Valid

GB/T 7679.4-2025Mining machinery terminology — Part 4: Mine hauling equipment (English PDF)

矿山机械术语 第4部分:矿用运输设备

Open the GB/T 7679.4-2025 preview as PDF

Preview — first pages of GB/T 7679.4-2025 (full document: 55 pages)

This is a limited preview

Buy now to download the full PDF (55 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

May 30, 2025

Implementation date

December 1, 2025

Scope

GB/T 7679.4-2025 is the English-translated version of 矿山机械术语 第4部分:矿用运输设备.

GB/T 7679.4-2025 is the Chinese national standard covering the vocabulary of everything that carries ore and men away from the face — the narrow gauge mine cars with their volume, gauge, wheelbase and coupler height, the tipping and man riding types, the trackless ore transporters with their braking and steering terms, the trackless surface vehicles, and the monorail cranes and aerial ropeways with the carrying, hauling, return and lifting ropes on which the whole load hangs. Part 4 of the series. It replaces GB/T 7679.4-2005, under the China Machinery Industry Federation. In force from 1 December 2025. Issued on 30 May 2025, it has been in force since 1 December 2025, replacing GB/T 7679.4-2005.

Document preview — GB/T 7679.4-2025

National Standard of the People's Republic of China

ICS
73.100.01
Classification
D 90
Replacing
GB/T 7679.4-2005

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • PrefaceIII
  • IntroductionIV
  • 1 Scope1
  • 2 Normative references1
  • 3 Terms and Definitions1
  • 3.1 Underground narrow-gauge transport vehicles1
  • 3.1.1 Basic terminology1
  • 3.1.2 Structural terms2
  • 3.1.3 Shuttle car3
  • 3.1.4 Bucket transfer truck8
  • 3.1.5 Fixed box mine car13
  • 3.1.6 Dump truck13
  • 3.1.7 Side-dumping mine car14
  • 3.1.8 Bottom-dumping mine car15
  • 3.1.9 Bottom side dumping mine car15
  • 3.1.10 Inclined shaft man-car16
  • 3.1.11 Lane Traffic18
  • 3.1.12 Material Cart18
  • 3.1.13 Flatbed truck19
  • 3.1.14 Special Purpose Vehicles1919
  • 3.1.15 Concrete mixer tank truck19
  • 3.1.16 Auxiliary equipment20
  • 3.2 Underground trackless transport vehicles27
  • 3.2.1 Basic terminology27
  • 3.2.2 Ore transporter28
  • 3.2.3 Auxiliary vehicles31
  • 3.3 Trackless ground transport vehicles33
  • 3.4 Suspension equipment34
  • 3.4.1 Monorail crane34
  • 3.4.2 Aerial ropeway3846
  • 3.4.3 Underground hanging transport equipment46
  • Index48

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.

This document is part 4 of GB/T 7679 "Mining Machinery Terminology". GB/T 7679 has published the following parts.

— Part 1: Mining equipment;

— Part 2: Loading equipment;

— Part 3: Lifting equipment;

— Part 4: Mining transport equipment;

— Part 5: Crushing and grinding equipment;

— Part 6: Mining screening equipment;

— Part 7: Washing equipment;

— Part 8: Roasting equipment.

This document replaces GB/T 7679.4-2005 "Mining machinery terminology Part 4: Mining transport equipment" and GB/T 7679.4- Compared with 2005, in addition to structural adjustments and editorial changes, the main technical changes are as follows.

a) Added the terms and definitions of concrete mixing tank truck (see 3.1.15);

b) Added brake system (see 3.2.2.2.1), service brake system (see 3.2.2.2.2), auxiliary brake system (see 3.2.2.2.3), parking brake system (see 3.2.2.2.4), Vehicle braking system (see 3.2.2.2.4), curb weight of the ore transport vehicle (see 3.2.2.2.5), drive axle (see 3.2.2.2.6), carriage lifting time (see 3.2.2.3.5), carriage lowering time (see 3.2.2.3.6), maximum traction (see 3.2.2.3.7), rated load (see 3.2.2.3.8), loading height (see 3.2.2.3.9), maximum height (see 3.2.2.3.10), underground material transport vehicle (see 3.2.3.1.2), underground Oil tanker (see 3.2.3.1.3), underground maintenance vehicle (see 3.2.3.1.4), underground lifting platform vehicle (see 3.2.3.1.5), underground crane vehicle (see 3.2.3.1.6), terms and definitions of boom lifts (see 3.2.3.2.6);

c) Added trackless ore transport vehicles for open-pit mines (see 3.3.1), minimum turning diameter (see 3.3.2), emergency steering system (see 3.3.3), Terms and definitions of emergency brake system (see 3.3.4);

d) Added the terms and definitions of hydraulic self-propelled equipment transporter (see 3.4.1.7) and frame-type pneumatic crane (see 3.4.1.8);

e) Added rope grips (see 3.4.2.3.29), movable rope grips (see 3.4.2.3.31), and removable rope grips (see 3.4.2.3.32) Terms and definitions;

f) Added mobile freight ropeway (see 3.4.3.1.1), initial tension (see 3.4.3.1.2), maximum working tension of wire rope (see 3.4.3.1.3), 4.3.1.3), load-bearing rope (see 3.4.3.2.1), traction rope (see 3.4.3.2.2), return rope (see 3.4.3.2.3), lifting rope (see 3.4.

3.2.4), stable cable (see 3.4.3.2.5), and smart sports car (see 3.4.3.2.6).

Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.

This document was proposed by the China Machinery Industry Federation.

This document is under the jurisdiction of the National Technical Committee for Standardization of Mining Machinery (SAC/TC88).

This document was drafted by: Luoyang Mining Machinery Engineering Design and Research Institute Co., Ltd., Shanxi Xinfusheng Machinery Manufacturing Co., Ltd., Copper Lingmaohong Mechanical and Electrical Equipment Co., Ltd., Shanxi Xinfusheng Technology Co., Ltd., Qixia Dali Mining Machinery Co., Ltd., CITIC Heavy Industries Machinery Machinery Co., Ltd., Luoyang Zhengfangyuan Heavy Mining Machinery Inspection Technology Co., Ltd., Jiangxi Xintong Machinery Manufacturing Co., Ltd., and Pingxiang University.

The main drafters of this document are: Hu Xilei, Cheng Bo, Wei Shanshan, Zhu Aiguo, Song Dechang, Zhang Zhaokun, Tao Wenjia, Song Zhenqiang, Li Xiaoxiang and He Ping.

The previous versions of this document and the documents it replaces are as follows.

— First published as GB/T 7679.4-1987 in 1987 and first revised in 2005;

— This is the second revision.

Introduction

Terminology is a collection of names used to represent concepts in a specific discipline. It is one of the basic elements of standards and is an important part of scientific research, teaching, and technology.

GB/T 7679 "Mining Machinery Terminology" is based on the current situation of China's mining machinery industry.

A complete set of mining machinery industry terminology standards compiled based on international standards and foreign advanced standards.

It is one of the important basic industries that provides equipment for the mining and processing of materials, materials and fuels. It covers a wide range of areas and has a wide range of products.

The varieties are divided into the following parts.

— Part 1: Mining equipment. The purpose is to define the terms and definitions of mining machinery and mining equipment.

— Part 2: Loading equipment. The purpose is to define the terms and definitions of mining machinery loading equipment.

— Part 3: Hoisting equipment. The purpose is to define the terms and definitions of mining machinery and mining hoisting equipment.

— Part 4: Mining transport equipment. The purpose is to define the terms and definitions of mining machinery and mining transport equipment.

— Part 5: Crushing and grinding equipment. The purpose is to define the terms and definitions of mining machinery crushing and grinding equipment.

— Part 6: Mining screening equipment. The purpose is to define the terms and definitions of mining machinery and mining screening equipment.

— Part 7: Washing equipment. The purpose is to define the terms and definitions of mining mechanical washing equipment.

— Part 8: Roasting equipment. The purpose is to define the terms and definitions of mining machinery roasting equipment. Mining Machinery Terminology Part 4: Mining transport equipment

1 Scope

This document defines terms and definitions for mining haulage equipment.

This document is applicable to the design, scientific research, manufacturing, use, teaching, management, publishing, academic exchanges and international trade of mining transportation equipment. field.

2 Normative references

This document has no normative references.

3 Terms and definitions

3.1 Underground narrow-gauge transport vehicles

3.1.1 Basic terminology

3.1.1.1 Car volume

The geometric volume of the mine car when it is flat-packed.

3.1.1.2 Car load capacity

The product of the volume of the mine car and the loose density of the ore or material it contains.

3.1.1.3 Gauge

The distance between the inner edges of the rail heads of two rails on an underground narrow-gauge line.

Note. There are three types of underground narrow-gauge track gauges. 600mm, 762mm and 900mm.

3.1.1.4 Wheelbase

The distance between the center lines of the front and rear axles of the minecart.

3.1.1.5 hauling height

Connector height height of coupler The distance from the centerline of the mine car connector to the rail surface.

3.1.1.6 Minimum turning radiusminimumturningradius

< Underground narrow-gauge transport vehicle > The minimum curve radius of the two center lines of the rails through which the mine car can pass.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 55 pages — is available in the English PDF.

Editions of GB/T 7679.4

EditionTitleRevisionStatus
GB/T 7679.4-2025Mining machinery terminology - Part 4: Mine hauling equipmentcurrent editionCurrent
GB/T 7679.4-2005Mining machinery terminology -- Part 4: Mine haulingprevious editionIn force
GB/T 7679.4-1987Mining machinery vocabulary--Mine cars with narrow gaugeprevious editionObsolete

This page sells the current edition, GB/T 7679.4-2025. Earlier editions are listed for reference only.

How to Buy GB/T 7679.4-2025

  1. 1Add to cart. Click the "Buy GB/T 7679.4-2025" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
55 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 7679.4-2025

$980.00

$835.00for partners