Scope
GB/T 41066.3-2022 is the English-translated version of 石油天然气钻采设备 海洋石油半潜式钻井平台 第3部分:操作和检验.
GB/T 41066.3-2022 is Part 3 of GB/T 41066 and sets the operating and inspection requirements for an offshore oil semi-submersible drilling platform once it has been delivered.
On operation it covers the general requirements and then moving the platform, running the positioning system and running the drilling system, followed by the precautions against tropical cyclones, internal wave currents, freezing and icing.
On inspection it classifies the inspections and covers the preparation beforehand, the statutory inspection, the class survey and special inspections. A normative annex lists the documents a platform needs in order to operate, and an informative annex gives the safety reserve time calculation table.
It applies to the operation and inspection of offshore oil semi-submersible drilling platforms. It was issued on 30 December 2022 and has applied since 1 July 2023.
Found what you need?
Document preview — GB/T 41066.3-2022
National Standard of the People's Republic of China
- ICS
- 75.180.10
- Classification
- E 92
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Abbreviations
- 5 operation
- 5.1 General requirements
- 5.2 Migration job
- 5.3 Positioning system operation
- 5.4 Drilling system operation
- 5.5 Anti-tropical cyclone
- 5.6 Anti-internal wave flow
- 5.7 Antifreeze and anti-icing
- 6 test
- 6.1 Inspection classification
- 6.2 Preparation before inspection
- 6.3 Statutory inspection
- 6.4 Class survey
- 6.5 Special inspection
- Appendix A (Normative) Documents Required for Platform Operation
- Appendix B (Informative) Safety reserve time calculation table
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents" drafting.
This document is part 3 of GB/T 41066 "Offshore Oil Semi-submersible Drilling Platforms for Oil and Gas Drilling Equipment".
GB/T 41066 has issued the following parts.
--- Part 1: Functional configuration and design;
--- Part 2: Construction, installation and commissioning acceptance;
--- Part 3: Operation and inspection.
Introduction
Semi-submersible drilling platform is the mainstream deepwater drilling equipment in the world. In recent years, my country has made great progress in the R&D and manufacturing of offshore drilling equipment.
Great progress has been made, and the independent design and construction of large-scale medium and deep water oil and gas equipment has been basically realized, and an echelon series has been formed in terms of equipment scale. To ensure that offshore drilling equipment has developed in an orderly and healthy manner. Offshore oil fixed platform module drilling rigs, offshore oil jack-up drilling platforms, and offshore rock drilling rigs have been established.
Oil semi-submersible drilling platform as the main line of the standard system. In this standard system, "offshore oil semi-submersible drilling platform" focuses on the It is planned to establish a quality control technology system covering the entire life cycle of the platform to provide technical support for the high-quality development of offshore oil and gas resources.
GB/T 41066 "Oil and Natural Gas Drilling Equipment for Offshore Oil Semi-submersible Drilling Platforms" consists of three parts.
--- Part 1: Functional configuration and design. The purpose is to standardize the overall configuration, equipment selection and design of semi-submersible drilling platforms.
--- Part 2: Construction, installation and commissioning acceptance. The purpose is to standardize the semi-submersible drilling platform construction and equipment installation, commissioning methods, Acceptance criteria.
--- Part 3: Operation and inspection. The purpose is to standardize the certification, operation and inspection requirements of semi-submersible drilling platforms after they are put into operation.
This document provides technical basis for platform operation and operation inspection, so that it has good safety operation guidelines and operation inspection methods.
1 Scope
This document specifies the operation and inspection requirements for offshore oil semi-submersible drilling platforms after delivery.
This document applies to the operation and inspection of offshore oil semi-submersible drilling platforms (hereinafter referred to as "platforms").
2 Normative references
The contents of the following documents constitute the essential provisions of this document through normative references in the text. Among them, dated references For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.
GB/T 3836.16 Explosive atmospheres Part 16: Inspection and maintenance of electrical installations
GB/T 19832 Inspection, maintenance, repair and remanufacturing of drilling and production lifting equipment for oil and gas industry
GB/T 25444.3 Mobile and fixed offshore installations electrical installations Part 3: Equipment
GB/T 30217.2 Drilling and oil production equipment for oil and gas industry - Part 2: Analysis method and operation of deep water drilling riser work and integrity
SY/T 6270 Use and maintenance of cementing and fracturing manifolds for oil and gas drilling and production equipment
SY/T 6564 Safety Code for Offshore Petroleum Operation System
SY/T 6632 Offshore Oil Safety Warning Signs
SY/T 6666 Recommended practices for the selection and maintenance of steel wire ropes for the oil and gas industry
SY/T 6667 Shunt system equipment and operation recommended practice
SY/T 6671 Classification recommended practice for Class I Zone 0, Zone 1 and Zone 2 of electrical equipment sites for petroleum facilities
SY/T 6868 Blowout prevention equipment system for drilling operations
SY/T 6962 Configuration and Installation Requirements for Offshore Drilling Equipment Well Control System
SY/T 10025 Pre-operation Inspection Specifications for Offshore Drilling Units
SY/T 10035 Drilling platform towing and positioning operation specification
3 Terms and Definitions
This document does not have terms and definitions that need to be defined.
4 Abbreviations
The following abbreviations apply to this document.
DP: Dynamic Positioning
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 16 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 3836.16Explosive atmospheres - Part 16: Specification of electrical installations inspection and maintenance
- GB/T 19832Petroleum and natural gas industries—Inspection, maintenance, repair and remanufacture of drilling and production hoisting equipment
- GB/T 25444.3Mobile and fixed offshore units - Electrical installations - Part 3: Equipment
- GB/T 30217.2Petroleum and natural gas industries -- Drilling and production equipment -- Part 2: Deepwater drilling riser analysis methodologies, operations and integrity
- SY/T 6270Petroleum natural gas drilling and production equipment. Operation and maintenance of cementing and fracturing manifold
- SY/T 6564The safety specification for tying-up utensils during offshore petroleum operations
SY/T 10035
Similar standards
How to Download GB/T 41066.3-2022
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 19832-2017 — Petroleum and natural gas industries—Inspection, maintenance, repair and remanufacture of drilling and production hoisting equipment
GB/T 25444.3-2023 — Mobile and fixed offshore units - Electrical installations - Part 3: Equipment
GB/T 30217.2-2016 — Petroleum and natural gas industries -- Drilling and production equipment -- Part 2: Deepwater drilling riser analysis methodologies, operations and integrity
Secure payment via Stripe
Payments accepted
GB/T 41066.3-2022
$255.00