Valid

GB/T 9109.3-2014Dynamic measurement of petroleum and liquid petroleum products—Part 3: Technical requirements of installation for pipe prover (English PDF)

石油和液体石油产品动态计量 第3部分:体积管安装技术要求

Preview PDF

This is a limited preview

Buy now to download the full PDF (18 pages)

Need quotation for your management?

Get a formal quotation for GB/T 9109.3-2014 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 13, 2013

Implementation date

June 1, 2014

Scope

GB/T 9109.3-2014 is the English-translated version of 石油和液体石油产品动态计量 第3部分:体积管安装技术要求.

GB/T 9109.3-2014 is Part 3 of the Chinese national standard on the dynamic measurement of petroleum and liquid petroleum products and covers the design, installation, construction and acceptance of pipe prover systems.

It deals with the choice of prover, the design of the prover piping, of the water-draw calibration system and of the auxiliary systems, then with the installation work itself - preparation, the prover body, the hydraulic system, the instrument and control system, pressure testing, purging and cleaning - and with commissioning.

The general clause asks for a repeatability better than 0.02% when a custody-transfer meter is proved, skid-mounted factory-certified supply, and indoor installation in the cold north.

A normative appendix sets the prover volume range. It replaces GB/T 9109.3-1988, was issued on 13 December 2013 and has applied since 1 June 2014.

Found what you need?

Document preview — GB/T 9109.3-2014

National Standard of the People's Republic of China

ICS
75.180.30
Classification
E 98
Replacing
GB/T 9109.3-1988

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 General requirements
  • 4 System
  • 4.1 Prover Selection
  • 4.3 Design of water flooding method Verification System
  • 4.4 Auxiliary system design
  • 5 Installation
  • 5.1 Preparation before installation volume tube
  • 5.2 Installation of the volume of the tube body
  • 5.3 volume of hydraulic pipe system installation
  • 5.4 water flooding method verification system, auxiliary system installation
  • 5.5 instrumentation and control system installation
  • 5.6 Pressure Test
  • 5.7 purging and cleaning
  • 6 Commissioning
  • Appendix A (normative) prover range selection
  • Appendix B (informative) ultrasonic flowmeter test tube volume value volume recommended
  • Annex C (informative) volume tube mounting Step

Foreword

GB/T 9109 is divided into four parts.

--- GB/T 9109.1 Dynamic measurement of crude oil general principles;

--- GB/T 9109.2 Oil and dynamic measurement of liquid petroleum products - Part 2. flowmeter installation technical requirements;

--- GB/T 9109.3 dynamic measurement of oil and liquid petroleum products - Part 3: Volume tube mounting technical requirements;

--- GB/T 9109.5 Petroleum and liquid petroleum products - Calculation of oil dynamic measurement. This part of GB/T 9109 Part 3: This section drafted in accordance with GB/T 1.1-2009 given rules.

This Part replaces GB/T 9109.3-1988 "Dynamic measurement of crude oil fixed standard volume tube mounting technical requirements." This portion

GB/T 9109.3-1988 compared to the main changes in the technical content is as follows.

--- The standard name changed to "oil and liquid petroleum products dynamic measurement - Part 3. Volume tube mounting technical requirements";

--- Modify the scope, increase in oil and liquid petroleum products;

--- Modify the standard structure, an increase in Chapter 3;

--- Increasing the density meter tube import volume requirements to install filters;

--- Increase the requirements for the import and export volume of the tube temperature, pressure meter accuracy and installation position;

--- Increasing the volume of the tube outlet is calculated minimum backpressure;

--- Selection requirements increased volume of the tube;

--- Increasing the volume of one-way and two-way volume of tube pipe installation procedures;

--- Remove the imported contents of the installation of a small volume prover.

1 Scope

GB/T 9109 provisions of this part of the design of oil and liquid petroleum products dynamic volume metering pipe system design, installation, construction and acceptance skills requirement.

This section applies to petroleum and liquid petroleum products as the working medium volume line pipe fixed installation, the central station test tube volume, shift Acting prover can refer to use.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document.

GB/T 9109.1 Dynamic measurement of crude oil general principles

GB/T 17286.2 Liquid hydrocarbons - Dynamic measurement systems for volumetric meters - Part 2: Volume tube

GB 50093 Automation Instrumentation Construction and Quality Acceptance

GB 50231 mechanical equipment installation construction and acceptance of universal norms

GB 50235 industrial metal pipeline construction norms

GB 50253 pipeline engineering design

GB 50275 compressor,, fan pump installation engineering construction and acceptance

3 General requirements

3.3 meters - for the transfer test tube volume, the repeatability should be better than 0.02%.

3.4 volume pipe system design should be based on the selected flowmeter type, nominal diameter, number of units and other factors to consider, at an affordable original Choose fixed installation or mobile prover volume tube.

3.5 and meet the technical requirements under the premise of the overall arrangement, the volume of pipe installation system should ensure a stable flow pattern, the volume of pipe system layout, Fire safety should be consistent with the relevant provisions.

3.6 volume pipe system design, including design of the installation process, the water flooding method verification systems and auxiliary systems.

3.7 volume tube design system should meet the volume of pipe installation, operation, operation and maintenance requirements to ensure stable performance measurement system, accurate and reliable.

3.8 according to the geographical and climatic conditions, determine the volume of the tube is installed indoors or outdoors, and take appropriate measures to maintain the ambient temperature, at full Foot Prover operating environment requirements. Northern cold areas should be installed indoors; in the south can be installed outdoors, but avoid direct sunlight. body Plot of control system should be set up in the control room of the explosion and fire.

3.9 volume tube should be used to sled the whole supply, the factory certified by; split supply disassembly should be qualified and then boxed in factory test.

3.1 By volume as a standard metered tube station construction should follow the principle of GB/T 9109.1 given requirements

.

Basic Skills 3.2 volume pipe and auxiliary equipment requirements for the implementation of GB/T 17286.2 of the relevant provisions.

4 System Design

4.1 Prover Selection

4.1.1 ball prover should adopt fixed installation, DN150 following ball prover can be mobile; piston prover (or small capacity

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 18 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB/T 9109.3

EditionTitleRevisionStatus
GB/T 9109.3-2014Dynamic measurement of petroleum and liquid petroleum products—Part 3: Technical requirements of installation for pipe provercurrent editionCurrent
GB/T 9109.3-1988Dynamic measurement of petroleum and liquid petroleum products—Part 3: Technical requirements of installation for pipe proverprevious editionSuperseded

This page sells the current edition, GB/T 9109.3-2014. Earlier editions are listed for reference only.

How to Download GB/T 9109.3-2014

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
18 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 9109.3-2014

$315.00