Valid

DL/T 1338-2014Specification of real-time supervision and management information system for power generation enterprises (English PDF)

发电企业生产实时监管信息系统技术条件

Preview PDF

This is a limited preview

Buy now to download the full PDF (21 pages)

Need quotation for your management?

Get a formal quotation for DL/T 1338-2014 in 30 minutes.

Issued by

National Energy Administration of P.R. China

Level / Type

National · Recommended

Issue date

March 18, 2014

Implementation date

August 1, 2014

Scope

DL/T 1338-2014 is the English-translated version of 发电企业生产实时监管信息系统技术条件.

DL/T 1338-2014 — This Standard specifies the hardware and software configuration, applications, system security, documentation, acceptance and other technical requirements of realtime supervision and management information system for power generation enterprises.

This Standard applies to the management of plan-design, purchase, acceptance and other processes of realtime supervision and management information system for power generation enterprises.

Found what you need?

Document preview — DL/T 1338-2014

National Standard of the People's Republic of China

ICS
29.020
Classification
K 07

Issued by: National Energy Administration of P.R. China

Contents

  • Foreword...3
  • 1 Scope...4
  • 2 Normative references...4
  • 3 Terms and definitions...5
  • 4 General...5
  • 5 System technical requirements...6
  • 6 Application functions...13
  • 7 System security requirements...16
  • 8 Documentation materials...17
  • 9 Acceptance...18
  • Annex A...21

Foreword

This Standard is drafted according to the rules given in GB/T 1.1-2009 Directives for

standardization - Part 1. Structure and drafting of standards.

This Standard was proposed by China Electricity Council.

This Standard shall be under the jurisdiction of Electric Power Industry Thermal

Automation and Information Standardization Technical Committee.

Drafting organizations of this Standard. Xi'an Thermal Power Research Institute Co., Ltd.

and China Huaneng Group.

Main drafters of this Standard. Ge Xin, He Xin, Yang Dong, Guo Sen, Fan Weining, Li

Zhenhua, Wang Zhihui and Zhu Guihong.

Comments or proposals in the implementation of this Standard shall be feed-backed to

Standardization Management Center of China Electricity Council (No.1, 2nd lane,

Baiguang Road, Beijing, 100761).

Specification of realtime of supervision and management

information system for power generation enterprises

1 Scope

This Standard specifies the hardware and software configuration, applications, system

security, documentation, acceptance and other technical requirements of realtime

supervision and management information system for power generation enterprises.

This Standard applies to the management of plan-design, purchase, acceptance and

other processes of realtime supervision and management information system for power

generation enterprises.

2 Normative references

The following documents are indispensable for application of this document. For the dated

documents so quoted, only the dated versions apply to this document. For the undated

documents so quoted, the latest versions (including all modification sheets) apply to this

document.

GB4208 Degrees of protection provided by enclosure (IP code) (GB 4208-2008, IEC

60529.2001, IDT)

GB/T8567 Guidelines for computer software product development documentation

(GB/T 8567-2006, ISO/IEC JTC1 SC7N2106-1999, NEQ)

GB/T 17859 Classified criteria for security protection of computer information system

(GB/T 17859-1999, DOD 5200.28-STD, NCSC-TG-005)

GB 50229 Code for design of fire protection for fossil fuel power plants and substations

DL/T 262 On-line calculation guide for coal consumption of generating units

DL/T 924-2005 Specification for supervisory information system for plant level of fossil

fuel power plant

DL/T950 Guide for power plant identification system

State Electricity Regulatory Commission No.5 Order - Electric Power Secondary

System Security Protection Regulation

State Electricity Regulatory Commission Electricity Regulatory Safety (2006) No.34 -

Electric Power Secondary System Security Protection Overall Program

3 Terms and definitions

For the purpose of this document, terms and definitions defined in DL/T924-2005 AND the

following terms and definitions shall apply.

3.1

Realtime supervision and management information system

Information system that supervises and manages the production process through

production process realtime/ historical data platform for power generation enterprises

based on multiple power plants (companies).

3.2 Supervisory information system for plant level; SIS

Realtime supervision and management information system that service for realtime

production process comprehensive optimization of the whole plant through production

process realtime/ historical data platform for thermal power plant.

[Definition 3.1 in DL/T 924-2005]

3.3

Function computer and client computer

Computers or servers with SIS application functions and management functions are called

function computers, including database servers, application software function computers

or servers, system backup servers, anti-virus servers, maintenance and management

computers, etc. Other computer working stations in the system are called client computers.

[Definition 3.2 in DL/T 924-2005]

4 General

4.1 The implementation of the system shall be able to be done step-by-step according to

the actual requirements and technology development plan-design. The system shall insist

on reliable, versatile and scalable principles.

4.2 The metrological unit shall comply with national standards and provisions for common

physical and legal metrological units. The data-marker design shall follow the

requirements of DL/T 950.

4.3 The data scale of realtime/historical database shall be determined according to

requirements of system construction and development. The collection content and

collection code of data shall be standardized and unified; the data information processing

shall be standardized and unified; the accuracy, comparability and maintainability of data

at measuring points shall be ensured; the function of checking the data quality shall be

provided to facilitate the check and maintenance of data.

hot plug/unplug redundant power supplies and hot-plug / unplug redundant fans.

Non-core switches can use parts according to the specific situation.

5.2.2 Database servers

Use redundant arrays of inexpensive disks shared by database servers; it can use

independent storage systems shared by networks. It can use database server systems

with redundancy configuration or fault tolerant database server systems. Database server

systems with redundancy configuration shall support the automatic failure switch-over

through cluster working mode.

5.2.3 Data source interface stations at power generation enterprises
5.2.3.1 Use redundancy mode; the caching of data shall be able to include at least

production process information within one week; Support the wake-one-LAN and be able

to send the data in buffer memory to the database server automatically when the network

communication returns to normal.

5.2.3.2 Remote communication shall be able to do with collection stations at power plants;

the unit running information shall be able to obtain from the collection stations at power

plants in real time.

5.2.4 Data collection stations at power plants
5.2.4.1 Use redundancy mode; the caching of data shall be able to include at least

production process information within one week; Support the wake-one-LAN and be able

to send the data to caching them in the database server automatically when the network

communication returns to normal.

5.2.4.2 Do not alter and configure the control internet under power plants, Do not control

the manufacturing process directly; it shall not affect the control function of the underlying

production control internet.

5.2.5 Function computers and client computers

Set different operations and system access limits according to the functions of the function

computer and client computer. Client computers shall only be equipped with basic

supervision and inquiry functions to production processes without system management

function.

5.2.6 Peripheral equipment

Configure systems and date backup equipment. Backup equipment can be magnetic tape

drive equipment or read / write light disk drive equipment. When conditions are ripe, it can

use magnetic tape backup systems or disk arrays.

5.2.7 Cabinets, cables and arrangement
5.2.7.1 Network backbone equipment and function computers shall be installed in

standard computer rooms; the rooms shall be taken with security measures preventing

non-system maintenance personnel from operating.

5.2.7.2 The protection grade of cabinet enclosure shall comply with requirements of grade

IP54 in GB 4208; the cabinet door shall be equipped with conductive door closing strip to

improve the anti-RF interference ability; heat dissipation space and air filter apparatus

shall be taken into account in cabinet arrangement. Temperature detection means shall be

installed in the cabinet, which can alarm automatically when the temperature is too high.

5.2.7.3 Terminal strips, cable clamps, cable troughs and wiring troughs equipped in

cabinet shall use products made from flame resistant materials. The fireproof

requirements of interconnection communication cables, signal cables, twisted pairs

(including contact pieces of two ends) between equipment and fireproof requirements and

others shall comply with...

......

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 21 pages — is available in the English PDF.

Referenced standards

How to Download DL/T 1338-2014

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
21 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 1338-2014

$125.00