GB/T 43555-2023Intelligent service - Predictive maintenance - Algorithm evaluation method (English PDF)
智能服务 预测性维护 算法测评方法
Open the GB/T 43555-2023 preview as PDF
This is a limited preview
Buy now to download the full PDF (28 pages)
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
December 28, 2023
Implementation date
July 1, 2024
Scope
GB/T 43555-2023 is the English-translated version of 智能服务 预测性维护 算法测评方法.
GB/T 43555-2023 specifies how to evaluate a predictive maintenance algorithm, and the need is acute because these algorithms are unusually easy to make look good. Failures are rare, so an algorithm that predicts nothing will fail is right almost all the time; accuracy is therefore a meaningless metric, and the numbers that matter are how many real failures were caught, how many false alarms were raised for each one, and - the metric most often omitted - how far in advance the warning came, since a correct prediction that arrives too late to act on has no value. Evaluation also depends entirely on the data: a model tested on the same run-to-failure dataset it was tuned on will report a performance it cannot repeat on a plant. This document specifies the classification of algorithm tests in predictive maintenance, the evaluation process, the test indicators, the evaluation requirements and the requirements on the evaluation data, and describes the test methods. Under ICS 25.040.40 and CCS N19, it is written for the vendors of predictive maintenance systems, for the manufacturers and asset owners buying them, and for the third-party evaluators asked to judge a claim.
Document preview — GB/T 43555-2023
National Standard of the People's Republic of China
- ICS
- 25.040.40
- Classification
- N19
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope1
- 2 Normative references1
- 3 Terms and Definitions1
- 4 Abbreviations2
- 5 General2
- 6 Evaluation objects2
- 7 Algorithm evaluation process3
- 6 Forecast error scoring index8
- 3 Test results11
- 4 Evaluation instructions12
- 23 Reference24
Foreword
This document complies with the provisions of GB/T 1:1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting: Please note that some content in this document may be subject to patents: The publisher of this document assumes no responsibility for identifying patents: This document is proposed by China Machinery Industry Federation: This document is under the jurisdiction of the National Industrial Process Measurement Control and Automation Standardization Technical Committee (SAC/TC124): This document was drafted by: Institute of Comprehensive Technology and Economics of Mechanical Industry Instrumentation, China University of Petroleum (Beijing), Tsinghua University, Chongqing Post Office University of Posts and Telecommunications, Central Research Institute of Shanghai Electric Group Co:, Ltd:, Hefei Institute of Physical Sciences, Chinese Academy of Sciences, Beijing University of Posts and Telecommunications, Beijing Mercedes-Benz Automobile Co:, Ltd:, Weichai Power Co:, Ltd:, Beijing Tianze Zhiyun Technology Co:, Ltd:, Shanghai Dazhi Technology Co:, Ltd:, Frequency Explore Intelligent Technology Jiangsu Co:, Ltd:, Shanghai Huaxing Digital Technology Co:, Ltd:, Hefei Comprehensive National Science Center Energy Research Institute (Anhui Provincial Energy Laboratory), Siemens (China) Co:, Ltd:, Schaeffler (China) Co:, Ltd:, SKF Green Intelligent Technology (Shanghai) Co:, Ltd: Division, Schneider Electric (China) Co:, Ltd:, Mitsubishi Electric Automation (China) Co:, Ltd:, Endress+Hauser (China) Automation Co:, Ltd:, Dandong Huatong Measurement and Control Co:, Ltd:, Beijing Yinghuada Power Electronics Engineering Technology Co:, Ltd:, Taixing Boyang Integrated Technology Co:, Ltd:, Wuhan Dong Yan Intelligent Design Research Institute Co:, Ltd:, Delta Electronics Enterprise Management (Shanghai) Co:, Ltd:, Huawei Technologies Co:, Ltd:, and China General Nuclear Power Research Institute have Co:, Ltd:, Xi'an Jiaotong University, Beihang University, Chongqing University, Shanghai Jiaotong University, China Jiaotong University, Chongqing Sichuan Instrument Automation Co:, Ltd: Wang Yue, Gong Tao, Qiao Jingyu, Jin Xuebo, Yang Baojun, Ning Guoyun, Wang Peng, Liu Jia, Chen Chao, Ren Zhigang, Tian Qin, Qu Qianshang, Du Xuefei, Tang Huan, Zhang Qingjun, Sun Fengcheng, Xie Peng, Zhang Fengli, Guo Xiaohui, Guo Xiaoxi, Lin Juan:
Predictive maintenance has gradually developed into the main mode of operation and maintenance services, and has been widely used in many industries: Algorithms are predictions The core of whether predictive maintenance can be effectively implemented requires a standardized evaluation system to scientifically and reasonably evaluate the accuracy and effectiveness of predictive maintenance algorithms: ity and applicability: Predictive maintenance is aimed at equipment or components in various industries, using signal analysis such as vibration, image, current, and voiceprint as a means, combined with a new generation of information It uses information technology to carry out condition monitoring, fault diagnosis and remaining life prediction, formulate operation and maintenance decision-making plans and arrange reasonable maintenance activities for new equipment operations: Dimensional model: This document targets conditions monitoring, fault diagnosis, life prediction and other algorithms in predictive maintenance, and extracts common tests in the industry: Evaluation indicators and methods, establish a universal algorithm evaluation system, and provide support for application and promotion in various industries: Practitioners of predictive maintenance are usually divided into equipment users, equipment manufacturers and solution providers: This document is for the above-mentioned practitioners Provide evaluation basis for personnel, such as providing important support materials for equipment users' procurement and acceptance, and describing equipment manufacturers and solution providers Provides basis for the advantages of the predictive maintenance technology solutions it provides: Intelligent service predictive maintenance algorithm evaluation method
1 Scope
GB/T 43555-2023 specifies how to evaluate a predictive maintenance algorithm, and the need is acute because these algorithms are unusually easy to make look good. Failures are rare, so an algorithm that predicts nothing will fail is right almost all the time; accuracy is therefore a meaningless metric, and the numbers that matter are how many real failures were caught, how many false alarms were raised for each one, and - the metric most often omitted - how far in advance the warning came, since a correct prediction that arrives too late to act on has no value. Evaluation also depends entirely on the data: a model tested on the same run-to-failure dataset it was tuned on will report a performance it cannot repeat on a plant. This document specifies the classification of algorithm tests in predictive maintenance, the evaluation process, the test indicators, the evaluation requirements and the requirements on the evaluation data, and describes the test methods. Under ICS 25.040.40 and CCS N19, it is written for the vendors of predictive maintenance systems, for the manufacturers and asset owners buying them, and for the third-party evaluators asked to judge a claim.
This document stipulates the algorithm test classification, evaluation process, test indicators, evaluation requirements and evaluation data requirements in predictive maintenance: Description test method: This document is suitable for the testing and evaluation of algorithms such as condition monitoring, fault diagnosis, and life prediction in predictive maintenance:
2 Normative reference documents
The contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document:
GB/T 40571-2021 General requirements for predictive maintenance of intelligent services
3 Terms and definitions
The following terms and definitions apply to this document: 3:1 conditionmonitoringconditionmonitoring Detect and collect information and data reflecting machine status:
Note: If a malfunction or failure occurs, the machine condition deteriorates: [Source: GB/T 20921-2007,2:5] 3:2 fault diagnosis faultdiagnosis The examination of symptoms and syndromes in order to determine the nature (type, condition, extent) of a malfunction or failure: [Source: GB/T 20921-2007, 2:6, with modifications] 3:3 life predictionlifeprediction Analyze the symptoms of failure to estimate future status and remaining service life:
Note: Life prediction usually refers to remaining service life prediction: [Source: GB/T 20921-2007, 2:16, with modifications] 3:
4 Continuous or intermittent maintenance based on observed conditions to monitor, diagnose or predict the condition of a structure, system or component status indicators: [Source: GB/T 40571-2021, 3:5, with modifications] 3:5 confidencelevel A quality criterion indicating how correct the diagnosis/prediction is:
Note 1: It is expressed as a percentage:
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 28 pages — is available in the English PDF.
Referenced standards
Similar standards
GB 38031-2025|GB/T43555-2023|GB/T 1|GB/T 40571-2021|GB/T 20921-2007|GB/T 41251|GB/T 32828|GB/T 17213.4
How to Buy GB/T 43555-2023
- 1Add to cart. Click the "Buy GB/T 43555-2023" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 40571-2021 — Intelligent service—Predictive maintenance—General requirements
GB/T 47310-2026 — Determination of total silicon, aluminium, iron, potassium, sodium, calcium, magnesium, manganese, phosphorus, titanium and sulfur in soil - Monochromatic excitation energy dispersive X-ray fluorescence spectrometry
GB/T 47321-2026 — Specification for the warning data exchange of the national emergency early warning dissemination system
Secure payment via Stripe
Payments accepted
GB/T 43555-2023
$500.00