GB/T 40655-2021Intelligent production order management system—Technical requirements (English PDF)
智能生产订单管理系统 技术要求
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 40655-2021 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
October 11, 2021
Implementation date
May 1, 2022
Scope
GB/T 40655-2021 is the English-translated version of 智能生产订单管理系统 技术要求.
GB/T 40655-2021 sets the technical requirements for software systems that manage production orders and schedule them intelligently. It defines the structure of such a system and then covers two modules.
The order management module must obtain production orders, basic data and job reporting information and balance production capacity. The intelligent scheduling module must recognise constraints, establish scheduling rules, run a scheduling optimisation model and let users visualise and manually adjust the schedule.
Terms such as production order, production plan, production schedule, independent demand and manufacturing calendar are defined with reference to GB/T 25109.1-2010.
Enterprises, research institutes and universities use it when developing and applying these systems. It was issued on 11 October 2021 and has applied since 1 May 2022.
Found what you need?
Document preview — GB/T 40655-2021
National Standard of the People's Republic of China
- ICS
- 35.240.50
- Classification
- L 67
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Abbreviations
- 5 Intelligent production order management system structure
- 6 Technical requirements for order management module
- 6.1 Overview
- 6.2 Obtaining Production Order
- 6.3 Basic data acquisition
- 6.4 Obtaining job reporting information
- 6.5 Balance of production capacity
- 7 Technical requirements for intelligent scheduling module
- 7.1 Overview
- 7.2 Recognition of Constraints
- 7.3 Establishment of scheduling rules
- 7.4 Intelligent scheduling optimization model
- 7.5 Schedule visualization and manual adjustment
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.
1 Scope
This document specifies the structure of the intelligent production order management system, the technical requirements of the order management module, and the technical requirements of the intelligent scheduling module.
This document is suitable for enterprises, research institutes, institutions of higher learning and other related institutions to carry out the development and application of intelligent production order management systems.
2 Normative references
The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.
GB/T 25109.1-2010 Enterprise Resource Planning Part 1: ERP Terminology
3 Terms and definitions
The following terms and definitions defined in GB/T 25109.1-2010 apply to this document.
3.1 Production order
The production tasks issued to the production workshop and required to be performed by the production workshop.
Note: The workshop organizes production and requisition of materials according to the production order.
3.2 Production plan
During the planning period, the enterprise plans to produce production tasks such as the variety, quantity, and quality of the products and arranges the production schedule.
3.3 Production schedule
Specify the processing procedures and start time and end time of each production order within the planned scope on the required resources.
3.4 Independent demand
The demand for a certain material that has nothing to do with the demand for other materials.
Note: For example, the demand for the final product, the demand for parts for destructive testing, the demand for repair parts, etc. [Source: GB/T 25109.1-2010, 4.3.9, with modification]
3.5 Manufacturing calendar; production calendar; factory calendar
A calendar dedicated to planning.
Note: Identifies the non-working days such as factory holidays, and indicates the effective date when various departments, workshops or work centers of the enterprise can work or produce. [Source: GB/T 25109.1-2010, 4.2.10, with modification]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
Similar standards
How to Download GB/T 40655-2021
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 25109.1-2010 — Enterprise resource planning - Part 1: ERP terms
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
Secure payment via Stripe
Payments accepted
GB/T 40655-2021
$135.00