Valid

HG 20226-2015Code for construction and acceptance of tubular furnace installation works (English PDF)

管式炉安装工程施工及验收规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (30 pages)

Need quotation for your management?

Get a formal quotation for HG 20226-2015 in 30 minutes.

Issued by

MIIT

Level / Type

Industry · Mandatory

Issue date

April 30, 2015

Implementation date

October 1, 2015

Scope

HG 20226-2015 is the English-translated version of 管式炉安装工程施工及验收规范.

This standard sets out the requirements for the construction and acceptance of installation work on pipe heaters, also known as tube furnaces. It covers the installation work carried out in oil refining and chemical plants, from the erection of the furnace through to the checks that have to be passed before the installation is accepted.

The standard applies to tube furnace installations in refining and chemical facilities. It does not apply to the installation and acceptance of steam boilers, which are covered by their own rules.

Construction and acceptance are addressed together, so that the party doing the work and the party accepting it are held to the same set of requirements.

Found what you need?

Document preview — HG 20226-2015

National Standard of the People's Republic of China

ICS
71.120
Replacing
HGJ 226-1987

Issued by: Ministry of Industry and Information Technology of the People's Republic of China

Contents

  • [Preview only]
  • 1 General Provisions
  • 1.1 Pursuant Laws and Regulations
  • 1.2 Scope
  • 1.3 Design and Manufacturing Organization
  • 1.4 Definitions
  • 1.5 Load
  • 1.6 Thickness
  • 1.7 Permissible Stress
  • 1.8 Pressure Test and Compactness Test
  • 2 Terms
  • 2.1 General Requirements of Materials
  • 2.2 Grey Cast Iron
  • 2.3 Spheroidal Graphite Cast Iron
  • 2.4 Malleable Cast Iron
  • 2.5 Corrosion Resistant High Silicon Cast Iron
  • 2.6 Heat Resistant Cast Iron
  • 2.7 Carbon Cast Steel and Acid-Resistant Stainless Cast Steel
  • 2.8 Heat-Resistant Cast Steel
  • 3 Basic requirements
  • 3.1 General Principles
  • 3.2 Calculation of Tower Vessel
  • 3.3 Calculation of Shells under External Pressure
  • 4 Degreasing of equipment
  • 4.1 General Principle and Precautions for Structural Design
  • 4.2 Characteristics of Structural Design of Different Cast Materials
  • 4.3 Design of Cast Node
  • 4.4 Structure Design for Casting Vessel Parts
  • 4.5 Structural Design of Tower Vessel
  • 4.6 Prevention against accidental injuries such as mechanical injury and falling
  • 5 Degreasing of pipeline and pipeline components
  • 5.1 Static Equipment and Pipeline System
  • 5.2 Electrical System
  • 5.3 Instruments and Control System
  • 5.4 Rotating Equipment/Machinery Run-in
  • 5.5 Furnace Drying
  • 5.6 Repair of Casting Defect
  • 5.7 General Requirements for Inspection
  • 5.9 Destructive Test of Hydraulic Pressure for Cast Iron Vessel
  • 6 Degreasing of instruments and instrument components
  • 6.1 General Requirements for Cold Commissioning
  • 6.2 Simulation Running of Unit or System
  • 6.3 Boiling out of Steam Generator
  • 6.4 Passivation of Equipment and Pipeline System
  • 6.5 Filling of Catalyst, Molecular Sieve, Resin and Desiccant
  • 6.6 Tightness Test of Process System
  • 7 Inspection
  • 7.1 Safety and hygiene management institutions and personnel quota
  • 7.2 Safety and hygiene monitoring institutions
  • 7.3 Gas protection station
  • 7.4 Fire station
  • 7.5 Establishment of occupational disease prevention and control institutions
  • 8 Safety technology
  • 9 Division of Responsibilities

1 Foreword

HG 20226-2015 was issued by Ministry of Industry and Information Technology of the People's Republic of China on 30 April 2015 and has been in force since 1 October 2015.

The HG prefix, without a suffix, marks a mandatory standard: within its scope, compliance is required.

The document runs to 30 pages in English translation.

2 Scope Preview

This standard sets out the requirements for the construction and acceptance of installation work on pipe heaters, also known as tube furnaces. It covers the installation work carried out in oil refining and chemical plants, from the erection of the furnace through to the checks that have to be passed before the installation is accepted. The standard applies to tube furnace installations in refining and chemical facilities. It does not apply to the installation and acceptance of steam boilers, which are covered by their own rules. Construction and acceptance are addressed together, so that the party doing the work and the party accepting it are held to the same set of requirements.

HG 20226-2015 falls under ICS 71.120, in the field of chemical technology.

This catalogue holds 33 other HG standards in that field.

In this catalogue, HG standards carry edition years from 1975 to 2015.

3 Normative references

GB 50205

GB 50235

GB 50236

JB/T 4730

HG 20237

4 About this standard

Issued by: Ministry of Industry and Information Technology of the People's Republic of China

English translation: about 30 pages

5 Related standards

Standards on related subjects:

GB 50273-2022 — Standard for construction and acceptance of boiler installation engineering

GB 50275-2010 — Code for construction and acceptance of fan, compressor and pump installation

GB 50270-2010 — Code for construction and acceptance of conveyor equipment installation engineering

HG/T 20206-2017 — Code for construction and acceptance of chemical machinery installation engineering (Small and medium-sized reciprocating compressors)

HG/T 20205-2017 — Code for construction and acceptance of chemical machinery installation engineering (Centrifugal compressors)

6 Classification and status

International classification (ICS): 71.120

Prefix HG: mandatory standard.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 30 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of HG 20226

EditionTitleRevisionStatus
HG 20226-2015Code for construction and acceptance of tubular furnace installation workscurrent editionCurrent
HGJ 226-1987Code for construction and acceptance of tubular furnace installation worksprevious editionSuperseded

This page sells the current edition, HG 20226-2015. Earlier editions are listed for reference only.

How to Download HG 20226-2015

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
30 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

HG 20226-2015

$535.00