GB/T 43034.3-2023Integrated circuits - Measurement of impulse immunity - Part 3: Non-synchronous transient injection method (English PDF)
This is a limited preview
Buy now to download the full PDF (21 pages)
Need quotation for your management?
Get a formal quotation for GB/T 43034.3-2023 in 30 minutes.
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
September 7, 2023
Implementation date
January 1, 2024
Scope
GB/T 43034.3-2023 (Integrated circuits - Measurement of impulse immunity - Part 3: Non-synchronous transient injection method) is available as an English-translated PDF.
This document specifies the method for measuring the immunity of integrated circuits to standard conducted electrical transient disturbances, where the disturbance is applied to the IC pins through a coupling network asynchronously with the operation of the device under test.
The method allows the relation between a conducted electrical transient disturbance and the degradation it causes in the IC's performance to be obtained and classified, whether or not the disturbance falls within the IC's specified operating voltage range.
It is the third part of the standard on the measurement of impulse immunity of integrated circuits, and covers the non-synchronous transient injection method.
Found what you need?
Document preview — GB/T 43034.3-2023
National Standard of the People's Republic of China
- ICS
- 31.200
- Classification
- L 56
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative reference documents
- 3 Terms and Definitions
- 4 Overview
- 5 Coupling network
- 5.1 General
- 5.2 Power injection network
- 5.3 Input pin injection
- 5.4 Output pin injection
- 5.5 Multiple pins injected simultaneously
- 6 IC Configuration and Evaluation
- 6.1 IC configuration and operating modes
- 6.2 IC monitoring
- 6.3 IC performance classification
- 7 Test conditions
- 7.1 General
- 7.2 Electromagnetic environment
- 7.3 Ambient temperature
- 7.4 IC supply voltage
- 8 Test equipment
- 8.1 General requirements for test equipment
- 8.2 Cable
- 8.3 Shield
- 8.4 Transient Generator
- 8.5 Power
- 8.6 Monitoring and stimulation equipment
- 8.7 Control unit
- 9 Test layout
- 9.1 General
- 9.2 EMC test board
- 10 Test Procedure
- 10.1 Pilot Plan
- 10.2 Test preparation
- 10.3 Coupled pulse characteristics
- 10.4 Pulse Immunity Measurement
- 10.5 Explanation and comparison of test results
- 10.6 Transient Immunity Acceptance Level
- 11 Test report
- Appendix A (informative) Test board requirements
- Appendix B (Informative) Tips for Selecting Coupling and Decoupling Network Component Values
- Appendix C (informative) Industrial environment and consumer environment tests
- Appendix D (Informative) Vehicle Environmental Test
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.
This document is Part 3 of GB/T 43034 "Measurement of Pulse Immunity of Integrated Circuits". GB/T 43034 has released the following part.
---Part 3: Non-synchronous transient injection method.
This document is equivalent to IEC 62215-3:2013 "Measurement of pulse immunity of integrated circuits - Part 3: Non-synchronous transient injection method".
Introduction
In order to standardize the pulse immunity measurement of integrated circuits and provide pulse immunity measurement methods for integrated circuit manufacturers and testing institutions.
Method, GB/T 43034 specifies the general conditions, definitions and test procedures for different injection measurement methods of integrated circuit pulse immunity measurement. The test requirements are planned to consist of 2 parts.
---Part 2: Synchronous transient injection method. The purpose is to specify the test procedures and test requirements for the synchronous transient injection method.
---Part 3: Non-synchronous transient injection method. The purpose is to specify the test procedures and test requirements for the non-synchronous transient injection method.
1 Scope
This document specifies methods for measuring the immunity of integrated circuits (ICs) to standard conducted electrical transient disturbances. Run with device under test (DUT)
Asynchronous disturbance is applied to the IC pins through the coupling network. Regardless of whether the electrical transient disturbance is within the operating voltage range specified by the IC, this All methods can obtain and classify the correlation between conducted electrical transient disturbance and the IC performance degradation caused by it.
2 Normative reference documents
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document.
GB/T 17626.4-2018 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test (IEC 61000-4-4:2012,IDT)
GB/T 17626.5-2019 Electromagnetic compatibility testing and measurement technology surge (impact) immunity test (IEC 61000-4-5. 2014,IDT)
Note: There is no technical difference between the quoted content of GB/T 17626.5-2019 and the quoted content of IEC 61000-4-5:2005.
ISO 7637-2:2011 Electrical disturbances due to conduction and coupling in road vehicles Part 2: Conducted electrical transients along power lines
Note: GB/T 21437.2-2021 Test method for electrical disturbance caused by conduction and coupling from electrical/electronic components of road vehicles Part 2: Along power lines Electrical transient conducted emissions and immunity (ISO 7637-2:2011, MOD) (IEV)-Chapter131.Circuittheory]
Note: GB/T 2900.74-2008 Electrical Terminology Circuit Theory (IEC 60050-131:2002, MOD)
Note: GB/T 4365-2003 Electrical Terminology Electromagnetic Compatibility (IEC 60050-161:1990 A1.1997 A2.1998, IDT)
IEC 62132-4:2006 Measurement of electromagnetic immunity of integrated circuits (150kHz~1GHz) Part 4: Radio frequency power direct injection
3 Terms and definitions
The terms and definitions defined in IEC 60050-131 and IEC 60050-161 and the following apply to this document.
3.1 Auxiliary equipment
Non-EUT that is necessary to establish full functionality and determine correct performance (operation) of the device under test when exposed to disturbances.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 21 pages — is available in the English PDF.
Referenced standards
How to Download GB/T 43034.3-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 17626.4-2018 — Electromagnetic compatibility -- Testing and measurement techniques -- Electrical fast transient/burst immunity test
GB/T 17626.5-2019 — Electromagnetic compatibility - Testing and measurement techniques - Surge immunity test
GB/T 43034.2-2024 — Integrated circuits - Measurement of impulse immunity - Part 2: Synchronous transient injection method
Secure payment via Stripe
Payments accepted
GB/T 43034.3-2023
$485.00