indicators$365.00
- SY/T 5774-2005Checking item and technical specification for SN388 seismic data acquisition system$240.00
- SY/T 5775-1995Technical specification for measuring seismic mountain$510.00
- SY/T 5775-2002The technical specification of surveys in the seismic prospecting for mountainous area$240.00
- SY/T 5776.1-1995Injection profile logging operations procedures. Injection Profile$225.00
- SY/T 5776.2-1995Injection profile logging operations procedures. Steam injection profile$225.00
- SY/T 5777-1995Analytic method for H-nuclear magnetic resonance (HNMR) and C-nuclear magnetic resonance (CNMR)$85.00
- SY/T 5777-2022NMR analysis method of oil and water in crude oil and rock$180.00
- SY/T 5778-1995Pyrolysis rock geochemical logging specification$70.00
- SY/T 5778-2008Specifications for logging of oil and gas wells by rock pyrolysis$150.00
- SY/T 5778-2025Rock pyrolysis logging method$240.00
- SY/T 5779-2008Analytical method of gas chromatography on saturated hydrocarbons of rock chloroform extract and crude oil$195.00
- SY/T 5779-2024Gas chromatography analysis of hydrocarbons in petroleum and sedimentary organic matter$240.00
- SY/T 5780-1993Downhole milling operation rules$225.00
- SY/T 5781-1993Metamorphic buried hill reservoir description$225.00
- SY/T 5782-1993Sand lens lithologic reservoir reserve calculation rules$150.00
- SY/T 5782-2010Instructions for estimation of proved reserves for lithologic oil and gas reservoir$429.00
- SY/T 5783-1993Production logging interpretation rules$205.00
- SY/T 5783-2002The standardized interpretation procedures of injection and production profile logging$240.00
- SY/T 5783.1-2012Specification for injection and production profile logging data processing and interpretation. Part 1: Vertical well$345.00
- SY/T 5783.2-2016Specification for injection and production profile logging data processing and interpretation. Part 2-Deviated well$345.00
- SY/T 5784-1993Calibration and calculation methods perforation depth horizons$225.00
- SY/T 5785-1993Petroleum Industry Information Classification and Coding Guidelines$85.00
- SY/T 5785-1999Directives for information classifying and coding of petroleum industry$165.00
- SY/T 5785-2007Directives for information classifying and coding of petroleum industry$225.00
- SY/T 5786-1993Specification for the provision of measuring instruments in material supply warehouses of petroleum enterprises$325.00
- SY/T 5787-1993Specification for the provision of measuring instruments in water supply and power supply enterprises of oil and gas fields$325.00
- SY/T 5788-2024Specification for geological logging of oil and gas wells$285.00
- SY/T 5788.2-1993Oil and gas drilling gas geological logging rules$105.00
- SY/T 5788.2-1997Gas logging specifications for oil and gas exploration well$105.00
- SY/T 5788.2-2008Gas logging specifications for oil & gas exploration well$85.00
- SY/T 5788.2-2018Specifications for gas logging of oil and gas exploration well$105.00
- SY/T 5788.3-1993Gas logging specifications for oil & gas exploration well$105.00
- SY/T 5788.3-1999Geological logging regulations for oil and gas exploration wells$195.00
- SY/T 5788.3-2008Specifications for geological logging of oil and gas wells$375.00
- SY/T 5788.3-2014Specifications for geological logging of oil and gas wells$345.00
- SY/T 5789-1993Induced flow wells operating procedures$225.00
- SY/T 5790-1993Explosion repair sleeve technology practice law$165.00
- SY/T 5791-1993Process of casing reformation and strengthening seal$90.00
- SY/T 5792-1993Oil (gas) wells, sidetracking operation rules of construction$165.00
- SY/T 5792-2003Technical demands on whisper operation and well completion$255.00
- SY/T 5792-2018Side drilling construction operation and completion technology requirements$684.00
- SY/T 5793-1993Mechanical recovery system efficiency testing and calculation methods$225.00
- SY/T 5794-1993Drilling Fluid sulfonated asphalt class evaluation method$205.00
- SY/T 5794-2010Evaluation method for asphalt products used in drilling fluids$229.00
- SY/T 5795-1993Beam pumping unit installation size, with the size of wearing parts$225.00
- SY/T 5796-1993Assessment method for flocculant$85.00
- SY/T 5796-2020Evaluation methods for flocculant used in oilfield$124.00
- SY/T 5797-1993Performance assessment method for oil-in-water emulsion breaker$85.00
- SY/T 5797-2025Performance evaluation method for demulsifiers of oil-in-water emulsions$90.00
- SY/T 5798-1993Evaluation method for crude oil paraffin inhibitors - Wax deposition tester method$325.00
- SY/T 5799-1993Profile control agent performance evaluation method of two-liquid method$225.00
- SY/T 5800-1993Regulations for acceptance of field data of petroleum magnetotelluric sounding$225.00
- SY/T 5801-1993Petroleum exploration gravity field data, acceptance$325.00
- SY/T 5801-1999Rules for check and acceptance to gravity and magnetic field date in petroleum prospecting$225.00
- SY/T 5803-1993Labour quotas for motor vehicle operation$325.00
- SY/T 5805-1996Transmission and distribution lines engineering installation labor quota$800.00
- SY/T 5805-2010Installation work ration for power transmission and distribution$580.00
- SY/T 5805-2025Labor quota for power transmission and distribution line installation projects$590.00
- SY/T 5806-2000Oil and gas stratigraphic code$285.00
- SY/T 5806-2012Oil and gas stratigraphic code$525.00
- SY/T 5806-2025Oil (gas) reservoir layer code$1,115.00
- SY/T 5807-1993A process of hydraulic piston pumps work well since under$470.00
- SY/T 5807-2012Technology method for hydraulic piston pump trip operation and test$404.00
- SY/T 5808-1993Code for assembly and testing of electric submersible pumps$325.00
- SY/T 5809-1993Specification for pressure measurement in electric submersible pump wells$325.00
- SY/T 5810-1993Continuous gas lift production wells design and construction work$270.00
- SY/T 5811-1993General Technical Specification for Silicate Series Plugging Agent$85.00
- SY/T 5811-2025General technical requirements for silicate series plugging agents$180.00
- SY/T 5812-1993Annulus testing wellheads$225.00
- SY/T 5813-1993Hydraulic piston pump well pump top manometry procedures$225.00
- SY/T 5814-1993Drilling with humic acid treatment agent effective determination of the content of humic$169.00
- SY/T 5814-2008Determination of the content of humic acid in drilling fluids additives containing the same$85.00
- SY/T 5815-1993Rock pore volume compressibility test methods$105.00
- SY/T 5815-2008Test method of rock pore volume compressibility$135.00
- SY/T 5815-2016Measurement method for rock pore volume compressibility$249.00
- SY/T 5818-1993Specification for soft fishing operations$325.00
- SY/T 5819-1993Gravity prospecting technical regulations$315.00
- SY/T 5819-2002Technical specification for ground gravity$315.00
- SY/T 5819-2010Technical Specification for Land Gravity Survey$500.00
- SY/T 5819-2016Technical specification for on - earth gravity magnetic prospecting$690.00
- SY/T 5819-2024Technical regulations for onshore gravity and magnetic exploration$575.00
- SY/T 5820-1993Technical specification oil magnetotelluric sounding method$355.00
- SY/T 5820-1999Technical specifications for magnetotelluric sounding$255.00
- SY/T 5820-2014Technical rule for magnetotelluric sounding acquistion method in oil exploration$395.00
- SY/T 5820-2020Technical Regulations for Natural Source Electromagnetic Collection$330.00
- SY/T 5821-1993Carbonate reservoir water shutoff technology practice organic blocking agent$405.00
- SY/T 5821-2012Water shutoff technology with organic plugging agent for carbonate reservoir$434.00
- SY/T 5821.1-1993Water shutoff operation methods for oil wells - Technique of water shutoff and profile control with sodium silicate-calcium chloride$325.00
- SY/T 5822-1993Classification and Denomination of Oilfield Chemicals$85.00
- SY/T 5822-2021Classification and naming conventions of oilfield chemicals$274.00
- SY/T 5823-1993Specification for provision of measuring instruments in petroleum engineering construction and installation enterprises$325.00
- SY/T 5825-1993Mechanical downhole temperature thermometer test$40.00
- SY/T 5825-2007Procedures of temperature test by a electronic down-hole thermometer$120.00
- SY/T 5826-1993Hydraulic piston pump maintenance procedures$309.00
- SY/T 5827-1993Stuck salvage craft practice$630.00
- SY/T 5827-2005Process of releasing and fishing$210.00
- SY/T 5828-1993Petroleum Geophysical surveying result Quality Inspection Rules$325.00
- SY/T 5828-1999The details of quality test for surveys result in petroleum geophysical exploration$225.00
- SY/T 5829-1993Naming rules for development well number of oil and gas field$85.00
- SY/T 5829-2016The recommended regulation for naming oil��gas development well$209.00
- SY/T 5830-1993Set layer volcanic reservoir description method$225.00
- SY/T 5832-1993Sucker rod centralizer$120.00
- SY/T 5832-2002Sucker rod centralizer$165.00
- SY/T 5833-1993Operating procedures for electric submersible pump wells$325.00
- SY/T 5834-1993Low solids control fluid performance measurement and evaluation methods$150.00
- SY/T 5834-2007Performance specifications and measuring methods of low-solid killing fluid$150.00
- SY/T 5834-2014Performance specifications and measuring methods of low-solid killing fluid$159.00
- SY/T 5835-1993Fracturing wellhead valve$285.00
- SY/T 5836-1993Design and construction practices in deep fracturing$225.00
- SY/T 5837-1993Equipment shuttle valve with pneumatic components of oil drilling test methods$225.00
- SY/T 5838-1993Oil (gas) field (hidden) reserves of technical and economic evaluation requirements$720.00
- SY/T 5838-2011Guidline for evaluation of land proved petroleum initial reserves$375.00
- SY/T 5839-1993Expansive formation tester operating procedures$225.00
- SY/T 5840-1993Drilling plugging material bridging laboratory test methods$169.00
- SY/T 5840-2007Recommended practice for laboratory testing of bridging materials for drilling fluids$105.00
- SY/T 5840-2024Indoor test method for bridging plugging materials for drilling fluids$240.00
- SY/T 5841-1993Drilling technical and economic indicators and calculation methods$135.00
- SY/T 5841-2005Drilling tech-economic indexes and calculation methods$195.00
- SY/T 5841-2011Drilling tech-economic indexes and calculation methods$195.00
- SY/T 5842-1993Sandstone oilfield development programming technology requires the development of geological reservoir engineering section$85.00
- SY/T 5842-2003Technical requirements of compiling the development plan of sandstone oil field development geology and reservoir engineering$105.00
- SY/T 5842-2023Technical requirements for preparation of integrated sandstone oilfield development plan. Development geological reservoir engineering part$165.00
- SY/T 5843-1993Determination of gas-water relative permeability (steady-state method)$225.00
- SY/T 5843-1997Gas-water relative permeability measurement$225.00
- SY/T 5844.1-1995Petroleum Geology experimental information code. Geochemistry section$550.00
- SY/T 5844.1-2012The specification for names of data in the petroleum geology experiments. Part 1: Geochemistry$739.00
- SY/T 5844.2-1995Petroleum Geology experimental information sedimentary ore code section$165.00
- SY/T 5844.2-2012The specification for names of data in the petroleum geology experiments. Part 2: The sedimentary rock mineral$839.00
- SY/T 5844.3-1993Information codes for petroleum geological experiments - Codes for palaeontological names$325.00
- SY/T 5846-1993Casing patch technology practice$475.00
- SY/T 5846-2011Recommended practice for casing patch process$225.00
- SY/T 5846-2020Casing subsidy process method$330.00
- SY/T 5847-1993Pumping wells dynamic control chart preparation and method of use$325.00
- SY/T 5847-2012The drawing and application method of dynamic control chart for rod-pumping well$304.00
- SY/T 5848-1993Sucker off prevention device$285.00
- SY/T 5849-1993Oil wells chemicals plugging Evaluation practice$85.00
- SY/T 5849-2002The method for economic effect evaluation of removing plugging by chemicals in production and injection well$105.00
- SY/T 5849-2018The evaluation method for removing plugging by chemicals in production and injection well$195.00
- SY/T 5850-1993Sulfonated asphalt (paste) for drilling fluids$325.00
- SY/T 5851-1993Sandstone oilfield water injection technology to be developed to adjust the programming technique$85.00
- SY/T 5851-2005Technical requirements for compilation of adjusting development design for oilfield$120.00
- SY/T 5851-2016Technical Requirements for Oilfield Development Adjustment Program$175.00
- SY/T 5852-1993Offshore gas well completion test specification$225.00
- SY/T 5854-2005The safety regulation of moist steam generator specially used in oilfield$165.00
- SY/T 5854-2019Safety Specification for Oil Field Special Wet Steam Generator$444.00
- SY/T 5856-2017Safety regulations charged for live working in oil and gas fields$265.00
- SY/T 5857-2006Management regulations of civil explosion equipments in the seismic operation of petroleum geophysical exploration$285.00
- SY/T 5857-2025Regulations for the Management of Civil Explosives in Petroleum Geophysical Seismic Operations$360.00
- SY/T 5859-1993Bridge plug setting tools$225.00
- SY/T 5859-1995Bridge plug packer tool$225.00
- SY/T 5862-1993Flooding acrylamide polymer performance measurement$120.00
- SY/T 5862-2008Technical criterions of polymer for oil displacement$225.00
- SY/T 5862-2020Technical requirements for polymers for oil displacement$550.00
- SY/T 5863-1993Submersible pump from under the operating methods$470.00
- SY/T 5863-2012The procedure for the ESP pulling out and installation$354.00
- SY/T 5864-1993Pumping wells dynamometer test$245.00
- SY/T 5865-1993Sandstone oilfield injection wells effect profile evaluation method$225.00
- SY/T 5866-1993Operating procedures for surface direct-reading well testing$325.00
- SY/T 5867-1993Oil and gas resource evaluation method Classification and Coding$590.00
- SY/T 5867-2012Coding for hte classified methodologies of petroleum resources assessment$225.00
- SY/T 5867-2024Classification and coding of oil and gas resource evaluation methods$480.00
- SY/T 5869-1993Flowing well downhole pressure test routine$225.00
- SY/T 5871-1993Throw hand drill packer$225.00
- SY/T 5872-1993Pump maintenance procedures$120.00
- SY/T 5873-2005Recommended practice for design and execution of sucker rod pumping system$1,430.00
- SY/T 5873-2017Practice for design and execution of sucker rod pumping system$3,635.00
- SY/T 5873.1-1993There rod pumping operations craft practice. Conventional pumping$225.00
- SY/T 5873.2-1994There rod pumping operations craft practice. Small pump deep drawing$225.00
- SY/T 5873.3-1993There rod pumping operations craft practice. Deviated pumping$225.00
- SY/T 5873.4-1993There rod pumping operations craft practice. Large pumping oil$225.00
- SY/T 5874-1993Water-repellent effect evaluation method$245.00
- SY/T 5874-2003Evaluation method on oil well water plugging$90.00
- SY/T 5874-2012Evaluation method on oil well water plugging$135.00
- SY/T 5874-2021Evaluation Method of Water Plugging Effect in Oil Well$184.00
- SY/T 5875-1993Well level test methods$205.00
- SY/T 5877-1993Density Instrument Maintenance Technical Specifications$225.00
- SY/T 5880.1-1993Calibration of petroleum well logging instruments - General rules$225.00
- SY/T 5880.1-1997Petroleum logging tool calibration - General rules$225.00
- SY/T 5880.2-1993Dual Induction - eight lateral calibration for logging procedures$225.00
- SY/T 5880.3-1994Microspheres focus calibration for logging procedures$225.00
- SY/T 5880.4-1995Petroleum Logging Tool Calibration - Acoustic Velocity Logger$225.00
- SY/T 5884-1993Fracturing technical conditions$225.00
- SY/T 5886-1993Slow acidic sandstone Evaluation Method$269.00
- SY/T 5886-2012Methods for evaluating performances of retarded acid$195.00
- SY/T 5886-2018Acidification working fluid performance evaluation method$270.00
- SY/T 5887-1993Evaluation method for effectiveness of crude oil pour point depressants$225.00
- SY/T 5888-1993Evaluation Method for Flotation Agent Effect - Rotor Gettering$55.00
- SY/T 5888-2016A flotation effect evaluation method of flotation agent. Turbine flotation$105.00
- SY/T 5889-1993Oxygen scavenger performance evaluation method$165.00
- SY/T 5889-2010Oxygen scavenger performance evaluation method$209.00
- SY/T 5890-1993Fungicide Performance Evaluation Method$225.00
- SY/T 5891.1-1993Wells perforated shells (device) to detect the production of concrete target specifications$165.00
- SY/T 5896-1993Labor quota Gas Project$270.00
- SY/T 5896-2002Labor quota of gas production engineering$315.00
- SY/T 5896-2012Labor quota of gas production engineering$1,379.00
- SY/T 5897-1993Labor quota Gas Transmission Project$285.00
- SY/T 5897-2002Labor quota of gas transmission engineering$285.00
- SY/T 5897-2012Labor quota of gas transmission engineering$579.00
- SY/T 5898-1993Earthquake General technical data transmission cables$225.00
- SY/T 5899-1993Hydraulic dynamometer technical conditions$225.00
- SY/T 5901-1993Petroleum Exploration and Development Instrument Category$165.00
- SY/T 5901-2011Classification for petroleum exploration and development instruments$345.00
- SY/T 5901-2024Classification of instruments for oil exploration and development$605.00
- SY/T 5903-1993Rod string group and design methods$225.00
- SY/T 5904-1993Well submersible pump selection pump design principles and selection method$150.00
- SY/T 5904-2004Recommended practice for sizing and selection of electric submersible pump installation$195.00
- SY/T 5904-2024Selection principles and design methods of submersible electric pumps$390.00
- SY/T 5905-1993Beam pumping unit selection approach$225.00
- SY/T 5906-1993Water distribution Zuizui loss curve plate production methods$245.00
- SY/T 5906-2003The method for plotting chart on pressure-loss curve through choke of water injection well$70.00
- SY/T 5906-2012The method for plotting chart on pressure-loss curve through water nozzle$194.00
- SY/T 5908-1994Test Method of Petroleum Sulfonates for Oil Flooding$204.00
- SY/T 5909-1994Operating rules for fishing and washover operations$225.00
- SY/T 5910-1994Top operating procedures to find fish$225.00
- SY/T 5911-1994Perforating Optimized design specifications$365.00
- SY/T 5911-2012Specifications for optimizing design of perforation$354.00
- SY/T 5912-1994Conodonts analysis and identification method$309.00
- SY/T 5912-2010Analysis and authenticates method for conodonts$449.00
- SY/T 5913-1994Rock producer method$150.00
- SY/T 5913-2004Rock thin section preparation$135.00
- SY/T 5913-2021Rock production method$424.00
- SY/T 5915-1994Method for identification of fossil spores and pollen$255.00
- SY/T 5915-2000Analysis and identification on spore. Pollens$255.00
- SY/T 5915-2018Analysis and identification for fossil spore and pollen$255.00
- SY/T 5916-1994Identification of rock samples cathodoluminescence$405.00
- SY/T 5916-2013Identification method of rocks and minerals by cathode luminescence$195.00
- SY/T 5916-2025Method for identifying rocks using cathodoluminescence microscopy$420.00
- SY/T 5917-1994Large particles coring device$225.00
- SY/T 5918-1994Buried steel pipeline asphalt coating technology overhaul provisions$395.00
- SY/T 5918-2004Technical criteria for external coating rehabilitation of buried steel pipeline$270.00
- SY/T 5918-2011Specification for external coating rehabilitation of buried steel pipeline$495.00
- SY/T 5918-2017Specification for external coating and insulation rehabilitation of buried steel pipeline$710.00
- SY/T 5918-2024Technical specification for repairing the outer anti-corrosion and insulation layers of buried steel pipelines$650.00
- SY/T 5919-1994Technical management procedures to protect buried steel pipelines electrical$690.00
- SY/T 5920-1994Crude library operation and management$245.00
- SY/T 5920-2007Specification for operation management of crude oil and natural gasoline terminal$135.00
- SY/T 5921-1994Vertical cylindrical steel tank welding technology overhaul procedures$90.00
- SY/T 5921-2000Code for repair of vertical cylindrical welded steel crude oil tanks$285.00
- SY/T 5921-2011Code of practice for operating, maintenance and repair of vertical cylindrical welded steel oil tank$590.00
- SY/T 5921-2017Specification for operating, maintenance and repair of vertical cylindrical welded steel oil tank$500.00
- SY/T 5921-2024Vertical cylindrical steel welded oil tank - Operation, maintenance and repair specifications$800.00
- SY/T 5922-1994Gas pipeline operation and management$165.00
- SY/T 5922-2003Run criterion of natural gas pipeline$165.00
- SY/T 5922-2012The operation regulation of gas pipeline$145.00
- SY/T 5922-2024Natural Gas Pipeline Operation Specifications$480.00
- SY/T 5923-1993Water glass water-repellent operating methods - calcium chloride and water shutoff profile control technology practice$525.00
- SY/T 5923-2012Operation method of water plugging in production well. Process technologies of water plugging and profile control with sodium silicate and calcium chloride$404.00
- SY/T 5924-1993Water-repellent work methods. Openhole mechanical shutoff card operations$485.00
- SY/T 5924-2011The operation method for water shut off producer. Water shut off operation by the mechanic method for open hole$345.00
- SY/T 5925-1994Oilfield chemical tracer injection selection method$169.00
- SY/T 5925-2012Method for selecting chemical tracers used in water injection$144.00
- SY/T 5927-1994Petroleum Geophysical Global Positioning System (GPS) measurements specification$225.00
- SY/T 5927-2000Specification for GPS surveying in petroleum geophysical exploration$240.00
- SY/T 5928-1994Petroleum seismic data archive storage requirements$405.00
- SY/T 5928-2000Specifications for seismic exploration data delivering and keeping in the archives$90.00
- SY/T 5928-2009Specifications for seismic exploration data delivering filing and keeping$105.00
- SY/T 5928-2016Specifications for archived seismic date$169.00
- SY/T 5928-2025Seismic Exploration Data Archiving Standards$405.00
- SY/T 5930-1994Magnetotelluric depth sounder use and maintenance$150.00
- SY/T 5930-2000Operation and maintenance for magnetotelluric instruments$150.00
- SY/T 5930-2010Operation and maintenance for electromagnetic instruments$345.00
- SY/T 5931-1994Optical and infrared range finder theodolite use and maintenance$120.00
- SY/T 5931-2000The codes for survey instruments using and maintenance$240.00
- SY/T 5933-1994Seismic reflection layers Bit Name Symbol$85.00
- SY/T 5933-2000Code naming principle of seismic reflection horizon$70.00
- SY/T 5933-2008Code naming principle of seismic reflection horizon$85.00
- SY/T 5934-1994Drilling conformity verification of structural results from seismic exploration$225.00
- SY/T 5934-2000Coincidence testing of seismic structure with well data$90.00
- SY/T 5935-1994I/0 system I and system type II telemetry seismograph test items and technical indicators$205.00
- SY/T 5935-2000The checking items and technical specifications for I/S SYSTEM series telemetry seismic data acquisition system$205.00
- SY/T 5936-1994Land use with digital geophone and Maintenance$70.00
- SY/T 5936-2000Use and maintenance of conventional peophone$165.00
- SY/T 5936-2007Rules for geophoneuse and maintenance$70.00
- SY/T 5936-2013Rules for geophones use and maintenance$224.00
- SY/T 5938-1994Seismic reflection geological horizon calibration$225.00
- SY/T 5939-1994Gravimeter use and maintenance$120.00
- SY/T 5939-2000Operation and maintenance for gravimeter$120.00
- SY/T 5939-2009Operation and maintenance for gravimeter$240.00
- SY/T 5940-1994Log interpretation method of producing layer parameters$365.00
- SY/T 5940-2010Log computational method for parameters of reservoir$315.00
- SY/T 5940-2019Logging calculation method of reservoir parameters$729.00
- SY/T 5941-1994Diplog jobs Technical Specification$225.00
- SY/T 5943-1994Technical specifications for maintenance of compensated neutron logging tools$325.00
- SY/T 5944-1994Technical specification for maintenance of acoustic velocity logging instruments$325.00
- SY/T 5945-2004The specification for well logging interpretation report writing norm$165.00
- SY/T 5945-2016The specification for well logging interpretation report writing norm$209.00
- SY/T 5945.1-1994Log interpretation report writing specifications. Writing exploratory interpretation report$225.00
- SY/T 5945.2-1994Log interpretation report writing specifications. Writing production logging interpretation report$225.00
- SY/T 5946-1994Polyacrylamide potash drilling$120.00
- SY/T 5946-2002Potassium polyacrylamide for drilling fluid$150.00
- SY/T 5946-2019Drilling fluid coating inhibitor polyacrylamide potassium salt$264.00
- SY/T 5947-1994Operating rules for pressure-maintaining coring$225.00
- SY/T 5948-1994Potassium polyacrylamide for drilling fluid$225.00
- SY/T 5949-1994Method for three-dimensional trajectory design of directional wells$225.00
- SY/T 5950-1994Petroleum industry plan statistical indicators code$1,110.00
- SY/T 5950-2012Codes for planning and statistical indicators of petroleum industry$839.00
- SY/T 5952-1994Oil and gas wells, downhole tool string craft Legend$390.00
- SY/T 5952-2005Legend of downhole process strings and tools for hydrocarbon production well and water injection well$405.00
- SY/T 5952-2014Legends of downhole strings and tools for production and injection well$930.00
- SY/T 5952-2024Illustration of downhole process string tools for oil, gas and water wells$620.00
- SY/T 5954-1994Acceptance of the project before drilling and requirements$85.00
- SY/T 5954-2004Inspection items and requirements prior to spudding$240.00
- SY/T 5954-2021Acceptance items and requirements before drilling$274.00
- SY/T 5955-1994Technical requirements for directional drilling$85.00
- SY/T 5955-1999Directional drilling technology and its quality control requirements$285.00
- SY/T 5955-2004Trajectory quality for directional well$55.00
- SY/T 5955-2018The trajectory quality of directional wells$85.00
- SY/T 5956-1994Drill scrapped technical requirements$165.00
- SY/T 5956-2004Technical regulations of drill etring abandonment$55.00
- SY/T 5956-2021Technical Specification for Drilling Tool Disuse$184.00
- SY/T 5957-1994Requirements for Installation of Electrical Appliances at Wellsite$225.00
- SY/T 5958-1994Wellsite layout principles and technical requirements$225.00
- SY/T 5960-1994Oil well cement fluid loss agent evaluation methods$225.00
- SY/T 5961-1994Wax equipment$85.00
- SY/T 5961-2008Wax removal equipment$210.00
- SY/T 5961-2014Wax removal equipment$379.00
- SY/T 5962-1994Machine wash well$105.00
- SY/T 5962-2008Well cleanout equipment$180.00
- SY/T 5962-2014Well cleanout equipment$319.00
- SY/T 5963-1994Specification for the equipment of measuring instruments in oil production enterprises$325.00
- SY/T 5964-1994Drilling Well Control device combination of complementary norms$315.00
- SY/T 5964-2003Combination, installation, adjustment and maintenance of well - control equipments$680.00
- SY/T 5964-2006Combination installation adjustment and maintenance of well-control equipments$345.00
- SY/T 5964-2019Specification for combination, installation, commissioning and use of drilling and well control devices$639.00
- SY/T 5965-1994Specification for geological design of exploratory wells$405.00
- SY/T 5965-2000Geological design standard for oil and gas exploration wells$120.00
- SY/T 5965-2010Geological proposal specification for oil and gas exploration wells$389.00
- SY/T 5965-2017Code for geology design of oil and gas exploration wells$405.00
- SY/T 5967-1994Drilling well control equipment installation and maintenance$225.00
- SY/T 5968-1994Exploratory oil test methods and test data quality assessment$245.00
- SY/T 5968-2011Specification for evaluating well testing quality of exploration well$135.00
- SY/T 5969-1994Gas logging data interpretation procedures$395.00
- SY/T 5969-2005Comprehensive interpretation specification of geo-logging for oil, gas and water layer of oil and gas exploration well$244.00
- SY/T 5970-1995Complex design requirements Block overall field development plan$325.00
- SY/T 5970-2012Technical requirements of development plan drawing up on complex faulted oil field development geology and reservoir engineering$304.00
- SY/T 5971-1994Evaluation method for performance of clay stabilizer for water injection$85.00
- SY/T 5971-2016The performance evaluation method of clay stabilizer for fracturing, acidizing and water injection in oil and gas fields$229.00
- SY/T 5972-1994Drilling Selection and calculation basis$120.00
- SY/T 5972-2009Type selection for rig foundation$195.00
- SY/T 5972-2021Basic technical specifications for drilling rigs$364.00
- SY/T 5974-2020Safety Technical Regulations for Drilling Wellsite Equipment Operation$345.00
- SY/T 5975-1994Geological exploration well test design midway format$225.00
- SY/T 5977-1994Comprehensive logging logging data interpretation specification$225.00
- SY/T 5978-1994Unit division for basin structure enriching oil and gas$55.00
- SY/T 5978-2016Tectonic unit division of petroliferous basin$149.00
- SY/T 5979-1994Nomenclature of petroleum and natrual gasreservoirs$55.00
- SY/T 5979-2016Specification for nomenclature of oil and gas reservoir(field/play)$149.00
- SY/T 5980-1994Exploratory oil test mining geology design format$355.00
- SY/T 5980-1999The design standard for testing exploring well$710.00
- SY/T 5980-2009Specification for design of well test of exploration well$465.00
- SY/T 5980-2020Design specification for exploration well oil test$500.00
- SY/T 5981-2000Technology procedure for conventional well testing and production testing$135.00
- SY/T 5981-2012The technical code of conventional well testing$225.00
- SY/T 5981-2025Conventional oil testing and production testing technical procedures$240.00
- SY/T 5982-1994Determination of Some Metal Elements in the Water from Oil and Gas Fields by Atomic Absorption Spectrometry$135.00
- SY/T 5982-2024Analysis Method of Metal Elements in Oil and Gas Field Water$240.00
- SY/T 5983-1994Illite/smectite interlayer mineral X-ray diffraction method$225.00
- SY/T 5984-2020Safety specification for grounding installation of oi1 (gas) field vessel, pipeline and 1oad (unload) equipment$124.00
- SY/T 5985-2020Safety Regulations for Liquefied Petroleum Gas Filling Plant (Station)$165.00
- SY/T 5988-1994Tubing adapter$395.00
- SY/T 5988-2012Adapter of tubing and casing$195.00
- SY/T 5988-2018Adapter of tubing and casing$285.00
- SY/T 5989-1994Straight sleeve seam ordering technology abroad$1,000.00
- SY/T 5989-2012High frequency electrical resistance welding steel pipes for use as casing$590.00
- SY/T 5989-2019Straight seam resistance welding sleeve$659.00
- SY/T 5991-1994Casing, tubing and transmission pipe thread protectors$55.00
- SY/T 5991-2010Thread protectors for casing, tubing, line pipe and drill pipe$229.00
- SY/T 5991-2016Casing, tubing, pipe and drill pipe thread protection$175.00
- SY/T 5992-1994Pipe hydrostatic burst test method for delivering$389.00
- SY/T 5992-2012Method of hydrostatic burst test for line pipes$404.00
- SY/T 5994-1994Measuring methods for individual parameters of petroleum pipe threads - Field test methods for sealing and anti-galling performance of casing$325.00
- SY/T 5996-1994Technical Conditions of CBL Combination Instruments$85.00
- SY/T 5996-2016Cement bond combination logging tool$209.00
- SY/T 6009-1994Sample analysis of oil and gas surface geochemical exploration methods$225.00
- SY/T 6009.1-2003Test method of samples of geochemical exploration for oil and gas. Part 1: Determination of acidolysis hydrocarbons. Gas chromatography$240.00