SY/T 5587.14-2004Conventional workover procedures - Part 14: Note plug, drill plug (English PDF)
常规修井作业规程 第14部分:注塞、钻塞
SY/T 5587.14 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| SY/T 5587.14-2013 | Codes for Conventional Workover Job - Part 14:Cementing Pug and Drilling Out | Valid |
| SY/T 5587.14-2004 | Conventional workover procedures - Part 14: Note plug, drill plug | Obsolete |
SY/T 5587.14-2004 is obsolete. It has been replaced by SY/T 5587.14-2013. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for SY/T 5587.14-2004 in 30 minutes.
Issued by
National Development and Reform Commission
Level / Type
National · Recommended
Issue date
July 3, 2004
Implementation date
November 1, 2004
Scope
SY/T 5587.14-2004 is the English-translated version of 常规修井作业规程 第14部分:注塞、钻塞.
SY/T 5587.14-2004 is the Chinese industry standard "Conventional workover procedures - Part 14: Note plug, drill plug". It was issued on July 3, 2004 by the National Development and Reform Commission, and took effect on November 1, 2004. It is obsolete: it has been replaced by SY/T 5587.14-2013.
Found what you need?
Document preview — SY/T 5587.14-2004
National Standard of the People's Republic of China
Issued by: National Development and Reform Commission
Contents
- Document data
1 Document data
Sector: Petroleum & Gas (industry standard).
Issuing body: National Development and Reform Commission.
Date of issue: 2004-07-03.
Date of implementation: 2004-11-01.
Status: obsolete, replaced by SY/T 5587.14-2013.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
How to Download SY/T 5587.14-2004
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SY/T 5587.12-1993 — Conventional oil wells, workover operations. Pump method salvage operations
SY/T 5587.12-2018 — Codes for conventional workover job. Part 12: Releasing and fishing
SY/T 5587.11-1993 — Conventional oil wells, workover operations. Drillable packer drilling and milling technology practice
Secure payment via Stripe
Payments accepted
SY/T 5587.14-2004
$135.00