Issued by

Ministry of Industry and Information Technology of the PRC 3.No action is required - Full-copy of this standar

Level / Type

National · Recommended

Issue date

April 25, 2013

Implementation date

June 1, 2013

Scope

YD/T 983-2013 (Limits and methods of measurement of electromagnetic compatibility of telecommunicatin power supply equipment) is available as an English-translated PDF.

YD/T 983-2013 — This Standard specifies the electromagnetic compatibility requirements for telecommunication power supply equipment (hereinafter referred to as TPE, excluding UPS, generator and battery), including limits, performance criteria and measurement methods, etc. This Standard applies to the power supply equipment for telecommunication switching equipment, telecommunication transmission equipment and wireless communication equipment.

Found what you need?

Document preview — YD/T 983-2013

National Standard of the People's Republic of China

ICS
33.100
Classification
L 06

Issued by: Ministry of Industry and Information Technology of the PRC 3.No action is required - Full-copy of this standar

Contents

  • Foreword...3
  • 1 Scope..4
  • 2 Normative references...4
  • 3 Terms, definitions and abbreviations...5
  • 3.1 Terms and definitions..5
  • 3.2 Abbreviations...6
  • 4 Test conditions..7
  • 4.1 General conditions...7
  • 4.2 Test layouts...8
  • 5 Performance evaluation methods...10
  • 5.1 General...10
  • 5.2 Methods applicable for the evaluation of ancillary equipment..10
  • 6 Performance criteria...11
  • 6.1 Determination criterion A...11
  • 6.2 Determination criterion B...11
  • 6.3 Determination criterion C...11
  • 6.4 Special determination criteria...11
  • 7 Applicability..12
  • 7.1 Disturbance measurement...12
  • 7.2 Immunity test...12
  • 8 Disturbance measurement methods and limits...14
  • 8.1 Conducted disturbance...14
  • 8.2 Radiation disturbance..14
  • 8.3 Harmonic current (AC power supply input port)...14
  • 8.4 Voltage fluctuation and flicker (AC power supply input port)...14
  • 9 Immunity test methods and levels...15
  • 9.1 Telecommunication centers..15
  • 9.2 Other-than-telecommunication centers..17

Foreword

This Standard is drafted in accordance with the rules given in GB/T 1.1-2009.

This Standard is developed and mainly referenced to GB 9254 "Limits and methods of

measurement of radio interference characteristics of information technology

equipment", GB/T 17618 "Information technology equipment - Immunity characteristics

- Limits and methods of measurement", GB 19286 "Electromagnetic compatibility

requirement and measurement methods for telecommunication network equipment".

This Standard replaces YD/T 983-1998 "Limits and methods of measurement of

electromagnetic compatibility for telecommunication Power supply equipment" from

the date of implementation.

Compare with YD/T 983-1998, the main changes of this Standard are as follows.

- SPECIFY that the telecommunication power supply equipment in this Standard

does not include UPS (see Clause 1);

- ADD the frequency range of 1 GHz ~ 6 GHz for radiation disturbance test (see

8.2).

- MODIFY the classification and limits of harmonic current equipment (see 8.3);

- EXPAND the frequency range of radiated, radio-frequency, electromagnetic field

immunity to 2.7 GHz (see Clause 9);

- SPECIFY the immunity level of telecommunication power supply equipment in

telecommunication centers and other-than-telecommunication centers (see

Clause 9).

Attention is drawn to the possibility that some of the contents of this document may be

the subject of patent rights. The issuing agency of this document shall not be held

responsible for identifying any or all of such patent rights.

This Standard was proposed by and shall be under the jurisdiction of China

Communications Standards Association.

This Standard is drafted by Telecommunication Research Institute of the Ministry of

Industry and Information Technology of the People's Republic of China.

Main drafters of this Standard. Tang Weisheng, Zhou Yi, Zhang Yunzhuan, Lu

Bingsong.

This Standard was first issued on October 28, 1998.This is the first revision.

Limits and methods of measurement of

electromagnetic compatibility of

telecommunication power supply equipment

1 Scope

This Standard specifies the electromagnetic compatibility requirements for

telecommunication power supply equipment (hereinafter referred to as TPE, excluding

UPS, generator and battery), including limits, performance criteria and measurement

methods, etc.

This Standard applies to the power supply equipment for telecommunication switching

equipment, telecommunication transmission equipment and wireless communication

equipment.

2 Normative references

The following referenced documents are indispensable for the application of this

document. For dated references, only the dated edition cited applies. For undated

references, the latest edition of the referenced document (including all amendments)

applies.

GB 9254 Limits and methods of measurement of radio interference characteristics

of information technology equipment

GB 17625.1 Electromagnetic compatibility - Limits - Limits for harmonic current

emissions (equipment input current <= 16 A per phase)

GB 17625.2 Electromagnetic compatibility (EMC) - Limits - Limitation of voltage

changes, voltage fluctuations and flicker in public low-voltage supply systems, for

equipment with rated current <=16 A per phase and not subject to conditional

connection

GB/T 17626.2 Electromagnetic compatibility (EMC) - Testing and measurement

techniques - Electrostatic discharge immunity test

GB/T 17626.3 Electromagnetic compatibility - Testing and measurement techniques

- Radiated, radio-frequency, electromagnetic field immunity test

GB/T 17626.4 Electromagnetic compatibility - Testing and measurement techniques

EMC ElectroMagnetic Compatibility

EUT Equipment Under Test

TPE Telecommunication Power Supply Equipment

UPS Uninterrupted Power Supply

4 Test conditions

4.1 General conditions

The TPE shall be tested under normal test conditions. The test conditions shall be

recorded in the report.

Regardless whether the TPE requires special software or test fixtures to connect to

the host equipment, the test layout shall be as close to the normal or typical actual

operation state as possible.

The test conditions of the TPE shall be as close to the actual installation conditions as

possible, and the wiring shall be consistent with the actual process. If the TPE is to be

installed in a rack or an enclosure as specified by the manufacturer, unless otherwise

stated, the TPE shall be installed according to the method stated in the instructions or

the installation manual.

If the equipment is part of the system or is connected to the ancillary equipment, the

equipment shall be connected to the ancillary equipment of the minimum typical

configuration during the test, however, the port connected to the ancillary equipment

shall be activated.

If the equipment has a large number of ports, it shall select a sufficient number of ports

to ensure that the actual situation can be simulated and that different types of ports

can be tested.

If the TPE consists of multiple telecommunication power supply modules, each

telecommunication power supply module shall be tested.

Measures shall be taken to avoid the effects of immunity test signals on the measuring

equipment and test ancillary equipment (e.g. signal sources, ancillary equipment, etc.)

located inside/outside the test environment. Measures shall be taken to avoid the

effects of auxiliary test equipment located inside/outside the test environment on the

test result.

During the test, the mode of operation and configuration shall be accurately recorded

in the test report.

Unless otherwise specified in the product instructions, the TPE shall be connected to

the resistive load.

The signal or control port shall be properly connected with the necessary AE or nominal

resistance.

The test shall be carried out under the condition of inputting the nominal voltage to the

input port.

4.2.2 Immunity test conditions and layouts

All tests shall be carried out under normal installation conditions of the TPE. The

distribution of power supply lines and signal lines, grounding, interconnection of cables

and the physical layout of the test system shall simulate typical and actual application

state and shall comply with the product instructions.

For the TPE subjected to the immunity test, it shall be powered on and working in

normal mode. The test shall be carried out under conditions such as specified

configuration, typical load configuration (including hardware, software and operating

procedures) and full operation.

It shall choose a configuration that minimizes the immunity. It shall consider the

possible layouts within the range of normal use.

The test shall be carried out under the condition of inputting the nominal voltage to the

input port.

Unless otherwise specified in the product instructions, the TPE shall be connected to

the resistive load.

The signal or control port shall be properly connected with the necessary AE or nominal

resistance.

During the test, the TPE may operate at a state of small output power (50 % of output

power is recommended). The actual output power of the TPE in the test shall be stated

in the test report.

The immunity to conducted disturbances test shall be carried out on the power supply

input port, power supply output port, and one port of each type of control ports on the

TPE.

Power supply lines and control line of not more than 3 m (according to the product

instructions) require no immunity test. However, the cables connected to the external

network shall be tested.

Internal connection cables between units on the same TPE need not be tested.

To test the TPE's ability to withstand malfunctions and damage to work, the design

6 Performance criteria

The TPE port being monitored during the test may be divided into the following

categories.

a) Grade 2 power supply DC port. refers to the DC uninterruptible power supply port

(basic power supply DC port).

b) Grade 2 power supply AC port. refers to the AC uninterruptible power supply port

(basic power supply AC port).

c) Grade 3 power supply port. refers to the power supply device port (rack power

supply port) in the telecommunication equipment.

d) Control signal interface

6.1 Determination criterion A

a) During the EMC test of the equipment, the TPE output voltage shall be within the

normal working range.

b) During and after the test of the equipment, the TPE shall operate normally, and

there shall be no alarm, false alarm indication (power failure, protective failure,

etc.) or error display indication.

6.2 Determination criterion B

a) After the equipment is tested, the TPE shall work normally, and the output voltage

shall immediately be within the normal working range.

b) After the equipment is tested, the TPE shall work normally, and there shall be no

alarm, false alarm indication (power failure, protective failure, etc.) or error

display indication.

6.3 Determination criterion C

The equipment allows loss of monitoring and alarm functions, however, after the

equipment is tested, all functions shall be back to normal, and the output voltage shall

be within the normal working range.

6.4 Special determination criteria

Special determination criteria are applicable for the Grade 2 DC output port and Grade

2 AC output port.

6.4.1 Grade 2 DC output port

Immunity to conducted

disturbances, induced by radio-

frequency fields

9.2.5.2

8 Disturbance measurement methods and limits

8.1 Conducted disturbance

8.1.1 Signal line port

Measurement methods and limits are in accordance with the provisions of GB 9254.

8.1.2 Power supply port

Measurement methods and limits are in accordance with the provisions of GB 9254.

8.2 Radiation disturbance

Measurement methods and limits are in accordance with the provisions of GB 9254.

8.3 Harmonic current (AC power supply input port)

8.3.1 Measurement methods

For equipment with input current <= 16 A per phase, measure according to GB 17625.1.

For equip...

......

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.

Referenced standards

How to Download YD/T 983-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
17 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

YD/T 983-2013

$125.00