Valid

DL/T 1350-2014General specification for fault separation equipment of substation (English PDF)

变电站故障解列装置通用技术条件

Preview PDF

This is a limited preview

Buy now to download the full PDF (9 pages)

Need quotation for your management?

Get a formal quotation for DL/T 1350-2014 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

October 15, 2014

Implementation date

March 1, 2015

Scope

DL/T 1350-2014 is the English-translated version of 变电站故障解列装置通用技术条件.

DL/T 1350-2014 — This Standard specifies the basic technical requirements for substation fault splitting device, test methods, inspection rules and to signs, packaging, transportation and storage requirements.

Found what you need?

Document preview — DL/T 1350-2014

National Standard of the People's Republic of China

ICS
29.120.50
Classification
K 10

Issued by: National Energy Administration

Contents

  • What this standard covers1
  • Document data2
  • Standards quoted by this document3

What this standard covers

This Standard specifies the basic technical requirements for substation fault splitting device, test methods, inspection rules and to signs, packaging, transportation and storage requirements. This Standard applies to 110kV and below voltage substation an

Document data

International classification (ICS): 29.120.50.

Chinese classification (CCS): K10.

Estimated length of the Chinese original: 14,133 words.

Standards quoted by this document

GB/T 191-2008; GB/T 2423.1-2008; GB/T 2423.2-2008; GB/T 2423.3-2006; GB/T 2423.4-2008; GB/T 2423.10-2008; GB/T 2423.22-2012; GB/T 2900.1-2008; GB/T 2900.17-2009; GB/T 2900.49-2004; GB 4208-2008; GB/T 4798.2-2008; GB/T 7261-2008; GB/T 9361-2011; GB/T 11287

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 9 pages — is available in the English PDF.

How to Download DL/T 1350-2014

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
9 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

DL/T 1350-2014

$175.00