GB/T 25109.1-2010Enterprise resource planning - Part 1: ERP terms (English PDF)
企业资源计划 第1部分:ERP术语
This is a limited preview
Buy now to download the full PDF (33 pages)
Need quotation for your management?
Get a formal quotation for GB/T 25109.1-2010 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
September 2, 2010
Implementation date
December 1, 2010
Scope
GB/T 25109.1-2010 is the English-translated version of 企业资源计划 第1部分:ERP术语.
GB/T 25109.1-2010 is the Chinese standard "Enterprise resource planning - Part 1: ERP terms". Its scope clause reads: This section GB/T 25109 specifies the terms and definitions of ERP.
This section applies to research, product development, consulting, training and application of ERP. ERP and other fields related to adoption can also reference. Its clauses include basic terms and definitions.
Found what you need?
Document preview — GB/T 25109.1-2010
National Standard of the People's Republic of China
- ICS
- 35.240.50
- Classification
- L 67
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Introduction
- 1 Scope
- 2 Normative references
- 3 Basic terms and definitions
- 3.1 ERP Basic Concepts
- 4 manufacturing management system
- 4.1 Basic terminology
- 4.2 Master Production Schedule
- 4.3 Material Requirements Planning
- 4.4 Inventory Management
- 4.5 Capacity Requirements Planning
- 4.6 Production Control
- 5 Enterprise Logistics System
- 5.1 Purchasing Management
- 5.2 Sales Management
- 5.3 DRP
- 6 business cash flow system
- 6.1 Costing
- 6.2 Cost Control
- 6.3 General Ledger
- 6.4 Accounts Receivable Management
- 6.5 Accounts Payable Management
- 6.6 Fixed Assets Management
- 6.7 Payroll
- 6.8 Foreign Currency Management
- 6.9 Financial Management
- 7 other enterprise resource management
- 7.1 Human Resource Management
- 7.2 Device Explorer
- 8 Quality Management System
- 8.1 Quality Management
- Appendix A (Informative Appendix) ERP-related terminology
- References
1 Scope
This section GB/T 25109 specifies the terms and definitions of ERP.
This section applies to research, product development, consulting, training and application of ERP. ERP and other fields related to adoption can also reference.
2 Normative references
The following documents contain provisions which, through reference GB/T 25109 in this section constitute provisions of this section. For dated reference documents
Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section
Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this section.
GB/T 18354-2006 logistics terminology
3 Basic Terms and Definitions
3.1 ERP Basic Concepts
3.1.1 Material Requirements Planning MaterialRequirementsPlanning; MRP
Using a series of product bill of materials (BOM) data, inventory data, and master production scheduling method of computing a set of technical material requirements.
MRP is used to determine in a given period of time. (1) the number of manufactured parts and materials required for these material items; (2) those parts with
Date material needs. MRP by order or order quantity and appropriate lead time to compensate for the net demand, building materials can give supplementary orders
Yee and unfinished orders MRP rearrangement recommendations.
3.1.2 Closed-loop Material Requirements Planning closed-loopMRP
In MRP basis, considering the capacity requirements planning and MRP implementation process feedback information, material requirements planning established
System that can be adjusted based on the feedback of MRP implementation process, thus ensuring effective implementation of MRP. The implementation process comprises
Production control process/output (capacity) measured, detailed scheduling and dispatching, as well as expected from factories and suppliers of both delayed reporting,
Supplier scheduling and the like.
3.1.3 Manufacturing Resource Planning ManufacturingResourcePlanning; MRPII
The method for manufacturing companies all the resources effective programs. In an ideal situation, quantify business and financial plans, and through the mold
I intend to answer what-if questions. MRPII by a variety of processes interrelated components. business planning, production planning (sales and operations planning),
Master production scheduling, material requirements planning, capacity requirements planning and execution capabilities and material support system. And the output data of these systems, such as
Business plan, purchase commitment report, shipping budget, and inventory maps showing the funds and other financial reporting integration. Manufacturing Resource Planning is a closed loop
MRP direct extension and expansion.
3.1.4 Enterprise resource planning EnterpriseResourcePlanning; ERP
Management, define and standardize business processes necessary to effectively plan and a framework for control of enterprises, ERP is built on information technology
Based on the integration of advanced modern enterprise management thinking, fully integrated enterprise logistics, information flow and capital flow, providing management, planning, control
GB/T 38672-2020 | GB/T 38666-2020 | GB/T 38633-2020 | GB/T 25109.5-2026 | GB/T 25109.4-2010 | GB/T 25109.3-2010 | […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 33 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download GB/T 25109.1-2010
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 25109.2-2010 — Enterprise resource planning-Part 2: ERP foundational data
GB/T 25109.3-2010 — Enterprise resource planning - Part 3: Functional component of ERP
GB/T 25109.4-2010 — Enterprise Resource Planning - Part4: ERP system architecture
Secure payment via Stripe
Payments accepted
GB/T 25109.1-2010
$500.00