Scope

NB/T 10527-2021 is the English-translated version of 煤矿立井井壁注浆施工规范.

NB/T 10527-2021 sets out how grouting of the shaft wall in coal mines is designed, carried out and accepted.

It begins with basic requirements on the construction unit and its personnel, technical data, equipment and grouting materials, then covers the design of drilling and grouting, drilling and grouting construction on site, and completion and acceptance of the grouting project.

Terms such as grouting between the two layers of a double shaft wall, grouting behind the shaft wall, the hanging scaffold and the grout diffusion radius are defined, and Appendix A gives a form for the original construction record.

It applies to shaft wall grouting in new, rebuilt, expanded and producing coal mines. Issued on 7 January 2021, the code has applied since 1 April 2021.

Found what you need?

Document preview — NB/T 10527-2021

National Standard of the People's Republic of China

Classification
D 15

Issued by: National Energy Administration of the People's Republic of China

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Basic requirements for wall grouting
  • 4.1 Construction unit and personnel
  • 4.2 Construction technical data
  • 4.3 Construction equipment and materials
  • 5 Design of well wall grouting engineering
  • 5.1 General provisions
  • 5.2 Drilling Design
  • 5.3 Grouting Design
  • 6 Construction of well wall grouting
  • 6.1 General provisions
  • 6.2 Drilling construction
  • 6.3 Grouting construction
  • 7 Acceptance of well wall grouting project
  • 7.1 Completion of construction
  • 7.2 Project Acceptance
  • Appendix A (informative appendix) Original record of grouting construction of coal mine shaft wall

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009.

1 Scope

This standard specifies the basic requirements for grouting of the shaft wall of coal mines and the standards for engineering design, construction and acceptance.

This standard is applicable to the grouting construction of coal mine shaft wall for new construction, reconstruction, expansion and production.

2 Normative references

The following documents are essential for the application of this document. For dated references, only the dated version applies to this document. For undated references, the latest edition (including all amendments) applies to this document.

GB/T 15663.2-2008 Coal Mine Technical Terminology Part 2: Tunnel Engineering

GB 50108-2008 Technical Specification for Waterproofing of Underground Engineering

GB 50213-2010 Code for acceptance of quality of coal mine tunnel engineering

GB 50511-2010 Code for construction of coal mine tunnel engineering

AQ1083-2011 Safety Code for Coal Mine Construction

3 Terms and Definitions

The terms and definitions defined in GB/T 15663.2-2008, AQ1083-2011 and the following apply to this document. In order to facilitate With, the following repeats lists some terms and definitions in GB/T 15663.2-2008, AQ1083-2011.

3.1 Inter-wall grouting

When the vertical shaft is supported by two layers of well walls, in order to prevent or block the water leakage of the well wall, the water sealing material is injected into the gap between the two layers of well walls.

Note 1. Rewrite AQ1083-2011, definition 3.12.

Note 2. One of the two main forms of vertical shaft wall grouting.

3.2 Behind-wall grouting

After the vertical shaft is permanently supported, in order to reduce the water spray or strengthen the stratum, the grouting operation is carried out to the back of the shaft wall according to the design requirements.

Note 1. Rewrite GB/T 15663.2-2008, definition 3.38.

Note 2. One of the two main forms of vertical shaft wall grouting.

3.3 Hanging scaffold

It is a liftable working platform suspended in the wellbore for vertical well construction operations and to protect the safety of operators. [AQ1083-2011, Definition 3.9]

3.4 Grout diffusion radius

Taking the grouting hole as the center, the radial outward diffusion of the grout meets the effective distance for the purpose of water plugging and reinforcement. [GB/T 15663.2-2008, definition 3.29]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download NB/T 10527-2021

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 10527-2021

$210.00