Scope
NB/T 10096-2018 is the English-translated version of 电力建设工程施工安全管理导则.
NB/T 10096-2018 sets out how construction safety is managed on power construction projects in China - thermal, hydropower and nuclear plants (excluding the nuclear island), wind and solar farms, and transmission and substation works. It is an organisational standard rather than a technical one: it does not tell a crew how to erect a boiler, it tells the owner, the contractor and the supervisor how the safety of that work must be organised, assigned, checked and recorded. It gives the scope, the normative references and a full set of defined terms, then the basic requirements on the safety management system and the principle that responsibility follows the organisational chain. The standard then works through the system element by element: the safety management organisation and the duties of each post, the safety responsibility system and its assessment, safety objectives and planning, the rules and procedures the project must maintain, the safety cost budget and its use, the qualification and training of personnel including special trades, subcontractor management, the identification and control of hazards and major hazard sources, the management of plant and equipment, safety technical measures and method statements for dangerous work, occupational health, fire and traffic safety on site, emergency planning and drills, accident reporting and investigation, and the safety inspection and continuous improvement cycle. The records and archives of safety management close the standard.
Document preview — NB/T 10096-2018
National Standard of the People's Republic of China
- ICS
- 27.100
- Classification
- K46
Issued by: National Energy Administration of the PRC
Contents
- 1 Scope1
- 2 Normative references1
- 3 Terms and definitions1
- 4 Basic requirements3
- 5 Construction safety management planning3
- 5.1 Preparation requirements3
- 5.2 Construction safety management planning content of the project owner4
- 5.3 Construction safety management planning content of the survey and design unit5
- 5.4 Construction safety management planning content of the construction contractor6
- 5.5 Construction safety management planning content of the supervision unit8
- 5.6 Construction safety management planning content of the EPC general contractor10
- 6 Work safety management system13
- 6.1 Work safety committee13
- 6.2 Work safety assurance system14
- 6.3 Work safety supervision and management organization15
- 7 Work safety responsibilities and duties15
- 7.1 Basic requirements15
- 7.2 Work safety responsibilities of participating units15
- 7.3 Work safety duties of key positions18
- 8 Work safety management rules22
- 8.1 Preparation of work safety management rules22
- 8.2 Issuance, publicity and implementation of work safety management rules24
- 8.3 Review and revision of work safety management rules24
- 9 Work safety target management25
- 9.1 Formulation of work safety targets of the construction project25
- 9.2 Formulation and issuance of work safety management indicators of other participating units25
- 9.3 Supervision, inspection and assessment of work safety targets of participating units25
- 10 Work safety education and training25
- 10.1 Basic requirements for work safety education and training25
- 10.2 Basic requirements for work safety education and training of principal persons in charge and work safety management personnel25
- 10.3 Basic requirements for work safety education and training of employees25
- 10.4 Supervision and inspection of work safety education and training26
- 11 Work safety expenses26
- 11.1 Basic requirements26
- 11.2 Scope of use of work safety expenses26
- 11.3 Extraction of work safety expenses27
- 11.4 Use of work safety expenses27
- 11.5 Supervision and inspection of the management of work safety expense use27
- 12 Construction safety technical management27
- 12.1 Basic requirements27
- 12.2 General requirements28
- 12.3 Preparation of the safety technical chapter in the construction organization design28
- 12.4 Management of special construction schemes29
- 12.5 Requirements for preparation of safety technical measures30
- 12.6 Content and methods of safety technical briefing31
- 12.7 Supervision and inspection of safety technical management31
- 13 Safety management of construction machinery and equipment31
- 13.1 Basic management of construction machinery and equipment31
- 13.2 Operation management of construction machinery and equipment33
- 13.3 Safety supervision and inspection of construction machinery and equipment36
- 14 Operation safety37
- 14.1 Basic content37
- 14.2 Working environment37
- 14.3 Working conditions37
- 14.4 Working behavior37
- 15 Safety inspection38
- 15.1 Types and methods of safety inspection38
- 15.2 Content and requirements of safety inspection38
- 16 Safety risk control and hidden danger investigation and treatment38
- 16.1 Basic content38
- 16.2 Safety risk control38
- 16.3 Hidden danger investigation and treatment40
- 17 Subcontracting safety management41
- 17.1 Basic content41
- 17.2 Subcontracting plan management42
- 17.3 Subcontracting plan implementation42
- 17.4 Qualification requirements and resource allocation of subcontractors42
- 17.5 Subcontracting supervision and management42
- 17.6 Subcontracting evaluation management43
- 18 Occupational health management43
- 18.1 Basic occupational health management43
- 18.2 Occupational health management activities43
- 19 Emergency management45
- 19.1 Basic requirements45
- 19.2 Emergency management organization system45
- 19.3 Establishment of the emergency plan system46
- 19.4 Emergency management activities48
- 19.5 Emergency rescue51
- 20 Accident reporting, investigation and handling51
- 20.1 Accident reporting51
- 20.2 Accident response52
- 20.3 Accident investigation and handling52
- 21 Performance evaluation and continual improvement53
- 21.1 Basic requirements53
- 21.2 Organization of performance evaluation53
- 21.3 Rewards and penalties of performance evaluation54
- 21.4 Continual improvement55
- 22 Safety archives management55
- 22.1 Basic content55
- 22.2 Basic requirements55
- 22.3 Classification of safety technical archives56
- 22.4 Principles of safety technical archives management58
- Annex A (informative) Sub-projects with relatively high danger59
- Annex B (informative) Sub-projects with relatively high danger exceeding a certain scale61
- Annex C (informative) Important temporary facilities, important construction procedures, special operations and dangerous work items63
- Annex D (informative) Classification of common construction machinery and equipment64
- Annex E (informative) Catalogue of safety facilities65
- Annex F (informative) Sub-projects requiring a safety construction work permit66
- Bibliography68
Foreword
This document was issued on 29 October 2018 by the National Energy Administration of the PRC and takes effect on 1 January 2019.
It is a NB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.
It is classified under ICS 27.100, Chinese classification K46.
This standard was drafted in accordance with the rules given in GB/T 1.1-2009 Directives for standardization — Part 1: Structure and drafting of standards.
This standard was proposed by and is under the jurisdiction of the Electric Power Safety Supervision Department of the National Energy Administration.
Main drafting organization of this standard: China Electric Power Construction Association.
Participating drafting organizations of this standard: State Grid Corporation of China, China Southern Power Grid Co., Ltd., China Datang Corporation Ltd., Power Construction Corporation of China, China Energy Engineering Group Co., Ltd., China Huadian Corporation Ltd., State Power Investment Corporation Limited, China Resources Power Holdings Co., Ltd., Neimenggu Nengyuan Jianshe Touzi (Jituan) Youxian Gongsi, Beijing Nengyuan Jituan Youxian Zeren Gongsi and Zhonghe Jiangsu Hedian Youxian Gongsi.
Main drafters of this standard: You Jing, Wang Guang, Guo Junfeng, Chen Bo, Li Lianyou, Gao Tongbiao, Zhang Zhentao, Long Xianming, Fang Shaozeng, Wang Xue, Zhang Sanqi, Ge Zejun, Liu Donggen, Ma Zonglei, Yang Yanjun, Peng Kaiyu, Wang Tie, Xiao Qifeng, Lang Debin, Wang Xin, Shan Zhihui, Shao Qingye, Zou Huaijun, Qian Fangchun, Tang Xiaoyong, Wo Zhonglei, Sun Jianjun, Du Xueyun, Xie Yihui, Huang Shixin, Liang Zhongjun, Chen Weiguo and Xie Meisheng.
Main reviewers of this standard: Tong Guangyi, Zhang Yangmin, Xu Haiming, Xu Xinfeng, Luo Wenlong, Ying Xichun, Xiao Haibao, Peng Fei, Du Yong, Cheng Yan, Fang Jun, Zhang Jie, Huangfu Jingjing, Wu Zhifu, Li Qinglin, Yuan Taiping, Gao Xiaolin, Yang Liyong, Zhou Wei, Lu Qiusheng, Li Chenglin, Gao Yongxiang, Xu Hexian, Hou Shiying, Zhou Xiaofei, Xin Hua, Peng Xiaojun, Yang Dawei, Zhou Shijie, Qiu Yongnian, Sun Shijie, Li Yahui, Wang Xiaojiang, Guo Zhe, Chen Xiaoxue and Zhu Yuping.
1 Scope
NB/T 10096-2018 sets out how construction safety is managed on power construction projects in China - thermal, hydropower and nuclear plants (excluding the nuclear island), wind and solar farms, and transmission and substation works. It is an organisational standard rather than a technical one: it does not tell a crew how to erect a boiler, it tells the owner, the contractor and the supervisor how the safety of that work must be organised, assigned, checked and recorded. It gives the scope, the normative references and a full set of defined terms, then the basic requirements on the safety management system and the principle that responsibility follows the organisational chain. The standard then works through the system element by element: the safety management organisation and the duties of each post, the safety responsibility system and its assessment, safety objectives and planning, the rules and procedures the project must maintain, the safety cost budget and its use, the qualification and training of personnel including special trades, subcontractor management, the identification and control of hazards and major hazard sources, the management of plant and equipment, safety technical measures and method statements for dangerous work, occupational health, fire and traffic safety on site, emergency planning and drills, accident reporting and investigation, and the safety inspection and continuous improvement cycle. The records and archives of safety management close the standard.
The power construction projects referred to in this standard are power generation construction projects such as thermal power, hydropower, nuclear power (excluding the nuclear island), wind power and solar power generation, and power grid construction projects such as power transmission and transformation.
This standard is applicable to guiding the safety management of construction activities such as new construction, expansion, reconstruction and demolition of power construction projects. The construction safety management of civil building projects such as power supply stations, business halls and office buildings may be implemented with reference to this standard. Other supporting construction projects approved and built simultaneously, such as railway, transportation and water conservancy works, shall comply with the relevant national laws, regulations and departmental rules of the respective specialties.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition (including all amendments) applies.
GB 12523 Emission standard of environment noise for boundary of construction site.
GB 30871 Safety specification for special work in chemical production units.
GB 50150 Electric equipment installation engineering — Standard for hand-over test of electric equipment.
GB 50194 Code for safety of power supply and consumption for construction site.
GB 50352 General code for design of civil buildings.
GB 50720 Technical code for fire safety of construction site.
GB/T 11651 Specification for selection of personal protective equipment.
(Caiqi [2012] No. 16) Measures for the administration of extraction and use of enterprise work safety expenses.
3 Terms and definitions
For the purposes of this document, the following terms and definitions apply.
3.1 contractors: units that directly participate in the construction of a project and bear specific legal responsibilities for it, mainly including the project owner, EPC general contractor, survey and design unit, construction contractor and supervision unit of a power construction project. In this guideline, the project owner, EPC general contractor, survey and design, construction and supervision units refer to the project departments dispatched by the enterprises to the site. EPC general contracting refers to contracting, as agreed in the EPC contract, the whole process or several stages of a project, such as survey, design, procurement, construction and trial operation (completion acceptance).
3.2 safety production target management: the process of determining, on the basis of an analysis of the external environment and internal conditions, the targets to be achieved in work safety, and taking measures to strive to achieve those targets.
3.3 system of responsibility in safe production: a system, established in accordance with work safety laws and regulations and the policy of 'safety first, prevention foremost, comprehensive management', under which leaders at all levels, functional departments and personnel in all positions are responsible for work safety in the course of labor and production. The work safety responsibility system shall specify the responsibilities, scope and assessment criteria of the personnel in each position.
3.4 safety facilities and occupational-disease-prevention facilities at the same time ('three simultaneities'): the safety facilities and occupational disease prevention facilities of a construction project must be designed, constructed and put into production and use at the same time as the main works.
3.5 safe production cost: funds extracted according to prescribed standards, listed in the project construction cost and used exclusively for improving and upgrading the work safety conditions of the construction project.
3.6 dangerous sub-projects: sub-divisional and sub-item works of a construction project which, during construction, may lead to mass deaths and injuries of operating personnel or cause major economic losses.
3.7 special scheme of safety of construction project: a safety technical measure document prepared by the construction contractor, on the basis of the construction organization design, for complex natural conditions, complex structures, works of high technical difficulty and sub-projects with relatively high danger.
3.8 confined spaces: facilities, equipment and places that are closed or partially closed, relatively isolated from the outside, with narrow entrances and exits and poor natural ventilation, where toxic and harmful or flammable and explosive substances may easily accumulate or where oxygen content may be insufficient.
3.9 dangerous goods: articles, such as flammable and explosive articles, hazardous chemicals and radioactive articles, that can endanger personal safety and the safety of property.
3.10 risk: the combination of the likelihood of occurrence of a hazardous event or harmful exposure and the severity of the personal injury or damage to health that may result from it.
3.11 security risk assessment: the process of analyzing safety risks by qualitative or quantitative statistical analysis methods, determining their severity, considering the adequacy and reliability of existing control measures, and determining whether the risk is acceptable.
3.12 security risk management: determining, on the basis of the results of safety risk assessment, the priority of safety risk control and the safety risk control measures, so as to improve the work safety environment and to reduce and eliminate work safety accidents.
3.13 working environment: the places where employees carry out production and business activities and the associated places, together with all natural and man-made factors affecting the safety, health and working ability of employees and the safe operation of equipment (facilities).
3.14 source of danger: the root cause, state or behavior, or a combination thereof, that may cause personal injury and/or damage to health. A major hazard source is a unit (including places and facilities) in which dangerous goods are produced, handled, used or stored on a long-term or temporary basis and the quantity of dangerous goods equals or exceeds the critical quantity.
3.15 production safety accident hidden danger: an unsafe condition of objects, unsafe act of persons or management defect that violates the provisions of work safety laws, regulations, rules, standards, codes of practice and management systems, or that exists in production and business activities owing to other factors, and that may lead to an accident. Accident hidden dangers are divided into general accident hidden dangers and major accident hidden dangers. A general accident hidden danger is one with minor harm and low difficulty of rectification that can be rectified and eliminated immediately upon discovery. A major accident hidden danger is one with serious harm and high difficulty of rectification that requires full or partial suspension of production or business and can be eliminated only after rectification over a certain period, or one that the production and business unit itself has difficulty eliminating owing to external factors.
3.16 occupational health management: the identification, assessment, prediction and control of occupational hazard factors generated or existing in the workplace and of the health damage they cause, with the aim of preventing and protecting workers from health effects and risks caused by occupational hazard factors, adapting work to workers, and promoting and safeguarding the physical and mental health and social welfare of workers in occupational activities.
3.17 contingency plan: a work plan for prior prevention and subsequent response, prepared in advance in order to effectively prevent and control the occurrence of public emergencies, or to take effective response measures after a public emergency occurs, prevent the escalation of the situation and of adverse impacts, and minimize loss of life and property. Emergency plans are divided into comprehensive emergency plans, special emergency plans and on-site response plans.
3.18 safety facilities: the general term for equipment, facilities, devices, structures (buildings) and other technical measures used in construction activities to prevent and reduce work safety accidents.
3.19 interested target: individuals and units inside and outside the construction site that are related to, or affected by, the work safety performance of the construction project.
4 Basic requirements
4.1 The participating units of a power construction project shall implement their principal responsibility for work safety, establish a work safety responsibility system, establish and improve the work safety assurance system and supervision system, improve safety management rules and regulations, ensure investment in work safety, strengthen safety education and training, promote work safety standardization, and raise the level of construction safety management by relying on scientific management and technological progress.
4.2 The survey and design, construction and supervision units of a power construction project shall hold power engineering qualifications, a qualification grade appropriate to the project undertaken, and the corresponding administrative licenses. Where EPC general contracting is adopted, the EPC general contractor shall hold engineering design or construction qualifications appropriate to the scale of the power project.
4.3 The principal person in charge of each participating unit of a power construction project is the first person responsible for work safety of the unit's project and is fully responsible for work safety. The principal person in charge and the safety management personnel shall receive special safety education and training and obtain a certificate of passing the safety assessment.
Remaining clauses in the full document
- 5 Construction safety management planning
- 5.1 Construction safety management planning — Preparation requirements
- 5.2 Construction safety management planning content of the project owner
- 5.3 Construction safety management planning content of the survey and design unit
- 5.4 Construction safety management planning content of the construction contractor
- 5.5 Construction safety management planning content of the supervision unit
- 5.6 Construction safety management planning content of the EPC general contractor
- 6 Work safety management system
- 7 Work safety responsibilities and duties
- 8 Work safety management rules
- 9 Work safety target management
- 10 Work safety education and training
- 11 Work safety expenses
- 12 Construction safety technical management
- 13 Safety management of construction machinery and equipment
- 14 Operation safety
- 15 Safety inspection
- 16 Safety risk control and hidden danger investigation and treatment
- 17 Subcontracting safety management
- 18 Occupational health management
- 19 Emergency management
- 20 Accident reporting, investigation and handling
- 21 Performance evaluation and continual improvement
- 22 Safety archives management
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 68 pages — is available in the English PDF.
Referenced standards
Normative references
- GB 12523 Emission standard of environment noise for boundary of construction site.Emission standard for construction noise
- GB 30871 Safety specification for special work in chemical production units.Safety specifications of special work in hazardous chemicals enterprises
GB 50150 Electric equipment installation engineering — Standard for hand-over test of electric equipment. · GB 50194 Code for safety of power supply and consumption for construction site. · GB 50352 General code for design of civil buildings. · GB 50720 Technical code for fire safety of construction site. · GB/T 11651 Specification for selection of personal protective equipment.
Similar standards
GB/T 1.1-2009|GB 12523|GB 30871|GB 50150|GB 50194|GB 50352|GB 50720|GB/T 11651
How to Buy NB/T 10096-2018
- 1Add to cart. Click the "Buy NB/T 10096-2018" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
NB/T 10077-2024 — Code for design of rock-filled concrete dams
NB/T 11488-2024 — General specification for power conversion system of flow battery energy storage system
NB/T 11512-2024 — Code for chimney design of fossil-fired power plant
Secure payment via Stripe
Payments accepted
NB/T 10096-2018
$965.00