Scope
GB/T 44134-2024 is the English-translated version of 电力系统配置电化学储能电站规划导则.
GB/T 44134-2024 is the planning guide for siting and sizing electrochemical energy storage stations on the Chinese power system. China is building grid batteries faster than anyone, largely because provinces require new renewable capacity to be paired with storage, and the question the guide answers is the one those mandates skip: how much storage, of what duration, at which point on the system actually helps. The answer differs by connection point, which is how the standard is organised. It sets the general requirements and the analysis of system requirements, then the configuration principles and methods for storage on the generation side, on the grid side and on the user side, each with the services expected of it and the sizing that follows. It took effect on 1 December 2024.
Document preview — GB/T 44134-2024
National Standard of the People's Republic of China
- ICS
- 27.180
- Classification
- F19
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword3
- 1 Scope4
- 2 Normative references4
- 3 Terms and definitions4
- 4 General requirements5
- 5 System requirements analysis6
- 6 Electrochemical energy storage station on the power supply side9
- 7 Electrochemical energy storage station on the grid side11
- 8 Electrochemical energy storage station on the user side12
Foreword
This document was issued on 28 May 2024 by the State Administration for Market Regulation; Standardization Administration of the PRC and takes effect on 1 December 2024.
It is a GB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.
1 Scope
GB/T 44134-2024 is the planning guide for siting and sizing electrochemical energy storage stations on the Chinese power system. China is building grid batteries faster than anyone, largely because provinces require new renewable capacity to be paired with storage, and the question the guide answers is the one those mandates skip: how much storage, of what duration, at which point on the system actually helps. The answer differs by connection point, which is how the standard is organised. It sets the general requirements and the analysis of system requirements, then the configuration principles and methods for storage on the generation side, on the grid side and on the user side, each with the services expected of it and the sizing that follows. It took effect on 1 December 2024.
This document specifies the system requirements analysis for electrochemical energy
storage station in power system, as well as the configuration principles and methods of
electrochemical energy storage station on the power supply side, grid side, and user
side.
This document applies to the planning and configuration of the electrochemical energy
storage station connected to power system at a voltage level of 10 (6) kV and above.
2 Normative references
The following documents are referred to in the text in such a way that some or all of
their content constitutes requirements of this document. For dated references, only the
version corresponding to that date is applicable to this document; for undated references,
the latest version (including all amendments) is applicable to this document.
GB 38755, Code on security and stability for power system
DL/T 2528, Basic terminology of electrical energy storage
3 Terms and definitions
For the purposes of this document, the terms and definitions given in DL/T 2528 and
the following apply.
3.1
electrochemical energy storage station
Energy storage station whose energy storage uses electrochemical energy storage media,
which mainly include: lithium-ion battery, lead-acid/lead-carbon battery, flow battery,
sodium-ion battery, sodium-sulfur battery, fuel cell, etc. Electrochemical energy storage
station is divided into three categories: power supply side, grid side, and user side
according to its access point location.
3.2
peak shaving
regulation resources, and demand-side response capabilities, and be determined in
combination with factors such as the construction conditions and construction period
of the energy storage project.
4.5 When the planning and implementation of the electrochemical energy storage
station differs significantly from expectations or there are major adjustments to the
energy and power plan, planning assessment and rolling adjustments shall be conducted.
Remaining clauses in the full document
- 4 General requirements
- 5 System requirements analysis
- 6 Electrochemical energy storage station on the power supply
- 7 Electrochemical energy storage station on the grid side
- 8 Electrochemical energy storage station on the user side
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Buy GB/T 44134-2024
- 1Add to cart. Click the "Buy GB/T 44134-2024" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 47310-2026 — Determination of total silicon, aluminium, iron, potassium, sodium, calcium, magnesium, manganese, phosphorus, titanium and sulfur in soil - Monochromatic excitation energy dispersive X-ray fluorescence spectrometry
GB/T 47321-2026 — Specification for the warning data exchange of the national emergency early warning dissemination system
GB/T 47293-2026 — Determination of available mercury in soil
Secure payment via Stripe
Payments accepted
GB/T 44134-2024
$215.00