Valid

JB/T 6987-2013Specification of prototype method for software development in manufacturing resource planning MRPII system (English PDF)

制造资源计划MRPII系统原型法软件开发规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (34 pages)

Need quotation for your management?

Get a formal quotation for JB/T 6987-2013 in 30 minutes.

Issued by

MIIT

Level / Type

Industry · Recommended

Issue date

December 31, 2013

Implementation date

July 1, 2014

Scope

JB/T 6987-2013 is the English-translated version of 制造资源计划MRPII系统原型法软件开发规范.

JB/T 6987-2013 is a recommended standard of the Chinese machinery industry that specifies the prototype method of software development for manufacturing resource planning, or MRP II, systems. It sets out the incremental prototyping development process followed at the various stages of building such a system, and it states the task of each stage and the main content of the work carried out there. It quotes GB/T 8566-2007 and GB/T 8567. It replaces the earlier edition JB/T 6987-1993. The standard is filed under Chinese classification L77 and international classification 25.040.

Found what you need?

Document preview — JB/T 6987-2013

National Standard of the People's Republic of China

ICS
25.040
Replacing
JB/T 6987-1993

Issued by: Ministry of Industry and Information Technology of the People's Republic of China

Contents

  • 2 Normative references

2 Normative references

JB/T 6987-2013 cites the following standards, which apply in full or in part through the references made to them in its clauses.

GB/T 8566-2007

GB/T 8567

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 34 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of JB/T 6987

EditionTitleRevisionStatus
JB/T 6987-2013Specification of prototype method for software development in manufacturing resource planning MRPII systemcurrent editionCurrent
JB/T 6987-1993Specification of prototype method for software development in manufacturing resource planning MRPII systemprevious editionSuperseded

This page sells the current edition, JB/T 6987-2013. Earlier editions are listed for reference only.

How to Download JB/T 6987-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
34 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

JB/T 6987-2013

$1,294.00