GB/T 43526-2023Technical requirements for connecting user-side electrochemical energy storage system to distribution network (English PDF)

用户侧电化学储能系统接入配电网技术规定

Open the GB/T 43526-2023 preview as PDF

Preview — first pages of GB/T 43526-2023 (full document: 20 pages)

This is a limited preview

Buy now to download the full PDF (20 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 28, 2023

Implementation date

July 1, 2024

Scope

GB/T 43526-2023 is the English-translated version of 用户侧电化学储能系统接入配电网技术规定.

GB/T 43526-2023 sets the terms on which a battery storage system installed behind a customer's meter is allowed onto the distribution network. The overall requirements settle the connection voltage level, decided by weighing the capacity the customer has declared, the rated power of the storage system and the way it will be used, rather than by a rule of thumb. Power control follows, with the active and reactive control modes chosen to match the application and the connection voltage, then fault ride-through, operational adaptability, power quality, and the start-stop clause that keeps the act of switching the system in or out from disturbing the supply. Relay protection has to meet reliability, selectivity, sensitivity and speed at the point of connection; information and communication cover the operating data, energy readings, remote control and remote regulation signals, and the alarm and protection records the system must make available. Metering and the grid connection test and evaluation close the document. A user-side battery is invisible to the network operator until it misbehaves, tripping on a disturbance the grid would have ridden through or feeding a fault it should have stopped feeding, so industrial and commercial users, EPC contractors, storage suppliers and distribution utilities need one set of conditions they can all design and test against.

Document preview — GB/T 43526-2023

National Standard of the People's Republic of China

ICS
27.180
Classification
F 19

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword3
  • 1 Scope4
  • 2 Normative References4
  • 3 Terms and Definitions5
  • 4 Overall Requirements6
  • 5 Power Control7
  • 6 Fault Ride-through8
  • 7 Operational Adaptability13
  • 8 Power Quality15
  • 9 Start-stop16
  • 10 Relay Protection16
  • 11 Information and Communication17
  • 12 Electric Energy Metering18
  • 13 Grid Connection Test and Evaluation18
  • Bibliography20

Foreword

This document was issued on 28 December 2023 by the State Administration for Market Regulation; Standardization Administration of the PRC and takes effect on 1 July 2024.

It is a GB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.

1 Scope

GB/T 43526-2023 sets the terms on which a battery storage system installed behind a customer's meter is allowed onto the distribution network. The overall requirements settle the connection voltage level, decided by weighing the capacity the customer has declared, the rated power of the storage system and the way it will be used, rather than by a rule of thumb. Power control follows, with the active and reactive control modes chosen to match the application and the connection voltage, then fault ride-through, operational adaptability, power quality, and the start-stop clause that keeps the act of switching the system in or out from disturbing the supply. Relay protection has to meet reliability, selectivity, sensitivity and speed at the point of connection; information and communication cover the operating data, energy readings, remote control and remote regulation signals, and the alarm and protection records the system must make available. Metering and the grid connection test and evaluation close the document. A user-side battery is invisible to the network operator until it misbehaves, tripping on a disturbance the grid would have ridden through or feeding a fault it should have stopped feeding, so industrial and commercial users, EPC contractors, storage suppliers and distribution utilities need one set of conditions they can all design and test against.

This document specifies the technical requirements for power control, fault ride-through,

operational adaptability, power quality, start-stop, relay protection, information and

communication, and electric energy metering of electrochemical energy storage systems

connected to user’s distribution network, as well as grid connection test and evaluation.

This document is applicable to the construction, access, commissioning, testing, inspection and

operation of newly constructed, re-constructed and expanded electrochemical energy storage

systems connected to the user’s distribution network at a voltage level of 220 V and above.

Electrochemical energy storage systems connected to the public power grid at a voltage level

of 380 V / 220 V may take this as a reference in implementation.

2 Normative References

The contents of the following documents constitute indispensable clauses of this document

through the normative references in the text. In terms of references with a specified date, only

versions with a specified date are applicable to this document. In terms of references without a

specified date, the latest version (including all the modifications) is applicable to this document.

GB/T 12325 Power Quality - Deviation of Supply Voltage

GB/T 12326 Power Quality - Voltage Fluctuation and Flicker

GB/T 13955 Installation and Operation of Residual Current Operated Protective Devices

GB 14050 Types and Safety Technical Requirements of System Earthing

GB/T 14285 Technical Code for Relaying Protection and Security Automatic Equipment

GB/T 14549 Quality of Electric Energy Supply - Harmonics in Public Supply Network

GB/T 15543 Power Quality - Three-phase Voltage Unbalance

GB/T 17215.321 Electricity Metering Equipment (AC) - Particular Requirements - Part 21:

Static Meters for Active Energy (classes A, B, C, D and E)

GB/T 19862 General Requirements for Monitoring Equipment of Power Quality

3.3 point of connection

The connection point between the electrochemical energy storage system and the user’s internal

distribution network.

NOTE: for energy storage systems with a boosting transformer, the point of connection refers to

the bus or node on the high-voltage side of the boosting transformer. For energy storage

systems without the boosting transformer, the point of connection refers to the output

aggregation point of the energy storage system.

3.4 primary frequency control; PFC

When the power system frequency deviates from the target frequency, the control function of

the electrochemical energy storage system to automatically adjust the active power in response

to the system frequency deviation.

[source: GB/T 40595-2021, 3.1, modified]

Remaining clauses in the full document

  • 3 Terms and Definitions
  • 4 Overall Requirements
  • 5 Power Control
  • 6 Fault Ride-through
  • 7 Operational Adaptability
  • 8 Power Quality
  • 9 Start-stop
  • 10 Relay Protection
  • 11 Information and Communication
  • 12 Electric Energy Metering
  • 13 Grid Connection Test and Evaluation

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 20 pages — is available in the English PDF.

Referenced standards

Normative references

Similar standards

How to Buy GB/T 43526-2023

  1. 1Add to cart. Click the "Buy GB/T 43526-2023" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
20 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 43526-2023

$260.00

$220.00for partners