Scope
HJ 2005-2010 (Technical specification of constructed wetlands for wastewater treatment engineering) is available as an English-translated PDF.
HJ 2005-2010 — This standard specifies the technical requirements for the overall requirements, process design, construction and acceptance, operation and maintenance of constructed wetland wastewater treatment projects. begging.
This standard is applicable to urban domestic sewage, urban sewage treatment plant effluent and other sewage treatment projects with similar properties to domestic sewage.
As the technical basis for the completion, environmental protection and acceptance of the design, construction and construction of the constructed wetland sewage treatment project and the operation and maintenance after the completion.
Found what you need?
Document preview — HJ 2005-2010
National Standard of the People's Republic of China
- Classification
- Z 23
Issued by: Ministry of Ecology and Environment
Contents
- Foreword
- 1 Scope of application
- 2 Normative references
- 3 Terms and definitions
- 4 Design water quantity and design water quality
- 4.1 Design water quantity
- 4.2 Design water quality
- 4.3 Contaminant removal efficiency of constructed wetland system
- 5 General requirements
- 5.1 Construction scale
- 6.1 General requirements
- 6.2 Process
- 6.3 Pretreatment
- 6.4 Constructed wetlands
Foreword
To implement the "Environmental Protection Law of the People's Republic of China" and the "Water Pollution Prevention and Control Law of the People's Republic of China" this standard is formulated for the construction, operation, maintenance and management of water treatment projects.
This standard specifies the technical requirements for the design, construction and operation and maintenance of constructed wetland wastewater treatment projects.
This standard is the first release.
This standard was formulated by the Science and Technology Standards Department of the Ministry of Environmental Protection.
This standard was drafted. Shenyang Environmental Science Research Institute.
This standard was approved by the Ministry of Environmental Protection on December 17, 2010.
This standard has been implemented since March 1, 2011.
This standard is explained by the Ministry of Environmental Protection.
Technical specification for constructed wetland sewage treatment engineering
1 Scope of application
This standard specifies the technical requirements for the overall requirements, process design, construction and acceptance, operation and maintenance of constructed wetland wastewater treatment projects.
begging.
This standard is applicable to urban domestic sewage, urban sewage treatment plant effluent and other sewage treatment projects with similar properties to domestic sewage.
As the technical basis for the completion, environmental protection and acceptance of the design, construction and construction of the constructed wetland sewage treatment project and the operation and maintenance after the completion.
2 Normative references
The contents of this standard refer to the terms in the following documents. For undated references, the valid version applies to this standard.
GB 12348 Environmental noise emission standards for industrial enterprises GB/T 12801 General requirements for safety and hygiene of production processes GB 14554 Odor Pollutant Discharge Standard GB 18918 Pollutant discharge standard for urban sewage treatment plants GB 50003 masonry structure design specification GB 50011 seismic design code for buildings GB 50013 Outdoor Water Supply Design Code GB 50014 Outdoor Drainage Design Code GB 50015 Building Water Supply and Drainage Design Code GB 50016 Building Design Fire Code GB 50019 Heating, Ventilation and Air Conditioning Design Code GB 50034 Industrial Enterprise Lighting Design Specification GB 50040 power machine basic design specification GB 50052 design specification for power distribution system GB 50053 10 kV and below substation design specifications GB 50054 Low Voltage Distribution Design Specification GB 50069 Water supply and drainage engineering structure design specification GB 50070 concrete structure design specification GB 50140 Building Fire Extinguisher Configuration Design Specification GB 50204 Concrete Structure Engineering Construction Quality Acceptance Specification General specification for construction and acceptance of GB 50231 mechanical equipment installation engineering GB 50268 Water supply and drainage pipeline engineering construction and acceptance specifications GB 50335 Wastewater Recycling Engineering Design Specification GB J 87 Industrial Enterprise Boundary Noise Control Design Specification GB J 141 Code for construction and acceptance of water supply and drainage structures GB/T 13663 polyethylene (PE) pipe for water supply HJ/T 15 Environmental Protection Product Technical Requirements Ultrasonic Open Channel Sewage Flowmeter HJ/T 96 pH water quality automatic analyzer technical requirements HJ/T 101 Ammonia Nitrogen Water Quality Analyzer Technical Requirements HJ/T 103 Total Phosphorus Water Quality Automatic Analyzer Technical Requirements HJ/T 353 water pollution source online monitoring system installation technical specification HJ/T 354 water pollution source online monitoring system acceptance technical specification Technical specification for operation and assessment of HJ/T 355 water pollution source online monitoring system HJ/T 377 Environmental Protection Products Technical Requirements Chemical Oxygen Demand (CODCr) Water Quality Online Automatic Monitor CJJ 17 Technical Specifications for Urban Domestic Waste Sanitary Landfill CJJ 60 Urban Wastewater Treatment Plant Operation, Maintenance and Safety Technical Regulations Measures for the Administration of Environmental Protection Acceptance for Completion of Construction Projects (Order No. 13 of the State Environmental Protection Administration)
3 Terms and definitions
The following terms and definitions apply to this standard.
Constructed wetland constructed wetland Refers to the artificial construction of pools or trenches, the laying of anti-seepage and water-repellent layers on the bottom, filling the substrate layer of a certain depth, planting aquatic plants, and utilizing the triple synergy of the physical, chemical, and biological interactions of the substrate, plant, and microorganisms allows the sewage to be purified. According to the way of sewage flow, it is divided into surfaces Flowing constructed wetlands, horizontal subsurface flow constructed wetlands and vertical submerged artificial wetlands.
Surface flow constructed wetland surface flow constructed wetland Refers to the artificial wetland where the sewage flows above the surface of the substrate layer and flows horizontally from the inlet end of the tank body to the outlet end.
Horizontal subsurface flow constructed wetland Refers to the artificial wetland where the sewage flows below the surface of the substrate layer and flows horizontally from the inlet end of the tank body to the outlet end.
Vertical subsurface flow constructed wetland Refers to the constructed wetland where the sewage passes vertically through the matrix layer in the cell body.
Pretreatment
Refers to the treatment set in front of the constructed wetland in order to meet the overall requirements of the project, the requirements for the influent water quality of the constructed wetlands and the reduction of the wetland pollution load.
Art, such as grille, grit, primary sedimentation, homogenization, hydrolysis and acidification, stable pond, anaerobic, aerobic and so on.
Post-treatment
Refers to the treatment process set after the constructed wetland, such as activated carbon adsorption, coagulation and sedimentation, in order to meet the requirements for discharge or reuse of the discharged water.
Filtration, disinfection, stabilization of the pond, etc.
Matrix bed filler
Refers to the filling materials that provide the wetland plants and microbial growth and filter and absorb the pollutants, including soil, sand, gravel, Zeolite, limestone, shale, plastic, ceramics, etc.
Hydraulic retention time Refers to the average residence time of sewage in constructed wetlands. The hydraulic retention time of the subsurface flow constructed wetland is calculated according to formula (1).
epsilon×= (1)
Where. t--hydraulic residence time, d;
V--the volume of the constructed wetland substrate in its natural state, including the matrix entity and its opening, closed pores, m3;
E--porosity, %;
Q--Design wetland design water volume, m3/d.
Surface organic load Refers to the five-day biochemical oxygen demand removed per unit square of constructed wetland per unit time. Calculated according to formula (2).
0 1( ) 10
QC Cq
Where. -- surface organic loading, kg/(m2 · d); osq Q--Design wetland design water quantity, m3/d;
0C - artificial wetland influent BOD5 mass concentration, mg/L;
1C - artificial wetland effluent BOD5 mass concentration, mg/L;
A--Artificial wetland area, m2.
3.10
Surface hydraulic load Refers to the amount of sewage that can be received per unit square of constructed wetland per unit time. Calculated according to formula (3).
Where. -- surface hydraulic load, m3/(m2 · d); hsq Q--Design wetland design water quantity, m3/d;
A--Artificial wetland area, m2.
3.11
Hydraulic slope
Refers to the water level drop value of the length of the seepage flow along the direction of the water flow in the constructed wetland. Calculated according to formula (4).
100%Hi
delta= × (4)
Where. i - hydraulic gradient, %;
deltaH--the water level drop value of the sewage in the length of the seepage path in the constructed wetland, m;
L--The horizontal distance of sewage in the constructed wetland, m.
4 Design water quantity and design water quality
4.1 Design water quantity
The determination of the amount of water to be designed shall comply with the relevant provisions of GB 50014.
4.2 Design water quality
4.2.1 When the project accepts urban domestic sewage, the design water quality can refer to the relevant provisions of GB 50014; the nature of acceptance and domestic sewage when other sewage is similar, the design water quality can be determined through investigation.
4.2.2 When the project accepts the water from the urban sewage treatment plant, the design water quality shall be in accordance with the provisions of GB 18918.
4.2.3 The influent water quality of the constructed wetland system shall meet the requirements of Table 1.
Table 1 Influent water quality requirements of constructed wetland system Unit. mg/L
Constructed wetland type BOD5 CODCr SS NH3-N TP Surface flow constructed wetland <=50 <=125 <=100 <=10 <=3 Horizontal subsurface flow constructed wetland <=80 <=200 <=60 <=25 <=5 Vertical subsurface flow constructed wetland <=80 <=200 <=80 <=25 <=5
4.3 Contaminant removal efficiency of constructed wetland system
The pollutant removal efficiency of the constructed wetland system can be referred to the data in Table 2.
Table 2 Contaminant removal efficiency of constructed wetland system Unit. %
Constructed wetland type BOD5 CODCr SS NH3-N TP Surface flow constructed wetland 40~70 50~60 50~60 20~50 35~70 Horizontal submerged artificial wetland 45~85 55~75 50~80 40~70 70~80 Vertical subsurface flow constructed wetland 50~90 60~80 50~80 50~75 60~80
5 General requirements
5.1 Construction scale
5.1.1 Factors such as the amount of sewage generated, the distribution, development planning and trends in the service area should be considered comprehensively.
The term is mainly based on the principle that the scale can be expanded in the long run.
5.1.2 The construction scale is classified according to the following rules.
a) The daily treatment capacity of the small constructed wetland sewage treatment project is 6 Process design
6.1 General requirements
6.1.1 Process design should comprehensively consider the amount of treated water, raw water quality, floor space, construction investment, operating costs, emission standards, and stability.
Sex, as well as climatic conditions, vegetation types and geographical conditions in different regions, and should determine appropriate options through technical and economic comparisons.
6.1.2 System design such as pretreatment, post-treatment, sludge treatment, and odor treatment shall comply with the relevant regulations in GB 50014 and related industry specifications.
set.
6.1.3 When the constructed wetland system consists of multiple artificial wetland units of the same type or different types, it can be divided into parallel, series and mixed.
Combination method.
6.2 Process
The basic process flow is as follows.
a) When the project accepts urban domestic sewage and other sewage with similar properties to domestic sewage, the basic process is.
Sewage pretreatment artificial wetland post-treatment discharge or reuse Sludge treatment
Figure 1 Process flow chart for accepting urban domestic sewage or other sewage similar in nature to domestic sewage
b) When the project accepts the water from the urban sewage treatment plant, the basic process flow is.
Sewage artificial wetland post-treatment discharge or reuse
Figure 2 Process flow chart for project acceptance of effluent from urban sewage treatment plant
6.3 Pretreatment
6.3.1 The degree and method of pretreatment should take into account factors such as sewage water quality, type of constructed wetland and effluent water quality requirements.
Primary treatment such as grit, primary sedimentation, homogenization, physicochemical strengthening method, pre-AB method, hydrolysis acidification, floating biological bed, etc.
Process, as well as secondary treatment processes such as SBR, oxidation ditch, A/O, and biological contact oxidation.
6.3.2 When the BOD5/CODCr of wastewater is less than 0.3, the hydrolysis acidification treatment process should be adopted.
6.3.3 When the SS content of sewage is greater than 100 mg/L, a sedimentation tank should be provided.
6.3.4 If the oil content in the sewage is greater than 50 mg/L, degreasing equipment should be provided.
6.3.5 When the DO of the sewage is less than 1.0 mg/L, an aeration device should be provided.
6.4 Constructed wetlands
6.4.1 Design parameters
6.4.1.1 The area of constructed wetland shall be determined according to the surface organic load of BOD on the 5th, and the requirements of hydraulic load shall be met.
6.4.1.2 The main design parameters of constructed wetlands should be determined according to the test data; when there is no test data, empirical data can be used or according to Table 3.
The value of the data.
Table 3 Main design parameters of constructed wetlands
Constructed wetland type BOD5 load/[kg/(hm2·d)] Hydraulic load/[m3/(m2·d)] Hydraulic retention time/d Surface flow constructed wetland 15~50 10.1, it needs to be counted.
Calculate the dead water curve;
b) The surface water artificial wetland should have a water depth of 0.3 to 0.5 m;
c) The hydraulic gradient of the surface flow constructed wetland should be less than 0.5%.
6.4.3 Set, distribution and effluent
6.4.3.1 The constructed wetland unit should adopt a device such as a perforated pipe, a distribution (collection) water pipe, and a distribution (water collection) to achieve uniformity of the water distribution.
6.4.3.2 The length of the perforated pipe shall be approximately equal to the width of the constructed wetland unit. The tube hole density should be uniform, and the size and spacing of the tube holes depend on in the sewage flow and the hydraulic conditions of the inlet and outlet water, the pipe hole spacing should not be greater than 10% of the width of the constructed wetland unit.
6.4.3.3 It is advisable to use a matrix with a larger particle size around the perforated pipe, the particle size of which should be larger than the perforation diameter of the pipe.
6.4.3.4 In cold areas, anti-freezing measures should be taken into account for the setting, distribution and inlet and outlet pipes.
6.4.3.5 The artificial wetland water can be drained, piped, well-discharged, etc., and the overflow level, adjustable pipe and gate have water level adjustment.
Features of the facility.
6.4.3.6 When the amount of water generated by the constructed wetland is large and the drop is high, energy dissipation facilities should be installed.
6.4.3.7 Emptying facilities shall be provided for the effluent of constructed wetlands.
6.4.4 Dredging and ventilation
6.4.4.1 A dredging device shall be provided at the bottom of the submerged artificial wetland.
6.4.4.2 Vertical submerged flow Constructed wetland may be provided with a snorkel connected to the drain pipe at the bottom of the constructed wetland and with the drain pipe diameter the same.
6.4.5 Matrix
6.4.5.1 The choice of substrate shall be determined by factors such as mechanical strength, specific surface area, stability, porosity and surface roughness of the substrate.
6.4.5.2 The selection of the substrate shall be based on the principle of the nearest material, and the selected matrix shall meet the particle size range required by the design.
6.4.5.3 When there is a high requirement for the concentration of nitrogen and phosphorus in the effluent, it is recommended to use a functional matrix to improve the efficiency of nitrogen and phosphorus treatment.
6.4.5.4 The initial porosity of the subsurface flow constructed wetland substrate layer should be controlled at 35% to 40%.
6.4.5.5 The thickness of the subsurface flow constructed wetland substrate layer should be greater than the deepest point that the plant root system can reach.
6.4.6 Wetland plant selection and planting
6.4.6.1 The constructed wetland should have strong anti-pollution ability, developed root system, good decontamination effect, anti-freezing and anti-pest and disease resistance, and certain Native plants that are value-for-money and easy to manage. When the effluent from the constructed wetland is directly discharged into rivers and lakes, the foreign investment such as "Eichhornia crassipes" should be carefully selected.
Invasive species.
6.4.6.2 Constructed wetlands may be planted with one or more plants as dominant species to increase plant diversity and have a landscape effect.
6.4.6.3 Submerged artificial wetlands may choose reed, bulrush, alfalfa, lotus, cress, water onion, alfalfa, cattail, lycopodium, calamus, water Ophiopogon, windmill grass, rush grass and other water plants. The surface flow constructed wetland can choose the water plants such as calamus and rush grass; the water hyacinth, duckweed and sleep Floating plants such as lotus; submerged plants such as Elodea, C. algae, Ceratophyllum, and Hydrilla verticillata.
6.4.6.4 Planting of constructed wetland plants includes root seedling transplanting, seed propagation, transplanting of harvested plants, and potted transplants.
6.4.6.5 Planting wetted plants should be planted in spring.
6.4.6.6 The planting density can be adjusted according to the plant species and engineering requirements. The planting density of the emergent plants should be 9-25 plants/m2.
The planting density of water plants and submerged plants should be 3-9 strains/m2.
6.4.6.7 Vertical subsurface flow constructed wetland plants should be planted on a substrate with a high permeability coefficient. Plants in horizontal subsurface flow constructed wetlands should be planted on the soil.
6.4.6.8...
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 11 pages — is available in the English PDF.
Referenced standards
Normative references
- GB 12348Emission standard for industrial enterprises noise at boundary
- GB/T 12801General principles for the requirements of safety and health in production process
- GB 14554Emission standards for odor pollutants
- GB 18918Discharge standard of pollutants for municipal wastewater treatment plant
- GB 50013Standard for design of outdoor water supply engineering
- GB 50014Code for design of outdoor wastewater engineering
GB 50003 · GB 50011 · GB 50034 · GB 50052 · GB 50053 · GB 50069 · GB 50140 · GB 50204 · GB 50231 · GB 50268 · GB 50335 · GB/T 13663
How to Download HJ 2005-2010
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 12348-2008 — Emission standard for industrial enterprises noise at boundary
GB 14554-1993 — Emission standards for odor pollutants
GB 18918-2002 — Discharge standard of pollutants for municipal wastewater treatment plant