Scope
GB/Z 44765.3-2024 is the English-translated version of 用户端能源管理系统和电网侧管理系统间的接口 第3部分:架构.
GB/Z 44765.3-2024 adopts IEC TS 62746-3:2015 identically and gives the Chinese guidance architecture for the systems interface between customer energy management systems and power management systems.
It places resources that combine load, generation and storage, managed singly or as aggregated virtual resources, in response to grid or market signals, and it treats DER management systems as customer energy management systems.
The document describes the application areas, actors, roles, concepts and components of the architecture, then messaging and services: payload, message structure, transaction, query, event and state patterns, and publish and subscribe exchange.
Security, scalability and availability are also addressed, with annexes on requirements and message payload subsets. It was issued on 26 October 2024.
Found what you need?
Document preview — GB/Z 44765.3-2024
National Standard of the People's Republic of China
- ICS
- 29.240
- Classification
- F 21
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms, Definitions and Abbreviations
- 3.1 Terms and Definitions
- 3.2 Abbreviations
- 4 System Architecture Overview
- 4.1 Application Areas
- 4.2 Participants, roles and relationships
- 4.3 Concept
- 4.4 Components/Entities
- 5 Message Transmission and Services
- 5.1 Transmission Requirements
- 5.2 Standards supporting messaging
- 5.3 Message Payload
- 5.4 Message Structure
- 5.5 Message Passing Patterns
- 5.5.1 Overview
- 5.5.2 Transaction Request/Response Message Pattern
- 5.5.3 Query Request/Response Message
- 5.5.4 Event Message
- 5.5.5 State
- 5.6 Publish/Subscribe Messaging
- 6 Security
- 7 Scalability and Availability
- Appendix A (Informative) Requirement
- A.1 Overview
- A.2 Principle
- A.3 Additional functional requirements related to communication
- A.4 Non-functional requirements
- Appendix B (Informative) Message Payload Subset Reference
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.
This document is Part 3 of GB /Z 44765 "Interface between user-side energy management systems and grid-side management systems". GB /Z 44765 has published the following parts.
--- Part 3: Architecture.
This document is equivalent to IEC TS62746-3:2015 "Interface between user-side energy management system and grid-side management system Part 3 The document type was adjusted from IEC technical specification to my country's national standardization guidance technical document.
Introduction
The dispatching objects of distribution network are changing from traditional power supply equipment and large users to new user-side controllable resources such as energy storage, microgrid, virtual power plant, etc.
Rapid expansion requires standardization of the information interaction architecture from smart grid to smart home/smart building/industrial park, including message transmission and services, communication protocols, etc., to achieve the improvement of grid resilience, reliability and economy and energy saving and efficiency improvement for users.
The interface between the user-side energy management system and the grid-side management system is designed to build an interface between the user-side energy management system and the grid-side management system.
The information interaction model, which stimulates the response of distributed resources on the user side, is proposed to consist of the following parts.
--- Part 2: Use cases and requirements. The purpose is to describe the main pillars of interoperability to assist different technical committees in defining the scope of Covering the system interfaces and communication protocols for the entire chain from smart grid to smart home/smart building/industrial park.
--- Part 3: Architecture. The purpose is to establish an interface between the user-side energy management system and the grid-side management system. Architecture.
--- Part 10-1.Open Automated Demand Response. The purpose is to specify demand response (DR), pricing and distributed energy resources (DER) Minimal data model and services for communication.
--- Part 10-3.Open automated demand response - Smart grid user interface adapted to the IEC common information model.
A method is defined to implement a CIM subset containing a DR/DER information model and a utility smart grid user interface (SGUI) Bridging standards to map payloads.
This document defines an architecture for IEC 62746 that can be used for the management of user resources and DERs.
A resource is a combination of load, generation, and storage resources that can be managed in response to signals provided by the grid or market operator.
It can be identified and managed as a single resource with specific capabilities, or as a virtual resource with aggregated capabilities.
The architecture focuses on leveraging the Internet to connect grid operators, market operators, distribution system operators, electricity suppliers, aggregators, energy Communication between energy service providers and energy resources.
This document makes use of existing IEC standards. The data model of IEC 62746 is based on the Common Information Model and IEC 61850.
IEC 62746 is transport-independent.
The relationship between IEC 62746 and other IEC and ISO standards is shown in Figure 1.
1 Scope
This document is a standardized guiding technical document that establishes an interface between the user-side energy management system and the grid-side management system. System architecture. DER management system is also a user-side energy management system.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to this document.
IEC 62351 (all parts) Power systems management and information exchange data and communication security IEC TR62746-2 Interface between user-side energy management systems and grid-side management systems Part 2: Use cases and requirements (Sys- 3 Terms, definitions and abbreviations
3 Terms, Definitions and Abbreviations
3.1 Terms and Definitions
The following terms and definitions apply to this document.
3.1.1 Aggregation
Aggregate the functionality of multiple resources into one virtual resource.
NOTE: A common use of aggregation is to aggregate many small resources and provide functionality to the market as a single larger resource.
3.1.2 Cascading
When a message published in one communication domain causes another message to be published in one or more other communication domains at different levels of the hierarchy Events that occur during a break.
3.1.3 Communication domain
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 31 pages — is available in the English PDF.
Referenced standards
Normative references
IEC 62351
Similar standards
How to Download GB/Z 44765.3-2024
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/Z 102.17-2026 — Semiconductor devices - Discrete devices - Part 17: Magnetic and capacitive coupler for basic and reinforced insulation
GB/Z 103-2026 — Health informatics - The architecture of internet healthcare service network
GB/Z 108-2026 — Health informatics - Internet healthcare service pattern
GB/Z 44765.3-2024
$470.00