NB/T 10423-2020Technical specifications for temporary closure and abandonment of coalbed methane wells (English PDF)
煤层气井临时封井和废弃处置技术规范
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 10423-2020 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
October 23, 2020
Implementation date
February 1, 2021
Scope
NB/T 10423-2020 is the English-translated version of 煤层气井临时封井和废弃处置技术规范.
NB/T 10423-2020 is a recommended Chinese energy industry standard for the temporary closure and the abandonment of coalbed methane wells.
It sets out the disposal methods for both cases together with the record filing that goes with them, describes the sequence of operations to be followed, and gives the quality requirements the finished work has to meet.
It applies to the design and to the construction operations of temporary closure and abandonment disposal. The standards it calls up are GB/T 14902, SY/T 5587.5-2018, SY/T 5587.14-2013, SY/T 6646-2017, SY/T 6690, SY/T 6818 and SY/T 6922. Issued on 23 October 2020, it has applied since 1 February 2021.
Found what you need?
Document preview — NB/T 10423-2020
National Standard of the People's Republic of China
- ICS
- 75.020
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 10423-2020 cites the following standards, which apply in full or in part through the references made to them in its clauses.
GB/T 14902
SY/T 5587.5-2018
SY/T 5587.14-2013
SY/T 6646-2017
SY/T 6690
SY/T 6818
SY/T 6922
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 14902Ready-mixed concrete
- SY/T 5587.5-2018Codes for conventional workover job - Part 5: Wellbore preparation for downhole operation
- SY/T 6646-2017Well abandonment and inactive well practices
- SY/T 6690Technical regulations for well control of underground operations
SY/T 5587.14-2013 · SY/T 6818 · SY/T 6922
Similar standards
How to Download NB/T 10423-2020
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 14902-2012 — Ready-mixed concrete
SY/T 5587.5-2018 — Codes for conventional workover job - Part 5: Wellbore preparation for downhole operation
SY/T 6646-2017 — Well abandonment and inactive well practices
Secure payment via Stripe
Payments accepted
NB/T 10423-2020
$150.00