DL/T — Electricity & Power
Found: 2930 — page 54 of 62
Valid
DL/T 753-2015 — Technical guide for repair welding of cast steel parts in steam turbine
National·Recommended
Instant delivery (0–9 sec)
$195.009 pages
Valid
DL/T 774-2015 — Overhaul and maintenance code of IC system in thermal power plant
National·Recommended
Instant delivery (0–9 sec)
$2,525.00123 pages
Valid
DL/T 803-2015 — Blankets of Insulating Material for Live Working
National·Recommended
Instant delivery (0–9 sec)
$285.0014 pages
Valid
DL/T 831-2015 — Guide on selection of furnace characteristic parameters for large pulverized coal fired boilers
National·Recommended
Instant delivery (0–9 sec)
$510.0019 pages
Valid
DL/T 842-2015 — Application specification of low-voltage shunt capacitor installation
National·Recommended
Instant delivery (0–9 sec)
$530.0037 pages
Valid
DL/T 853-2015 — Insulating pads for live working
National·Recommended
Instant delivery (0–9 sec)
$240.0013 pages
Valid
DL/T 859-2015 — Artificial pollution tests on composite insulators used on high-voltage AC systems
National·Recommended
Instant delivery (0–9 sec)
$315.0015 pages
Valid
DL/T 866-2015 — Code for selection and calculation of current transformer and voltage transformer
National·Recommended
Instant delivery (0–9 sec)
$2,660.00139 pages
Valid
DL/T 889-2015 — Guideline for chemistry supervision of thermal equipments during power station capital construction
National·Recommended
Instant delivery (0–9 sec)
$225.007 pages
Valid
DL/T 904-2015 — Calculating method of economical and technical index for thermal power plant
National·Recommended
Instant delivery (0–9 sec)
$405.0028 pages
Valid
DL/T 943-2015 — Measurement of dissolution rate of limestone powder used in wet flue gas desulfurization
National·Recommended
Instant delivery (0–9 sec)
$70.006 pages
Valid
DL 5009.1-2014 — Code of safety operation in power engineering construction. Part 1: Steam power
National·Mandatory
Instant delivery (0–9 sec)
$3,275.00186 pages
Valid
DL 5068-2014 — Code for design of chemistry of power plant
National·Mandatory
Instant delivery (0–9 sec)
$1,400.00116 pages
Valid
DL 5319-2014 — Code for construction and acceptance of large crossing overhead transmission line
National·Mandatory
Instant delivery (0–9 sec)
$830.0051 pages
Valid
DL 5320-2014 — Construction technology guidance for the tension stringing of large crossing overhead transmission line
National·Mandatory
Instant delivery (0–9 sec)
$875.0023 pages
Valid
DL/T 1033.11-2014 — Electric power standard thesaurus. Part 11: Accidents, protection, safety and reliability
National·Recommended
Instant delivery (0–9 sec)
$345.0021 pages
Valid
DL/T 1033.3-2014 — Electric power standard thesaurus. Part 3: Power plant, hydroelectric power generation
National·Recommended
Instant delivery (0–9 sec)
$435.0025 pages
Valid
DL/T 1033.5-2014 — Electric power standard thesaurus. Part 5: Nuclear power generation
National·Recommended
Instant delivery (0–9 sec)
$640.0025 pages
Valid
DL/T 1033.6-2014 — Electric power standard thesaurus. Part 6: New energy power generation
National·Recommended
Instant delivery (0–9 sec)
$255.0011 pages
Valid
DL/T 1316-2014 — Guide on design and operation of ignition system with less oil for pulverized coal-fired power boilers
National·Recommended
Instant delivery (0–9 sec)
$195.009 pages
Valid
DL/T 1319-2014 — Guide of measuring points arrangement for circulating fluidized bed boilers
National·Recommended
Instant delivery (0–9 sec)
$285.0013 pages
Valid
DL/T 1321-2014 — Standards for sturcture and identifier in dam safety monitoring databse
National·Recommended
Instant delivery (0–9 sec)
$300.0015 pages
Valid
DL/T 1322-2014 — Guide of cold and combustion adjustment tests for circulating fluidized bed boilers
National·Recommended
Instant delivery (0–9 sec)
$330.0017 pages
Valid
DL/T 1323-2014 — Guide for measurement of wide-frequency AC voltage withstand test on site
National·Recommended
Instant delivery (0–9 sec)
$195.009 pages
Valid
DL/T 1324-2014 — The technical guide for the inner wall scale stacking magnetic inspection of austenite stainless steel boiler tube
National·Recommended
Instant delivery (0–9 sec)
$135.001 pages
Valid
DL/T 1325-2014 — Repairation and protection technical guidelines for erosion damage of steam turbines passage components
National·Recommended
Instant delivery (0–9 sec)
$240.0011 pages
Valid
DL/T 1326-2014 — Guide for 300MW circulating fluidized bed boiler operation
National·Recommended
Instant delivery (0–9 sec)
$665.0043 pages
Valid
DL/T 1327-2014 — Method of high-voltage alternating current transformer substation audible noise measurement
National·Recommended
Instant delivery (0–9 sec)
$165.008 pages
Valid
DL/T 1328-2014 — Statistical indicator frame of carbon dioxide emission for coal-fired power plants
National·Recommended
Instant delivery (0–9 sec)
$165.008 pages
Valid
DL/T 1329-2014 — Realtime online economical performance monitoring guidelines for thermal power plants
National·Recommended
Instant delivery (0–9 sec)
$135.007 pages
Valid
DL/T 1330-2014 — Effect evaluation guidelines for power demand side management program
National·Recommended
Instant delivery (0–9 sec)
$135.007 pages
Valid
DL/T 1333-2014 — Guidelines for implementation and evaluation of standard system in fossil fuel power plants
National·Recommended
Instant delivery (0–9 sec)
$520.0019 pages
Valid
DL/T 1334-2014 — Piezoresistive sensor readout box
National·Recommended
Instant delivery (0–9 sec)
$120.007 pages
Valid
DL/T 1335-2014 — Piezoresistive presure
National·Recommended
Instant delivery (0–9 sec)
$165.008 pages
Valid
DL/T 1336-2014 — Technical requirement of PV power supply for electric power communication station
National·Recommended
Instant delivery (0–9 sec)
$285.0013 pages
Valid
DL/T 1337-2014 — Guidelines of the water management for fossil fuel power plants
National·Recommended
Instant delivery (0–9 sec)
$195.009 pages
Valid
DL/T 1338-2014 — Specification of real-time supervision and management information system for power generation enterprises
National·Recommended
Instant delivery (0–9 sec)
$125.0021 pages
Valid
DL/T 1339-2014 — Performance test code on crushing-dividing combined sample preparation equipment at coal-fired power plants
National·Recommended
Instant delivery (0–9 sec)
$180.009 pages
Valid
DL/T 1341-2014 — Technical guide for live working on 660kV DC transmission tine
National·Recommended
Instant delivery (0–9 sec)
$135.007 pages
Valid
DL/T 1342-2014 — Specifications for electrical grounding engineering materials and connection
National·Recommended
Instant delivery (0–9 sec)
$520.0019 pages
Valid
DL/T 1344-2014 — Technical specification for connecting disturbing customer to power system
National·Recommended
Instant delivery (0–9 sec)
$175.009 pages
Valid
DL/T 1347-2014 — General specification for AC filter protection equipment
National·Recommended
Instant delivery (0–9 sec)
$240.0011 pages
Valid
DL/T 1348-2014 — General Technical Conditions for Automatic Quasi-synchronizing Device
National·Recommended
Instant delivery (0–9 sec)
$435.0025 pages
Valid
DL/T 1349-2014 — General specification for circuit breaker protection equipment
National·Recommended
Instant delivery (0–9 sec)
$145.008 pages
Valid
DL/T 1350-2014 — General specification for fault separation equipment of substation
National·Recommended
Instant delivery (0–9 sec)
$175.009 pages
Valid
DL/T 1352-2014 — Technical guideline of power emergency command center
National·Recommended
Instant delivery (0–9 sec)
$195.0010 pages
Valid
DL/T 1354-2014 — The method of flash point of power oil by microscale continuously closed cup tester
National·Recommended
Instant delivery (0–9 sec)
$115.007 pages
Valid
DL/T 1355-2014 — Method for determination of furfural content in transformer oil by HPLC
National·Recommended
Instant delivery (0–9 sec)
$135.006 pages