Valid

NB/T 42018-2013Copper-clad aluminum alloy wires for shielding (English PDF)

屏蔽用铜包铝合金线

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for NB/T 42018-2013 in 30 minutes.

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

November 28, 2013

Implementation date

April 1, 2014

Scope

NB/T 42018-2013 is the English-translated version of 屏蔽用铜包铝合金线.

Copper-clad aluminium alloy wire used for shielding is the subject of NB/T 42018-2013, a recommended standard of the Chinese energy industry. It classifies the product and lays down the technical requirements, the test methods and the inspection rules for it, as well as the marking, packaging and storage arrangements.

The wire it describes is intended for the shields of wires and cables. Its checks draw on GB/T 3048.2-2007, GB/T 4909.2-2009, GB/T 4909.3-2009, GB/T 4909.4-2009, GB/T 4909.5-2009, GB/T 4909.9-2009, GB/T 4909.10-2009, GB/T 4909.11-2009, GB/T 5121.1-2008, GB/T 10125-2002, GB/T 16825.2-2005 and SJ/T 11365-2006. Issued on 28 November 2013, it has applied since 1 April 2014.

Found what you need?

Document preview — NB/T 42018-2013

National Standard of the People's Republic of China

ICS
29.060.10

Issued by: National Energy Administration of the People's Republic of China

Contents

  • Foreword
  • Scope
  • Normative references
  • About this standard
  • Classification and status

1 Foreword

NB/T 42018-2013 was issued by NEA on 28 November 2013 and has been in force since 1 April 2014.

2 Scope

Copper-clad aluminium alloy wire used for shielding is the subject of NB/T 42018-2013, a recommended standard of the Chinese energy industry. It classifies the product and lays down the technical requirements, the test methods and the inspection rules for it, as well as the marking, packaging and storage arrangements. The wire it describes is intended for the shields of wires and cables. Its checks draw on GB/T 3048.2-2007, GB/T 4909.2-2009, GB/T 4909.3-2009, GB/T 4909.4-2009, GB/T 4909.5-2009, GB/T 4909.9-2009, GB/T 4909.10-2009, GB/T 4909.11-2009, GB/T 5121.1-2008, GB/T 10125-2002, GB/T 16825.2-2005 and SJ/T 11365-2006.

3 Normative references

NB/T 42018-2013 cites the following standards, which apply in full or in part through the references made to them in its clauses.

GB/T 3048.2-2007 — Test methods for electrical properties of electric cables and wires -- Part 2: Test of electrical resistivity of metallic materials

GB/T 4909.2-2009 — Test methods for bare wires - Part 2: Measurement of dimensions

GB/T 4909.3-2009 — Test methods for bare wires - Part 3: Tensile test

GB/T 4909.4-2009 — Test methods for bare wires - Part 4: Torsion test

GB/T 4909.5-2009 — Test methods for bare wires - Part 5: Bend test - Reverse bend test

GB/T 4909.9-2009 — Test methods for bare wires - Part 9: Test for continuity of coating - Sodium polysulfide solution method

GB/T 4909.10-2009 — Test methods for bare wires - Part 10: Test for continuity of coating - Ammonium persulphate solution method

GB/T 4909.11-2009 — Test methods for bare wires - Part 11: Test for adherence of coating

GB/T 5121.1-2008 — Methods for chemical analysis of copper and copper alloys -- Part 1: Determination of copper content

GB/T 10125-2002

GB/T 16825.2-2005

SJ/T 11365-2006

4 About this standard

Issued by: NEA

English translation: about 15 pages

5 Classification and status

International classification (ICS): 29.060.10

Prefix NB/T: recommended standard.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download NB/T 42018-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 42018-2013

$269.00