Valid

SY/T 5970-2012Technical requirements of development plan drawing up on complex faulted oil field development geology and reservoir engineering (English PDF)

复杂断块油田开发方案编制技术要求 开发地质与油藏工程部分

Preview PDF

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for SY/T 5970-2012 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

August 23, 2012

Implementation date

December 1, 2012

Scope

SY/T 5970-2012 is the English-translated version of 复杂断块油田开发方案编制技术要求 开发地质与油藏工程部分.

SY/T 5970-2012 is the Chinese industry standard "Technical requirements of development plan drawing up on complex faulted oil field development geology and reservoir engineering".

It was issued on August 23, 2012 by the National Energy Administration, and took effect on December 1, 2012. It is in force and replaces SY/T 5970-1995.

Found what you need?

Document preview — SY/T 5970-2012

National Standard of the People's Republic of China

Issued by: National Energy Administration

Contents

  • Document data
1 Document data

Sector: Petroleum & Gas (industry standard).

Issuing body: National Energy Administration.

Date of issue: 2012-08-23.

Date of implementation: 2012-12-01.

Status: valid, replaces SY/T 5970-1995.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Editions of SY/T 5970

EditionTitleRevisionStatus
SY/T 5970-2012Technical requirements of development plan drawing up on complex faulted oil field development geology and reservoir engineering—Valid
SY/T 5970-1995Complex design requirements Block overall field development plan—Obsolete

This page sells the current edition, SY/T 5970-2012. Earlier editions are listed for reference only.

How to Download SY/T 5970-2012

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

SY/T 5970-2012

$304.00