GB/T 41893-2022General requirements of logistics management for hull parts manufacturing digital workshop (English PDF)
船体零部件制造数字化车间物流管理基本要求
This is a limited preview
Buy now to download the full PDF (20 pages)
Need quotation for your management?
Get a formal quotation for GB/T 41893-2022 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
October 12, 2022
Implementation date
October 12, 2022
Scope
GB/T 41893-2022 is the English-translated version of 船体零部件制造数字化车间物流管理基本要求.
GB/T 41893-2022 sets the basic requirements for logistics management in a digital workshop that manufactures ship hull parts.
It names the objects to be managed, personnel, raw materials, parts and components, pallets, workstations and sites, and logistics equipment and tooling facilities, splits the logistics work into six successive stages, and builds the management system out of logistics planning, path planning simulation, workstation, part and pallet, equipment and tooling, buffer yard and data analysis functions, with an information flow clause covering networks and terminals, data capture and exchange with external systems; an informative annex gives coding examples for materials, hull parts, pallets, workstations and equipment.
It applies to planning, building and running such a workshop. Issued on 12 October 2022, it has applied since that date.
Found what you need?
Document preview — GB/T 41893-2022
National Standard of the People's Republic of China
- ICS
- 47.020.01
- Classification
- U 07
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Abbreviations
- 5 Logistics management object
- 5.1 Category
- 5.2 Personnel
- 5.3 Raw materials
- 5.4 Parts (components) and pallets
- 5.5 Workstation (Site)
- 5.6 Logistics equipment and tooling facilities
- 6 Logistics operations
- 6.1 Logistics operation stage
- 6.2 Flow chart of logistics operation
- 6.3 The first stage of logistics operations
- 6.4 The second stage logistics operation
- 6.5 The third stage logistics operation
- 6.6 Fourth stage logistics operation
- 6.7 The fifth stage of logistics operations
- 6.8 The sixth stage logistics operation
- 7 Logistics Management System
- 7.1 Composition
- 7.2 Logistics planning management
- 7.3 Path Planning Simulation Management
- 7.4 Workstation (site) management
- 7.5 Parts and pallet management
- 7.6 Management of logistics equipment and tooling facilities
- 7.7 Buffer Yard Management
- 7.8 Data Analysis Management
- 8 Logistics management system information flow
- 8.1 Network and Terminal
- 8.2 Information collection
- 8.3 Information Interaction Between Logistics Management System and External System
- Appendix A (Informative) Coding Example
- A.1 Raw material code
- A.2 Code of hull parts (components)
- A.3 Pallet code
- A.4 Workstation (site) code
- A.5 Coding of logistics equipment and tooling facilities
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" drafted.
1 Scope
This document specifies the logistics management objects, logistics management system and its information flow and logistics operations in the digital workshop of hull parts manufacturing. requirements.
This document applies to the planning, construction and management of digital workshop logistics for the manufacture of hull components.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document.
GB/T 12991.1-2008 Information Technology Database Language SQL Part 1: Framework (ISO /IEC 9075-1:2003, IDT)
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Hull parts manufacturing
In the process of building a ship in sections, according to the process requirements, from steel pretreatment, cutting, processing, small assembly, middle assembly to the process before the formation of subsections
Stage, the process of processing and combining steel into intermediate products such as parts and components (medium and small components).
3.2 Hull parts manufacturing digital workshop
Based on the technology and equipment required for the manufacture of hull parts, using information technology, automation, measurement and control technology, etc.
A workshop that connects different units in the workshop to plan, manage, diagnose and optimize the production operation process.
3.3 Logistics
In the digital workshop for the manufacture of hull parts, the raw materials, pallets, and intermediate products are realized in different process stages before and after through the carrier. transfer activities between.
3.4 Workshop
Using the processing technology of dividing lines and lanes into groups, using information technology to build a logistics management system, dispatching logistics-related resources, and driving logistics design.
Prepare, control the logistics status, and manage the logistics of the hull parts manufacturing digital workshop.
3.5 Buffer yard stagingarea
A temporary transfer site for materials (raw materials and hull parts).
Note: The buffer yard is the product when there is a gap between logistics management and just-in-time production.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 20 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download GB/T 41893-2022
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 12991.1-2008 — Information technology -- Database languages-SQL -- Part 1: framework
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
Secure payment via Stripe
Payments accepted
GB/T 41893-2022
$360.00