Valid

GB/T 39565-2020Technical specification of flood control emergency command system for smart hydropower plant (English PDF)

智能水电厂防汛应急指挥系统技术规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 39565-2020 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 14, 2020

Implementation date

July 1, 2021

Scope

GB/T 39565-2020 is the English-translated version of 智能水电厂防汛应急指挥系统技术规范.

GB/T 39565-2020 is the Chinese standard "Technical specification of flood control emergency command system for smart hydropower plant".

Its scope clause reads: This standard specifies the basic requirements, main functions, main technical indicators and the main technical indicators of the flood control emergency command system (referred to as the system) for smart hydropower plants: acceptance: This standard applies to smart hydropower plants:. Its clauses include terms and definitions; basic requirements.

Found what you need?

Document preview — GB/T 39565-2020

National Standard of the People's Republic of China

ICS
27.100
Classification
F 23

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope1
  • 2 Normative references1
  • 3 Terms and definitions1
  • 4 Basic requirements1
  • 5 Main function2
  • 6 Main technical indicators4
  • 7 Acceptance4

1 Scope

This standard specifies the basic requirements, main functions, main technical indicators and the main technical indicators of the flood control emergency command system (referred to as the system) for smart hydropower plants:

acceptance:

This standard applies to smart hydropower plants:

2 Normative references

The following documents are indispensable for the application of this document: For dated reference documents, only the dated version applies to this article

Pieces: For undated references, the latest version (including all amendments) applies to this document:

GB/T 39264 Technical Specification for Integrated Management and Control Platform of Intelligent Hydropower Plant

DL/T 1547 Technical Guidelines for Smart Hydropower Plants

DL/T 1666-2016 Technical conditions for water dispatching automation system of hydropower station

SL330 Hydrological Information Coding

3 Terms and definitions

The following terms and definitions apply to this document:

3:1

Flood control emergency command system floodcontrolemergencycommandsystem

Based on the integrated management and control platform of smart hydropower plants, it provides decision-making support for flood prevention dispatching and emergency rescue and disaster relief:

Based on the real-time collection, processing and management of information such as traffic and industrial conditions, the realization of flood control information services, flood forecasting inquiry and analysis, and flood control dispatching methods

Application components for case analysis, flood prevention consultation support, and flood prevention emergency plan management:

3:2

Flood controlconsultation

According to information such as weather, rain and water conditions, working conditions, flood forecasts, and the actual situation of the flood control area, the flood control situation is discussed in the form of meeting

Perform comprehensive analysis and make decisions:

4 Basic requirements

4:1 The system should comply with DL/T 1547 regulations and should be incorporated into the unified planning and synchronous design of smart hydropower plants:

4:2 The system should meet the requirements of the safety protection regulations of the power monitoring system:

4:3 The system should be deployed in the management information area, should comply with GB/T 39264 regulations, be able to run on the

The ability of the station to exchange and process information, realize data sharing, and obtain weather, rain and water conditions, hydropower plant operation, construction conditions, dam safety monitoring and

Video surveillance and other information:

4:4 The system should have flood control information services, flood forecast query and analysis, flood control scheduling plan analysis, flood control consultation support, and flood control emergency response:

Case management, flood control mobile phone text messages, flood control material reserve and team management, and flood control duty management functions:

4:5 The system should adopt an open system structure with expandable functions and independent maintenance:

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 39565-2020

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 39565-2020

$105.00