Valid

GB/T 42317-2023Code for emergency exercises of electrochemical energy storage station (English PDF)

电化学储能电站应急演练规程

Open the GB/T 42317-2023 preview as PDF

Preview — first pages of GB/T 42317-2023 (full document: 22 pages)

This is a limited preview

Buy now to download the full PDF (22 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

March 17, 2023

Implementation date

October 1, 2023

Scope

GB/T 42317-2023 is the English-translated version of 电化学储能电站应急演练规程.

GB/T 42317-2023 sets out how an electrochemical energy storage station runs an emergency exercise against a production safety accident: how the exercise is planned, prepared, carried out, judged afterwards and fed back into the plan. Plan preparation starts from the station's own contingency plan and its actual situation. Work preparation builds the organisation the exercise needs, beginning with a commander-in-chief who is answerable for it, and the process implementation clause, much the longest, covers the filing with the relevant government departments, the notice given to the units involved, the record kept while the exercise runs, and the conduct of the exercise itself. Evaluation and summary and continual improvement close the loop, and an informative appendix gives implementation steps for cell fire exercises by chemistry, covering lithium-ion, lead-acid or lead-carbon, and sodium-ion cells. The reason for rehearsing lies in the failure mode: a cell that goes into thermal runaway takes the container with it faster than an unrehearsed crew can settle who is in charge, and the first minutes decide whether the event stays inside one rack. For storage station operators and their safety staff, for owners writing operation and maintenance contracts, and for the local emergency services who would be called out.

Document preview — GB/T 42317-2023

National Standard of the People's Republic of China

ICS
27.180
Classification
F 19

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword3
  • 1 Scope4
  • 2 Normative references4
  • 3 Terms and definitions4
  • 4 General requirements5
  • 5 Plan preparation6
  • 6 Work preparation6
  • 7 Process implementation10
  • 8 Evaluation and summary17
  • 9 Continual improvement17
  • Appendix A (Informative) Implementation steps of different types of cell fire emergency exercises18
  • References22

Foreword

This document was issued on 17 March 2023 by the State Administration for Market Regulation; Standardization Administration of the PRC and takes effect on 1 October 2023.

It is a GB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.

1 Scope

GB/T 42317-2023 sets out how an electrochemical energy storage station runs an emergency exercise against a production safety accident: how the exercise is planned, prepared, carried out, judged afterwards and fed back into the plan. Plan preparation starts from the station's own contingency plan and its actual situation. Work preparation builds the organisation the exercise needs, beginning with a commander-in-chief who is answerable for it, and the process implementation clause, much the longest, covers the filing with the relevant government departments, the notice given to the units involved, the record kept while the exercise runs, and the conduct of the exercise itself. Evaluation and summary and continual improvement close the loop, and an informative appendix gives implementation steps for cell fire exercises by chemistry, covering lithium-ion, lead-acid or lead-carbon, and sodium-ion cells. The reason for rehearsing lies in the failure mode: a cell that goes into thermal runaway takes the container with it faster than an unrehearsed crew can settle who is in charge, and the first minutes decide whether the event stays inside one rack. For storage station operators and their safety staff, for owners writing operation and maintenance contracts, and for the local emergency services who would be called out.

This document specifies the requirements for emergency exercise plan preparation,

work preparation, process implementation, evaluation and summary, as well as

continuous improvement for production safety accidents of electrochemical energy

storage station.

This document applies to emergency exercises of electrochemical energy storage

station with lithium-ion cell, flow cell, lead-acid (carbon) cell, sodium-ion cell, water-

electrolysis-produced hydrogen/fuel cell as energy storage carriers.

2 Normative references

The following documents, in whole or in part, are normatively referenced in this

document and are indispensable to its application. For dated references, only the version

corresponding to that date is applicable to this document; for undated references, the

latest version (including all amendments) is applicable to this document.

GB/T 42312, Guide for production safety emergency response plan of

electrochemical energy storage station

AQ/T 9008, Training syllabus and examination specification for work safety

emergency management professionals

AQ/T 9009, Specification for emergency exercises evaluation of production safety

accidents

AQ/T 9011, Guidelines for enterprises to assess emergency response plan on work

place accidents

DL/T 692, Electric power trade urgently saving technique rule

DL/T 2528, General terminology of electrical energy storage

3 Terms and definitions

Terms and definitions determined by DL/T 2528 and the following are applicable to

this document.

4.4 The emergency exercise of electrochemical energy storage station shall be reported

to the superior unit of the power station and the competent department of the local

government in advance. Also, the relevant surrounding units shall be notified and

informed of the relevant information of the emergency exercise.

4.5 Before the emergency exercise of electrochemical energy storage station, the

information such as the quantity, quality, and inspection status of the emergency

supplies and equipment shall be reviewed; after the exercise, the emergency supplies

shall be replenished in time, reviewed, and confirmed again.

Remaining clauses in the full document

  • 4 General requirements
  • 5 Plan preparation
  • 6 Work preparation
  • 7 Process implementation
  • 8 Evaluation and summary
  • 9 Continual improvement
  • Appendix A

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 22 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Buy GB/T 42317-2023

  1. 1Add to cart. Click the "Buy GB/T 42317-2023" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
22 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 42317-2023

$215.00

$185.00for partners