Search SY/T
500 SY/T standards in English, from SY/T 6009.2-2003 to SY/T 6311-2012, in code order.
- SY/T 6009.2-2003Test method of samples of geochemical exploration for oil and gas. Part 2: Determination of soluble hydrocarbons. Gas chromatography$240.00
- SY/T 6009.3-2003Test method of samples of geochemical exploration for oil and gas Part 3: Determination of light hydrocarbons in head space. Gas chromatography$240.00
- SY/T 6009.4-2003Test method of samples of geochemical exploration for oil and gas. Part 4: Determination of thermal released hydrocarbons Gas chromatography$240.00
- SY/T 6009.5-2003Test method of samples of geochemical exploration for oil and gas. Part 5: Determination of free hydrocarbons. Gas chromatography$240.00
- SY/T 6009.6-2003Test method of samples of geochemical exploration for oil and gas. Part 6: Determination of alterative carbonate (△C)$240.00
- SY/T 6009.7-2003Test method of samples of geochemical exploration for oil and gas. Part 7: Determination of thermal released mercury$240.00
- SY/T 6009.8-2003Test method of samples of geochemical exploration for oil and gas. Part 8: Determination of the polynuclear aromatic hydrocarbons. Fluorometry$240.00
- SY/T 6009.9-2003Test method of samples of geochemical exploration for oil and gas. Part 9: Determination of the gross amount of aromatic hydrocarbons and their ramifications Ultraviolet spectroscopy$240.00
- SY/T 6010-1994Determination of uniform temperature and salinity sedimentary inclusions$285.00
- SY/T 6010-2011Test method for fluid inclusion in sedimentary basins by microthermometry$165.00
- SY/T 6010-2025Methods for determining the homogenization temperature, initial melting temperature, and freezing point temperature of fluid inclusions$285.00
- SY/T 6011-1994Exploratory oil test construction design format$225.00
- SY/T 6012-1994Beach Sea oil test operating procedures$70.00
- SY/T 6012-2000The working standards of testing well on seashore$70.00
- SY/T 6012-2012The operating code of practice for well testing on off shore$224.00
- SY/T 6013-2000The standard of conventional well testing data acquisition$395.00
- SY/T 6013-2009Specification for well test data acquisition$285.00
- SY/T 6013-2019Oil testing data admission specifications$479.00
- SY/T 6014-2019Safety Regulations of Petroleum Geology Laboratory$354.00
- SY/T 6015-1994Rock pyrolysis analysis method for oil and gas show analyzers$325.00
- SY/T 6016-1994Operating procedures for well testing and trial production of heavy oil wells$325.00
- SY/T 6019-1994Operating procedures for screw pump liquid drainage well testing$325.00
- SY/T 6020-1994Geological logging of oil and gas exploration well in line with the rate of the water layer interpretation of statistical methods$225.00
- SY/T 6021-1994Specification for Oil and Gas Exploration$234.00
- SY/T 6025-1994Oil and Gas Reserves Information Code$120.00
- SY/T 6025-2012Nomenclature specification of data items for oil and gas reserves$609.00
- SY/T 6026-1994Two-stage cementing procedure$225.00
- SY/T 6027-1994Oxygenated mineral electron probe quantitative analysis method$229.00
- SY/T 6027-2012Quantitative analysis method of rock and mineral by electron probe microanalysis$105.00
- SY/T 6027-2019Quantitative analysis method of rock mineral electronic probe$124.00
- SY/T 6028-1994Requirements for Sampling and Results of Chemical Examination on Exploration Wells$105.00
- SY/T 6028-2020Exploration well geological experiment analysis items and sampling requirements$240.00
- SY/T 6030-1994Horizontal well logging operations technical regulations$205.00
- SY/T 6030-2003Specification for logging operation of horizontal wells$105.00
- SY/T 6030-2012Technical specification for logging operation of drill pipe and pipe conveyed$85.00
- SY/T 6030-2018Technical specification for drill and pipe conveyed wireline logging operation$175.00
- SY/T 6030-2025Technical Specifications for Drill Pipe and Tubing Logging Operations$255.00
- SY/T 6031-1994Scale temperature logging tool maintenance and technical regulations$205.00
- SY/T 6032-1994Codes of China National Petroleum Corporation (CNPC), enterprises and public institutions$225.00
- SY/T 6033-1994And diameter scale logging tool maintenance and technical regulations$225.00
- SY/T 6034-1994Operating procedures for downhole ultrasonic televiewer logging systems$325.00
- SY/T 6036-1994Format of geological operation design for fracturing and acidizing of exploratory wells$225.00
- SY/T 6037-1994Exploratory geological logging comprehensive interpretation results Quality Acceptance$225.00
- SY/T 6039-1994Carbonate and oxygen isotopic. Phosphoric Acid$225.00
- SY/T 6040-1994Working rules for trap description and evaluation$325.00
- SY/T 6042-1994Dynamic measurement and calculation for liquefied petroleum gas and stable light hydrocarbon$680.00
- SY/T 6042-2019Dynamic measurement calculation method of liquefied petroleum gas and stable light hydrocarbon$284.00
- SY/T 6044-2004Emergency requirements of the safety of offshore oil operations$75.00
- SY/T 6044-2019Shallow (beach) offshore oil and gas operations safety emergency requirements$264.00
- SY/T 6049-1994Cutting and chemical explosions downhole string cutting operating procedures$225.00
- SY/T 6050-1994PDC drill bit using the basic rules and wear assessment methods$225.00
- SY/T 6051-1994Technical specification for acquisition of two-dimensional seismic exploration data in mountainous areas$375.00
- SY/T 6051-2000Technical specification of 2D seismic exploration data acquisitionfor mountainous area$240.00
- SY/T 6052-1994Quality control of field processing of seismic exploration data$225.00
- SY/T 6052-2000Specification of on-site processing associated with seismic data acquisition$240.00
- SY/T 6053-1994YKZ480 digital telemetry seismograph test items and technical indicators$205.00
- SY/T 6053-2000Checking items and technical specifications for YKZ480 telemetry seismic data recorder$240.00
- SY/T 6054-1994Technical specification for acquisition of seismic exploration data in land-water transition zones$135.00
- SY/T 6054-2000Technical specification for seismic data acquisition in transitional zone$240.00
- SY/T 6055-1994Oil gravity, magnetic, electrical prospecting maps$135.00
- SY/T 6055-2002Map of gravity, magnetic, electric and geochemical exploration$120.00
- SY/T 6055-2010Technical specification for petroleum gravity, magnetic, electric and geochemical exploration map$249.00
- SY/T 6055-2019Specification for drawing maps of petroleum gravity, magnetic force, electric method and geochemical exploration$354.00
- SY/T 6056-1994Drilling aging calculation method$225.00
- SY/T 6057-1994Derrick tower transport regulations$165.00
- SY/T 6057-2012Operation procedures for disassembly/reassembly and skidding of pyramid mast$404.00
- SY/T 6058-1994Jack-derrick put operating procedures$55.00
- SY/T 6058-2004Operation procedures for lifting and laying down of self-electing mast$374.00
- SY/T 6059-1994Derrick dismantling tower operating procedures$225.00
- SY/T 6060-1994Derrick tower guy wire system technical conditions$225.00
- SY/T 6061-1994Test test voltage controlled operating procedures$225.00
- SY/T 6062-1994Oil and gas surface geochemical exploration technology specification$240.00
- SY/T 6063-1994Buried steel pipeline coating insulation resistance measurement site technical requirements$225.00
- SY/T 6064-1994Pipelines flag set technical requirements$165.00
- SY/T 6064-2011The operation technical specification for marking main pipeline$255.00
- SY/T 6064-2017Specification for marking the routes of oil and gas pipelines$295.00
- SY/T 6064-2024Technical specification for marking of oil and gas pipelines$390.00
- SY/T 6065-1994Pipelines capsule sealing technology requirements$225.00
- SY/T 6066-1994Crude oil pipeline system efficiency test method$630.00
- SY/T 6066-2003The method of energy consumption test and calculation for crude oil pipeline transport system$120.00
- SY/T 6066-2012The Method of Energy Consumption Test and Calculation for Crude Oil Pipeline Transport System$135.00
- SY/T 6066-2021Crude oil transportation pipeline system energy consumption test and calculation method$444.00
- SY/T 6067-1994Crude station operation and management regulations Kuguan Network$225.00
- SY/T 6068-1994Aerial parts of oil and gas pipelines and ancillary facilities maintenance procedures$55.00
- SY/T 6068-2008Specification for maintaining of oil and gas pipeline aerial section and attaching installation$85.00
- SY/T 6068-2014Specification for maintaining of aerial section and attaching installations of oil and gas pipelines$880.00
- SY/T 6068-2024Maintenance specification for overhead sections of oil and gas pipelines and their ancillary facilities$755.00
- SY/T 6069-1994Crude oil pipeline SCADA Technical Specifications$165.00
- SY/T 6069-2005Code of running technology for the instrument and automatic system of the oil and gas transportation pipeline$270.00
- SY/T 6069-2011Specification of running technology for the instrument and automatic system of the oil and gas pipeline$495.00
- SY/T 6069-2020Oil and gas pipeline instrumentation and automation system operation technical specifications$465.00
- SY/T 6070-1994Light hydrocarbon reservoir operation and management$225.00
- SY/T 6072-1994Drilling milling shoes$285.00
- SY/T 6072-2009Milling tools for drilling and servicing$135.00
- SY/T 6073-1994Evaluation method for filter aids$325.00
- SY/T 6074-1994Modified plant gum product performance measurement methods and$225.00
- SY/T 6075-1994Basic data for evaluating the compatibility of fluids entering wells with producing formations (sandstone)$325.00
- SY/T 6076-1994Classification and codes of working hour consumption for labour quotas in petroleum industry$325.00
- SY/T 6077-1994Basic rules for compilation of labour quota standards for the petroleum industry$325.00
- SY/T 6078-1994Vertical metal tank fabrication and installation work quota$470.00
- SY/T 6078-2005Labour quota for fabrication and installation of vertical metal tank$390.00
- SY/T 6078-2012Labour quota for fabrication and installation engineering of vertical metal tank$525.00
- SY/T 6078-2018Metal vertical tank production and installation engineering labor quota$545.00
- SY/T 6079-1994Oil and gas exploration projects fixed term labor$70.00
- SY/T 6079-2012Terms of work and personnel quota for oil and gas production$434.00
- SY/T 6080-1994Technical specification for profile control with xanthan gum$325.00
- SY/T 6081-1994Production engineering design specification writing$840.00
- SY/T 6081-2012Specifications for oil production engineering project design$375.00
- SY/T 6081-2024Specification for the design of oil production engineering scheme$360.00
- SY/T 6082-1994Oil seismic exploration and maintenance of truck-mounted rig$229.00
- SY/T 6082-2010Petroleum seismic drilling rig operation and maintenance$209.00
- SY/T 6084-1994Ground drive screw pump use and maintenance$70.00
- SY/T 6084-2007Using and maintaining for ground drive progressing cavity pumps$105.00
- SY/T 6084-2014Use and maintain for ground drive progressing cavity pumps$159.00
- SY/T 6085-1994FSQ-15 type vacuum washed sand foam generator$205.00
- SY/T 6086-1994Technical specification for thermal recovery steam generator running$205.00
- SY/T 6086-2012Technical standard for operation of thermal recovery steam generator$135.00
- SY/T 6086-2019Operation technical regulations of oil field steam injection boiler and supporting water treatment system$404.00
- SY/T 6087-1994ESP stuck salvage craft practice$470.00
- SY/T 6088-1994Deep fracturing technology practice$225.00
- SY/T 6089-1994Steam stimulation operating procedures$165.00
- SY/T 6089-2012Operation procedure for steam huff and puff$244.00
- SY/T 6090-1994Operation Procedure for Steam Huff and Puff$225.00
- SY/T 6091-1994Ground records gyro inclinometer measurement procedures$225.00
- SY/T 6093-1994Evaluation Procedure for Pipe-freeing Agents Used in Drilling Fluids$204.00
- SY/T 6094-1994Evaluation Procedure for Lubricants Used in Drilling Fluids$105.00
- SY/T 6094-2024Technical specification for lubricants used in drilling fluids$240.00
- SY/T 6095-1994Technical requirements for preparation of gas reservoir engineering design in development programmes for lenticular sandstone gas fields$225.00
- SY/T 6095-2000Technical requirements for programming development plan of lenticular sandstone gas field$240.00
- SY/T 6096-1994History gas field wells system specification$395.00
- SY/T 6096-2012The compilation specification of well history of natural gas field$609.00
- SY/T 6098-1994Standards of the contract for a chinese--foreign equity joint venture in petroleum industry$180.00
- SY/T 6098-2000The eatimated methods of natural gas recoverable reserves$255.00
- SY/T 6098-2010The estimated methods of natural gas recoverable reserves$1,130.00
- SY/T 6098-2022Calculation method of recoverable reserves of natural gas$545.00
- SY/T 6099-1994Block reservoir reserve calculation rules$590.00
- SY/T 6099-2012Detailed rules and regulations for reserves estimation of fault block oil-gas reservoir$304.00
- SY/T 6101-1994Gas condensate reservoir phase behavior to determine the technical requirements$1,000.00
- SY/T 6101-2012Technical requirements for determining phase behaviors of gas condensate reservoirs$629.00
- SY/T 6102-1994Contents and requirements for data acquisition in performance monitoring of steam injection development of heavy oil reservoirs$120.00
- SY/T 6102-2000Specification requirement for dynamic monitoring heavy oil reservoir development by steam injection$245.00
- SY/T 6102-2006Oil field development monitoring and data requirement$90.00
- SY/T 6102-2022Specifications for oilfield development monitoring and data collection$120.00
- SY/T 6103-1994Experimental methods of pore body epoxy Prayer$165.00
- SY/T 6103-2004Measurement of rock pore structure Method of image analysis$120.00
- SY/T 6103-2019Determination of rock pore structure characteristics Image analysis method$354.00
- SY/T 6104-1994Hollow rod electric heating device$225.00
- SY/T 6105-1994Field development conceptual design prepared the technical requirements$285.00
- SY/T 6105-2009Technical requirements for feasible evaluation of oil field development$105.00
- SY/T 6106-1994Carbonate gas reservoir development and design preparation of the technical requirements$710.00
- SY/T 6106-2003Technical requirement for preparing of development plan for gas reservoir$435.00
- SY/T 6106-2008Technical requirement of preparing gas field development plan$345.00
- SY/T 6106-2014Technical requirement of preparing gas field development plan$299.00
- SY/T 6106-2020Technical requirements for the preparation of gas field development plans$480.00
- SY/T 6107-1994Determination of thermal properties of reservoir rock parameters$285.00
- SY/T 6107-2002Test method for rock thermal petrophysical parameters$285.00
- SY/T 6107-2010Test method of reservoir thermophysical parameters$345.00
- SY/T 6107-2020Measuring method of oil reservoir thermophysical parameters$360.00
- SY/T 6108-1994Carbonate Gas Reservoir Dynamic Analysis of Technical Specifications$345.00
- SY/T 6108-2004Technical specification of performance analysis for carbonate gas reservoir$180.00
- SY/T 6108-2012Technical specifications of performance analysis for gas reservoirs$285.00
- SY/T 6108-2025Technical specification for gas reservoir performance analysis$420.00
- SY/T 6110-1994Carbonate Gas Reservoir Geology characterization$365.00
- SY/T 6110-2002The description of exploitation geologic characteristics for carbonate gas reservoir$355.00
- SY/T 6110-2008The method for gas reservoir description$345.00
- SY/T 6110-2016The method for gas reservoir description$229.00
- SY/T 6111-1994Carbonate gas reservoir development adjustment programs prepare technical specifications$70.00
- SY/T 6111-2007Technical requirements for preparing of development plan adjustment for gas reservoir$105.00
- SY/T 6111-2018Technical requirement for preparing of development adjustment plan for gas field$135.00
- SY/T 6112-1994Oil drilling equipment pneumatic components Pressure regulator$225.00
- SY/T 6113-1994Workover pneumatic chuck technical conditions$55.00
- SY/T 6113-2008Pneumatic spider for well servicing$120.00
- SY/T 6113-2016Pneumatic spider for well servicing$189.00
- SY/T 6113-2023Oil and gas drilling equipment Power chuck for well workover$255.00
- SY/T 6114-1994Fracturing manifold car$225.00
- SY/T 6115-1994Flushing fluid handling car$269.00
- SY/T 6115-2012Self-circulation well-flushing equipment$345.00
- SY/T 6116-1994Bent fish-head overshots for well workover$225.00
- SY/T 6117-1994Petroleum workover rig use and maintenance$90.00
- SY/T 6117-2003The operating and maintenance of petroleum workover rig$240.00
- SY/T 6117-2010The operating and maintenance of petroleum workover rig$330.00
- SY/T 6117-2016Oil rig and workover rig use and maintenance$405.00
- SY/T 6117-2025Petroleum drilling and production equipment - Operation and maintenance of petroleum drilling rig and workover rig$480.00
- SY/T 6118-1995Technical specification for running thermal recovery steam generator water treatment system$55.00
- SY/T 6118-2013The technical specifications for water processing system operation of thermal recovery steam generator$345.00
- SY/T 6119-1995Rod pumping wells condition tester$365.00
- SY/T 6120-1995Downhole oil well blowout technical regulations$55.00
- SY/T 6121-1995Packers stuck salvage craft practice$90.00
- SY/T 6122-1995Tubular magnetic injection enhancers$325.00
- SY/T 6124-1995Gas lift gas drainage technologies practice$150.00
- SY/T 6124-2010Practice for water drainage and gas production by gas lift technology$289.00
- SY/T 6124-2017Practice for water drainage and gas production by gas lift$205.00
- SY/T 6125-1995Dynamic gas well monitoring technical specifications$165.00
- SY/T 6125-2006Technology procedures for gas well testing, gas producing and performance monitoring$330.00
- SY/T 6125-2013Technology procedures for gas well testing, gas producing and performance monitoring$285.00
- SY/T 6125-2024Gas well testing, gas production and dynamic monitoring process regulations$165.00
- SY/T 6126-1995Statistics of Production Indices for Wells with Pumping Unit or ESP$105.00
- SY/T 6126-2017Statistics method of production indication used in the pumping unit, electric submersible centrifugal pump and progressive cavity pump$225.00
- SY/T 6127-1995Specification for data acquisition items of downhole operations in oil, gas and water wells$195.00
- SY/T 6127-2006Specification of data collection items for downhole operation in oil, gas, water wells$195.00
- SY/T 6127-2017Specification of data collection items for downhole operation in oil��gas��water wells$365.00
- SY/T 6128-1995Evaluation method for the connection performance of tubing and casing threads$1,230.00
- SY/T 6128-2012Procedure for evaluation tests of tubing and casing connection properties$889.00
- SY/T 6129-1995Determination for diffusion coefficient of hydrocarbon gases in rock$85.00
- SY/T 6129-2016Determination of Diffusion Coefficient of Hydrocarbon in Rock$145.00
- SY/T 6130-1995Steam injection wells vapor absorption profile parameters of the test and interpretation$395.00
- SY/T 6130-2009The parameter test and injection profile explanation method for steam injection well$105.00
- SY/T 6130-2018The parameter test and injection profile explaination method for steam injection well$150.00
- SY/T 6131-1995Clastic particle size measurement laser method$225.00
- SY/T 6132-1995Coal and rock measuring methane adsorption Capacity Act$105.00
- SY/T 6132-2013Determination of the methane isothermal adsorption quantity in coal. Capacity method of dry basis$324.00
- SY/T 6137-1996Technical regulations for safe production of sour gas wells$285.00
- SY/T 6137-2005Recommended practices for oil and gas producing and gas processing plant operations involving hydrogen sulfide$510.00
- SY/T 6137-2017Safety specification for gas gathering and processing involving hydrogen sulfide environment$285.00
- SY/T 6137-2024Safety specification for natural gas collection and processing in hydrogen sulfide environments$285.00
- SY/T 6139-1996Terms used in well logging for oil and gas$650.00
- SY/T 6139-2005Terms used in well logging for oil and gas$1,699.00
- SY/T 6143-1996Standard orifice measurement method for natural gas flow$1,500.00
- SY/T 6144-1995Standard orifice measurement method for natural gas flow$189.00
- SY/T 6144-2008Technical specifications of neutron lifetime logging tool$240.00
- SY/T 6145-1995Low-band seismograph$205.00
- SY/T 6145-2008Near surface seismic instrument for petroleum exploration$285.00
- SY/T 6145-2019Petroleum shallow exploration seismograph$424.00
- SY/T 6147-1995Echo sounder$225.00
- SY/T 6148-1995Pipeline pigging procedures$225.00
- SY/T 6149-1995Gas pipeline pressure test run technical specifications$225.00
- SY/T 6150-1995Oil and gas pipelines transport machinery kept plugging operation Technical Specification$225.00
- SY/T 6150.1-2003Technical standard of tapping and plugging on steel pipeline-Part 1: Plug and cylinder stopple$255.00
- SY/T 6150.1-2011Technical standard of tapping and plugging on steel pipeline. Part 1: Plug stopple and barrel stopple$375.00
- SY/T 6150.1-2017Specification for tapping & plugging on steel pipeline. Part 1: Plug stopple & barrel stopple$495.00
- SY/T 6150.1-2024Technical specification for plugging steel pipelines - Part 1: Plug-type and cylinder-type plugging$530.00
- SY/T 6150.1.1-2017Technical specification for sealing of steel pipes - Part 1: Plug and tube plugging$285.00
- SY/T 6150.2-2003Technical standard of tapping and plugging on steel pipeline - Part 2: The rigide plate-bag stopping on pipeline$285.00
- SY/T 6150.2-2011Technical standard of tapping and plugging on steel pipeline. Part 2: The rigid plate-bag stopping on pipeline$405.00
- SY/T 6150.2-2018Technical specification for sealing of steel pipes - Part 2: baffle-seal$405.00
- SY/T 6150.2-2025Specification for hot tapping and plugging on steel pipclinc - Part 2: Rigid plate-bag stoppling$455.00
- SY/T 6151-1995Steel Pipe body corrosion damage assessment method$365.00
- SY/T 6151-2009Assessment of corroded steel pipelines$115.00
- SY/T 6151-2022Evaluation method of metal loss defects in steel pipelines$300.00
- SY/T 6154-1995Determination for rock specific surface area and pore size distribution - Static nitrogen absorption volumetric method$135.00
- SY/T 6154-2019Rock specific surface area and pore size distribution determination Static adsorption capacity method$334.00
- SY/T 6155-1995Guide for compiling reliability evaluation and test rules for petroleum equipment$264.00
- SY/T 6156-1995Guide for compiling reliability evaluation and test rules for petroleum equipment$70.00
- SY/T 6156-2003Technical specification of airgun source$85.00
- SY/T 6156-2010Technical specification of airgun source$169.00
- SY/T 6156-2017Technical specifications for air guns (bilingual version)$315.00
- SY/T 6157-1995Statistics and description of pores, cavities and fractures in cores of carbonate reservoirs$225.00
- SY/T 6158-1995Oil and gas exploration wells admission geological data project$225.00
- SY/T 6159-1995Drilling fluid agitator$225.00
- SY/T 6160-1995BOP hydraulic inspection and repair$445.00
- SY/T 6160-2008Check and maintenance of blowout preventer$180.00
- SY/T 6160-2014Check and maintenance of blowout preventer$415.00
- SY/T 6160-2019BOP inspection, repair and remanufacturing$849.00
- SY/T 6161-1995Logging save gas regulations$515.00
- SY/T 6161-2009Specifications for the process and interpretation of logging data in natural gas reservoir$315.00
- SY/T 6162-1995Perforating coring chart formats$435.00
- SY/T 6162-2008Format for perforation and side-wall coring charts$240.00
- SY/T 6163-1995Oil and gas well perforating bullet analog transport vibration test$209.00
- SY/T 6163-2018General specifications and testing methods of shaped charge perforating equipment for oil and gas well$1,300.00
- SY/T 6164-1995Clastic reservoir geological characterization methods$225.00
- SY/T 6165-1995Carbonate reservoir geological characterization methods$225.00
- SY/T 6166-1995Oil layers of group division and correlation methods. Clastic section$225.00
- SY/T 6167-1995Natural energy reservoir evaluation methods$225.00
- SY/T 6168-1995Gas reservoir classification$365.00
- SY/T 6169-1995Classification for oil reservoir$135.00
- SY/T 6169-2021Reservoir classification$424.00
- SY/T 6170-1995Natural gas production technology index calculation method$150.00
- SY/T 6170-2005The technical indexes of natural gas production and relative calculation methods$120.00
- SY/T 6170-2012The technical indexes of natural gas production and relative calculation methods$374.00
- SY/T 6171-1995Gas reservoir production test specification$360.00
- SY/T 6171-2008The geological technical specification of production testing for gas reservoir$150.00
- SY/T 6171-2016The geological technical specification of production testing for gas reservoir$205.00
- SY/T 6172-1995Oil Well Test Technical Requirements$590.00
- SY/T 6172-2006Technical specification for well testing of oilfield$315.00
- SY/T 6172-2022Oilfield Well Testing Technical Specifications$315.00
- SY/T 6173-1995Petroleum reservoir rock porosity Types$225.00
- SY/T 6174-1995Terms of oil/gas field development technology$875.00
- SY/T 6174-2005Terms of oil/gas reservoir engineering$1,190.00
- SY/T 6174-2012Terms of oil/gas reservoir engineering$285.00
- SY/T 6175-1995Methods for physical property analysis of pressure-retained full-diameter cores$325.00
- SY/T 6176-1995Gas reservoir development wells to take information technology requirements$210.00
- SY/T 6176-2004Technical regulation of data collection on development well of gas reservoir$195.00
- SY/T 6176-2012Technical regulation of data collection on development well of gas reservoir$404.00
- SY/T 6177-1995Methods for economic evaluation of natural gas reservoir development programmes$390.00
- SY/T 6177-2000Economic evaluation method of development program for natural gas reservoir$270.00
- SY/T 6177-2009Economic evaluation requirements of overall development program and adjusting program for gas field$255.00
- SY/T 6177-2020Technical requirements for economic evaluation of gas field development plans and adjustment plans$390.00
- SY/T 6178-1996Specification for log interpretation of water-flooded reservoirs$205.00
- SY/T 6178-2000Specification for water flooded zone well logging data processing and interpreting$70.00
- SY/T 6178-2011Specification for water flooded zone well logging data processing and interpreting$165.00
- SY/T 6178-2017Specification for logging data processing and interpreting of water flooded zone$205.00
- SY/T 6179-1996The calibration procedure compensated neutron logging$225.00
- SY/T 6180-1996LOGGING operating procedures$205.00
- SY/T 6181-1996Beach Sea logging operations procedures$165.00
- SY/T 6181-2005The operating regulation on offshore logging and perforation$240.00
- SY/T 6182-1996The calibration procedure Production Profile Logging fluid density logging tool$165.00
- SY/T 6182-2008Calibration for logging tool on production well profile$405.00
- SY/T 6182-2021Calibration specification for production logging tool$619.00
- SY/T 6183-1996Code of information for petroleum transportation and sale$360.00
- SY/T 6183-2012Pipeline fascicle of data dictionary for petroleum$285.00
- SY/T 6184-2000Database table structure of oil field development$3,485.00
- SY/T 6184-2014Normalized attribute value for oil and gas exploration and development data items$2,548.00
- SY/T 6186-2020Safety Code for Oil and Gas Pipelines$180.00
- SY/T 6187-1997The scrapping condition for the operation of series 190 diesel engine for oil drilling rigs$225.00
- SY/T 6188-1996Analytical Method of Rock Pyrolysis by Gas Chromatography$105.00
- SY/T 6188-2016Analysis method for rock pyrolysis gas chromatography$165.00
- SY/T 6189-1996Quantitative Analysis of Energy Spectra for Minerals in Rocks$105.00
- SY/T 6189-2018Quantitative analysis method for rock minerals by X-ray energy spectrum (EDS)$95.00
- SY/T 6190-1996Beam pumping unit reliability assessment specification$225.00
- SY/T 6191-1996Heavy oil reservoir description of the technical requirements$225.00
- SY/T 6192-1996Drilling engineering information code$480.00
- SY/T 6192-2012Data item name standard for petroleum drilling engineering$285.00
- SY/T 6193-1996Heavy oil steam injection calibration method developed recoverable reserves$225.00
- SY/T 6194-1996Casing and tubing$1,880.00
- SY/T 6196-1996Rock chloroform extracts and aromatic oil gas chromatographic analysis method$225.00
- SY/T 6197-1996Drilling and coring tool classification model representation$225.00
- SY/T 6198-1996Wellhead Tools for Unscrewing by Explosion$225.00
- SY/T 6199-1996Basic technical requirements for drilling facilities$70.00
- SY/T 6199-2004Drilling rig foundation specification$240.00
- SY/T 6200-1996Oriented coring tools$225.00
- SY/T 6201-1996The basic method is preferred drilling parameters$225.00
- SY/T 6202-1996Wellsite drilling of oil, water and heating system installation technical requirements$285.00
- SY/T 6202-2013Requirement for installation of oil, water, power and heating systems at wellsite$274.00
- SY/T 6203-1996Oil and gas well blowout fire and rescue practice$90.00
- SY/T 6203-2007Wrecking method for oil and gas well blowout and fires$105.00
- SY/T 6203-2014Wrecking method for oil and gas well blowout and fire$159.00
- SY/T 6203-2024Rescue measures for oil and gas well blowout and fire$120.00
- SY/T 6205-1996Technical Conditions for Compound Geochemical and Gas Logging Instruments$135.00
- SY/T 6205-2024Technical requirements for geochemical logging instrument$270.00
- SY/T 6206-1996General Technical Conditions for Digital Control Well Logging Tool Series$225.00
- SY/T 6209-1996Complex fault block oilfield development programming technical requirements$225.00
- SY/T 6210-1996The total amount of clay minerals in sedimentary rocks and common non-clay minerals X-ray diffraction method for quantitative analysis$225.00
- SY/T 6211-1996Shallow seismic refraction work quota$240.00
- SY/T 6211-2012Labor quota for LVL and uphole survey$105.00
- SY/T 6211-2021Surface survey seismic exploration labor quota$224.00
- SY/T 6212-1996Labor quota gas logging project$225.00
- SY/T 6213-1996Technical conditions for fluoroboric acid for acidification$85.00
- SY/T 6213-2016Fluoroboric acid for acidizing$165.00
- SY/T 6214-1996Evaluation method for acid densifier$105.00
- SY/T 6214-2016Gelling agent for viscous acid$135.00
- SY/T 6216-1996Test Method of Cross-linkers for Fracturing$234.00
- SY/T 6217-1996Pipeline oil equipment maintenance work quota$920.00
- SY/T 6217-2010Work quota for transportation equipment repairing of long-distance transportation pipelines$800.00
- SY/T 6217-2018Long-distance pipeline oil transportation equipment maintenance labor quota$815.00
- SY/T 6218-1996Directional window casing section milling and operating methods$70.00
- SY/T 6218-2010Operation of casing section mill and whipstock$105.00
- SY/T 6218-2019Casing window and side drilling operation method$264.00
- SY/T 6219-1996Grading of Development Status of Oil Fields$165.00
- SY/T 6219-2023Oilfield development level classification$315.00
- SY/T 6220-1996Calculation method for recoverable reserves of solution gas in oil reservoirs$325.00
- SY/T 6221-1996Oilfield development monitoring system design and dynamic monitoring of the technical requirements$225.00
- SY/T 6222-1996External casing packer$150.00
- SY/T 6222-2012External casing paker$345.00
- SY/T 6223-1996Solids control equipment installation, use and maintenance$205.00
- SY/T 6223-2005Drilling fluid clarifying equipment arrangement, installation, operation and maintenance$135.00
- SY/T 6224-1996Technical requirement for compilation of development plan project gas--condensate field$225.00
- SY/T 6225-1996Technical requiremet for analysis of oilfield performance$105.00
- SY/T 6225-2018Technical specification for analysis of oilfield performance$185.00
- SY/T 6226.1-1996Oil spare valve pneumatic components - Part 1: Manual Valve$225.00
- SY/T 6226.2-1996Oil drilling equipment valve pneumatic components - Part 2: Pneumatic valve$225.00
- SY/T 6227-1996Petroleum industry database design specifications$420.00
- SY/T 6227-2005Petroleum industry database design specifications$659.00
- SY/T 6228-1996Recommended Practices for Occupational Safety Oil and Gas Well Drilling and Servicing Operations$530.00
- SY/T 6229-1996Training for initial fire attack$405.00
- SY/T 6229-2007Standard on training for initial emergency scene operations(NFPA 1410: 2000, IDT)$390.00
- SY/T 6229-2014Standard on training for initial emergency scene operations$239.00
- SY/T 6229-2024Initial firefighting training procedures$135.00
- SY/T 6231-1996Electronic downhole pressure gauge$135.00
- SY/T 6231-2006Electronic downhole pressure gauge$135.00
- SY/T 6231-2019Oil downhole pressure gauge$334.00
- SY/T 6232-1996Petroleum core analysis experimental equipment classification$225.00
- SY/T 6233-1996Trial operation of natural gas pipeline specifications$135.00
- SY/T 6233-2002Commissioning and start - up code for gas transmission pipeline$240.00
- SY/T 6234-1996Buried Pipeline overall heat transfer coefficient of determination of the heat balance method$165.00
- SY/T 6234-2003Determination of gross heat transfer factor for the buried pipeline$225.00
- SY/T 6235-1996General Technical Conditions of Surface Instruments for Digital Control Well Logging$225.00
- SY/T 6236-1996Code of information for reservoir engineering$435.00
- SY/T 6236-2012The specification for names of data for oil reservoir engineering$1,479.00
- SY/T 6237-1996Downhole equipment repair work quota$225.00
- SY/T 6237-2010Labour quota for repair of downhole service equipment$195.00
- SY/T 6237-2024Labor quota for repairing underground equipment$485.00
- SY/T 6238.1-1996OCTG full-scale test methods. Casing collapse trial$225.00
- SY/T 6238.2-2002Procedures of full scale test for oil country tubular goods Makeup/breakout tests for casing and tubing connections$240.00
- SY/T 6240-1996Chemical analgsis method of barite$405.00
- SY/T 6240-2008Chemical analysis method of barite$525.00
- SY/T 6240-2016Barite chemical analysis Recommended Practice$680.00
- SY/T 6241-1996Cluster wells wellsite layout principles and requirements$225.00
- SY/T 6243-1996The engineering logging specification of hydrocarbon exploratory well$135.00
- SY/T 6243-2009Specifications for wellsite drilling monitoring of oil and gas exploration well$135.00
- SY/T 6244-1996Design regulations for well site of oil and gas exploratory well$144.00
- SY/T 6246-1996Vibrator service and maintenance$90.00
- SY/T 6246-2003Vibrator service and maintenance$105.00
- SY/T 6246-2014Vibrator service and maintenance.$299.00
- SY/T 6246-2022Technical specifications for the use of vibrators$210.00
- SY/T 6247-1996Technical specification of 3D seismic exploration for mountainous area$355.00
- SY/T 6247-2003Technical specification of 3D seismic exploration data acquisition for mountainous area$240.00
- SY/T 6248-1996Technical code for use and maintenance of total stations$325.00
- SY/T 6249-1996Operation and maintenance for proton magnetometer$85.00
- SY/T 6249-2005Operation and maintenance for magnetometer$240.00
- SY/T 6250-1996Specification of density logging calibration devices$225.00
- SY/T 6252-1996Specification of induction logging calibrating devive$85.00
- SY/T 6252-2012Technical specifications for induction logging tool calibration and calibration device$345.00
- SY/T 6253-1996Specific regulations for horizontal well perforation$229.00
- SY/T 6253-2007Specification of horizontal well perforation$150.00
- SY/T 6253-2016The technical specifications for horizontal well perforating operation$289.00
- SY/T 6254-1996Use and maintenance of side wall coring gun$165.00
- SY/T 6255-1996Use and maintenance of sidewall core gun$225.00
- SY/T 6257-1996Injection and production wells steam stimulation process design$105.00
- SY/T 6257-2010Injection and production technology project design for steam huff and puff$105.00
- SY/T 6257-2024Design of steam injection and production process scheme$240.00
- SY/T 6258-1996Practice for design calculations for sucker rod pumping systems (conventional units)$470.00
- SY/T 6258-2017Design calculations for sucker rod pumping systems(conventional units)$600.00
- SY/T 6259-1996Gas Mining Technical Specification$225.00
- SY/T 6261-1996Injection well pressure drop data analysis method explained$225.00
- SY/T 6262-1996Process specification test gas wells$225.00
- SY/T 6264-1996Oil wells overhaul operations engineering preparation of specifications$150.00
- SY/T 6264-2006Specifications of major repair project design for oil, gas, water well$165.00
- SY/T 6264-2019Code for writing design of oil and gas well overhaul$314.00
- SY/T 6265-1996Diagnosis Method for Performance of Rod Pumped Wells$135.00
- SY/T 6265-2016Diagnosis Method of Pumping Well Condition$240.00
- SY/T 6266-1996Low fiberglass pipeline$330.00
- SY/T 6266-2004Low pressure fiberglass line pipe and fittings$360.00
- SY/T 6266-2024Low Pressure Fiberglass Line Pipe and Fittings$480.00
- SY/T 6267-1996High-pressure fiberglass line pipe$330.00
- SY/T 6267-2006Specification for high pressure fiberglass line pipe$405.00
- SY/T 6267-2018High-pressure fiberglass line pipe$505.00
- SY/T 6268-1996Oil casing with the recommended practice$270.00
- SY/T 6268-2008Recommended practice for selection and use of casing and tubling$270.00
- SY/T 6268-2017Recommended practice for selection and use of oil country tubular goods$285.00
- SY/T 6269-1996Common terms on energy conservation management in petroleum enterprise$165.00
- SY/T 6269-2004Common terms of energy and water conservation in petroleum enterprises$135.00
- SY/T 6269-2010Common terms of energy and water conservation in petroleum enterprise$255.00
- SY/T 6270-1997Use and maintenance of oil drilling pressure manifold parts$165.00
- SY/T 6270-2012Operation, maintenance, repair and inspection of high pressure manifolds for drilling and production operation$195.00
- SY/T 6270-2017Petroleum natural gas drilling and production equipment. Operation and maintenance of cementing and fracturing manifold$315.00
- SY/T 6272-1997Supper-strength sucker rod$225.00
- SY/T 6273-1997Testing method of electric detonators for oil and gas well$270.00
- SY/T 6273-2008Testing method of electric detonators for oil and gas well$135.00
- SY/T 6273-2016Detection Method of Electric Detonator for Oil and Gas Well$485.00
- SY/T 6273-2024Explosive equipment for oil and gas wells$485.00
- SY/T 6274-1997Testing method of detonating cord for oil and gas well$225.00
- SY/T 6275-1997Comprehensive evaluation method for monitering and testing of energy conservation in petroleum enterprise$135.00
- SY/T 6276-1997Petroleum and natural gas industries--Health, safety and environmental management systems$720.00
- SY/T 6276-2010Petroleum and natural gas industries - Health,safety and environmental management systems$255.00
- SY/T 6276-2014Petroleum and natural gas industries health, safety and environmental management systems$495.00
- SY/T 6276-2025Oil and gas industry - Health, Safety and Environmental Management System$360.00
- SY/T 6277-2005Specification of hydrogen sulfide monitoring and protecting for operation personnel in oil and gas field involving hydrogen sulfide$75.00
- SY/T 6277-2017Code for personal protection in hydrogen sulfide environment$265.00
- SY/T 6279-2016Safety code for lifting large equipment$225.00
- SY/T 6279-2022Safety regulations for hoisting large equipment$300.00
- SY/T 6280-1997Health, safety and environmental management specification for seismic crew$1,470.00
- SY/T 6280-2006Health, safety and environment management specification for seismic crew$240.00
- SY/T 6283-1997Health, safety and environment management system guideline for oil and gas drilling$225.00
- SY/T 6284-1997Dividing and monitoring code of harmful workplaces in petroleum enterprise$85.00
- SY/T 6284-2008Monitoring and evaluating specification of occupational hazards work site in petroleum enterprise$120.00
- SY/T 6284-2016Oil companies occupational hazards monitoring technical specifications$225.00
- SY/T 6284-2022Identification and protection specifications of occupational disease hazard factors in petroleum enterprises$405.00
- SY/T 6285-1997Evaluating methods of oil and gas reservoirs$240.00
- SY/T 6285-2011Evaluating methods of oil and gas reservoirs$285.00
- SY/T 6286-1997Detail description method for carbonate reservoir$225.00
- SY/T 6287-1997Determination method of oil well productivity index$225.00
- SY/T 6288-1997Practice for selection and use of drill pipe and drill collar$285.00
- SY/T 6289-1997Technical specifications for continuous electromagnetic profiling method$195.00
- SY/T 6289-2006Technical specifications for continuous electromagnetic profiling$240.00
- SY/T 6290-1997Shell processing support format for land 3-D surveys$1,180.00
- SY/T 6290-2011Seismic exploration ancillary data SPS format$930.00
- SY/T 6290-2018Seismic exploration ancillary data SPS format$940.00
- SY/T 6291-1997The technical specification of GPS kinematic surveys in the oil geophysical exploration$225.00
- SY/T 6292-1997Criteria for interpretation and qualification of exploration well-testing data$240.00
- SY/T 6292-2008Specification for interpretation of exploration well test data$360.00
- SY/T 6293-1997Specifications of well testing in exploration$150.00
- SY/T 6293-2008Specifications of well testing in exploration$195.00
- SY/T 6293-2021Specification for exploration and testing$384.00
- SY/T 6294-1997Specifications of collecting analytical sample for oil and gas exploration well in the wellsite$55.00
- SY/T 6294-2008Specifications of collecting analytical sample for oil and gas exploration well in the wellsite$70.00
- SY/T 6295-1997The reliability prediction on equipment of oil field drilling and production$165.00
- SY/T 6295-2006The reliability, maintainability prediction on equipment of oil field drilling and production$360.00
- SY/T 6296-1997Determination of the strength of polymer gels used for oil production. Method on rheological parameters$269.00
- SY/T 6296-2013Determination of the strength of gels used for oil production. Test method on rheological parameters$224.00
- SY/T 6300-1997General specification of paraffin inhibition and removal agent for the use of oil production$435.00
- SY/T 6300-2009Specifications of paraffin removers and paraffin inhibitors applied in oil production$225.00
- SY/T 6300-2024Technical requirements for cleaning and paraffin inhibitors for oil production$345.00
- SY/T 6301-1997General technical specification of corrosion inhibiter for produced water of oil field$225.00
- SY/T 6302-1997Recommended practice for evaluating short term proppant pack conductivity$285.00
- SY/T 6302-2009Recommended practices for evaluating short term proppant pack conductivity$255.00
- SY/T 6302-2019Test method for fracturing proppant conductivity$589.00
- SY/T 6304-1997Technical standard of thermal packer and expansion joint$349.00
- SY/T 6304-2013Technical standard of thermal packer and expansion joint$345.00
- SY/T 6306-1997Fighting fires in and around flammable and combustible liquid atmospheric storage tanks$510.00
- SY/T 6306-2008Management of atmospheric storage tank fire$695.00
- SY/T 6306-2020Operational Safety Code for Steel Crude Oil Storage Tanks$240.00
- SY/T 6307-2016The drilling safety provisions in the beach-shallow water$285.00
- SY/T 6307-2022Shallow Sea Drilling Safety Regulations$210.00
- SY/T 6308-1997Recommended practice for oilfield explosives safety$195.00
- SY/T 6308-2012Recommended practice for oilfield explosives safety$534.00
- SY/T 6310-1997Regulation for conceptual development design in gas field$325.00
- SY/T 6310-2006Technical requirements for feasible evaluation of gas field development$70.00
- SY/T 6310-2013Technical reguirements for feasible evaluation of gas field development$174.00
- SY/T 6311-1997The technical requirements of steamflooding three-dimensional scaled physical modelling experiment$210.00
- SY/T 6311-2012The technical requirements of high temperature and high pressure three-dimensional scaled physical modeling experiment for steam recovery$435.00